If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-23341 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.844111,"lon":-80.000073,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Greene Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: MOSHOLDER 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2003-09-02 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 39.844111 | |
Longitude: -80.000073 |
Date | Event |
---|---|
2003-09-02 | New Permit Application |
2004-06-09 | Performed Spud Operation |
2004-06-17 | Drilling Completion |
2004-07-03 | Perforation |
2004-07-03 | Performed Stimulation |
2006-11-02 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2004-07-03 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2003 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2004 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | PENNECO OIL CO INC | 9214.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | PENNECO OIL CO INC | 5596.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PENNECO OIL CO INC | 3160.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | PENNECO OIL CO INC | 4307.00 | 365 | 2.00 | 365 | 0.00 | 0 |
2010 | PENNECO OIL CO INC | 3,544.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 2,659.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 2,149.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 2,155.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 1,655.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 1,668.27 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 1,415.90 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 1,536.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 1,236.01 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 883.70 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2004 | PENNECO OIL CO INC | Brine | 40.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2004 | PENNECO OIL CO INC | Brine | 1,200.00 Bbl | Municipal Sewage Treatment Plant | PA0026891 |
2009 | PENNECO OIL CO INC | Brine | 55.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1288762 | Primary Facility | 2003-11-19 | Routine/Complete Inspection | No Violations Noted | Appears start of surface prep. here. Graveled egress, 2 dozers, 2 backhoes, sighted. Cond. too muddy for work this date. Bench appears cut, access in progress. No road muddying here. General area much flooding throughout most lowlying areas. Not working here today. |
1309553 | Primary Facility | 2004-02-18 | Routine/Complete Inspection | No Violations Noted | Bench is cut, sed. fence set, pits excavated, rough waterbars on the access. Traps are made at bench area for sed. Bench is staked for rig. Old farm gate temporarily closed off access until weather & rig availability. Culvert tubing at site entrance. |
1331999 | Primary Facility | 2004-04-29 | Routine/Complete Inspection | No Violations Noted | Egress has a line of haybales across, due to wet conditions when bench was cut. Site awaits rig. Stack of culvert pipes await installation at farm driveway residence. Site awaits drilling & development. |
1346886 | Primary Facility | 2004-06-22 | Complaint Inspection | No Violations Noted | Checked liner as someone saw a lot of suds during drilling on or about the bench. Muddy bench though it was, saw no remaining residue on bench. Extra liner appeared to be in sump. Cuttings were within containment. |
For data sources see[8]