If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-25412 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.843806,"lon":-80.275749,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Center Township | |
Operator Name: CONTURA PENNSYLVANIA LAND LLC | |
Well Pad ID: | |
Farm/Lease Name: PA LAND HOLDINGS CORP DFM-9 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-01-26 | |
Well Type: COALBED METHANE | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 39.843806 | |
Longitude: -80.275749 |
Date | Event |
---|---|
2010-01-26 | New Permit Application |
2010-04-28 | Performed Spud Operation |
2010-07-19 | Drilling Completion |
2010-11-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | COAL GAS RECOVERY LP | 40,930.00 | 51 | 0.00 | 0 | 0.00 | 0 |
2011 | COAL GAS RECOVERY LLC | 257,762.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2012 | COAL GAS RECOVERY LLC | 202,100.00 | 365 | 0.00 | 0 | 306.79 | 365 |
2013 | COAL GAS RECOVERY II LLC | 178,135.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | COAL GAS RECOVERY II LLC | 132,255.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | COAL GAS RECOVERY II LLC | 116,215.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | COAL GAS RECOVERY II LLC | 85,730.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2017 | COAL GAS RECOVERY II LLC | 69,735.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CONTURA PENNSYLVANIA LAND LLC | 49,175.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CONTURA PENNSYLVANIA LAND LLC | 53,800.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | COAL GAS RECOVERY LP | Produced Fluid | 36,398.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA-2392008 |
2011 | COAL GAS RECOVERY LLC | Produced Fluid | 3,368.00 Bbl | INJECTION DISPOSAL WELL | 34-127-26595 |
2011 | COAL GAS RECOVERY LLC | Produced Fluid | 1,197.00 Bbl | INJECTION DISPOSAL WELL | 4355 |
2011 | COAL GAS RECOVERY LLC | Produced Fluid | 11,070.00 Bbl | INJECTION DISPOSAL WELL | 2D0550319 |
2011 | COAL GAS RECOVERY LLC | Produced Fluid | 488.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | COAL GAS RECOVERY LLC | Produced Fluid | 8,715.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026913 |
2011 | COAL GAS RECOVERY LLC | Produced Fluid | 3,306.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA-2392008 |
2012 | COAL GAS RECOVERY LLC | Produced Fluid | 3,095.83 Bbl | INJECTION DISPOSAL WELL | 2D0550319 |
2013 | COAL GAS RECOVERY II LLC | Produced Fluid | 6,903.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR132 |
2014 | COAL GAS RECOVERY II LLC | Produced Fluid | 32.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | COAL GAS RECOVERY II LLC | Produced Fluid | 2,569.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR132 |
2015 | COAL GAS RECOVERY II LLC | Produced Fluid | 2,252.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR132 |
2016 | COAL GAS RECOVERY II LLC | Produced Fluid | 95.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2016 | COAL GAS RECOVERY II LLC | Produced Fluid | 2,720.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | COAL GAS RECOVERY II LLC | Produced Fluid | 1,869.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR132 |
2017 | COAL GAS RECOVERY II LLC | Produced Fluid | 28,740.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | CONTURA PENNSYLVANIA LAND LLC | Produced Fluid | 660.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | CONTURA PENNSYLVANIA LAND LLC | Produced Fluid | 39,785.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | CONTURA PENNSYLVANIA LAND LLC | Produced Fluid | 1,320.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019 | CONTURA PENNSYLVANIA LAND LLC | Produced Fluid | 59,965.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1913424 | Primary Facility | 2010-09-15 | Routine/Complete Inspection | No Violations Noted | |
2449657 | Primary Facility | 2016-02-10 | Routine/Complete Inspection | No Violations Noted | Well is properly identified and is equipped for production. Production equipment and piping appears to be in good condition. Well is operating |
2822912 | Primary Facility | 2019-01-02 | Site Restoration | No Violations Noted | On Wednesday January 2, 2019 I conducted a routine-complete inspection at the DFM-9 CBM well site located in Center Township, Greene County.
The access road and the well pad which is also the location of the DFM-9S CBM well were observed to be in good condition. The site has been stabilized with vegetation. There is no on-site production fluid storage. The production tanks are located across the street along the access road to the DFM-8 CBM well. The earthen berm secondary containment structure was observed to be vegetated and in good condition. One are of the berm, where trucks park to off-load fluid from the tanks was observed have less vegetation. The operator should consider reseeding the off-load area to improve vegetative cover. Although the operator is in compliance with current regulations, they should consider using secondary containment constructed of impermeable materials. A release of fluid inside the earthen berm can result in a violation being issued to the operator. The gas well and |
For data sources see[7]