If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-25771 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.896278,"lon":-80.124864,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Franklin Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 149213 | |
Farm/Lease Name: ROHANNA | |
License Status: Active | |
Spud Date: 2011-07-21 | |
Permit Date: 2011-07-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.896278 | |
Longitude: -80.124864 |
Date | Event |
---|---|
2011-07-08 | New Permit Application |
2011-07-27 | Performed Spud Operation |
2011-08-21 | Drilling Completion |
2011-10-04 | Perforation |
2011-10-04 | Performed Stage 1 of Stimulation |
2011-10-04 | Performed Stage 10 of Stimulation |
2011-10-04 | Performed Stage 2 of Stimulation |
2011-10-04 | Performed Stage 3 of Stimulation |
2011-10-05 | Perforation |
2011-10-05 | Performed Stage 4 of Stimulation |
2011-10-05 | Performed Stage 5 of Stimulation |
2011-10-06 | Perforation |
2011-10-06 | Performed Stage 6 of Stimulation |
2011-10-06 | Performed Stage 7 of Stimulation |
2011-10-06 | Performed Stage 8 of Stimulation |
2011-10-07 | Perforation |
2011-10-07 | Performed Stage 11 of Stimulation |
2011-10-07 | Performed Stage 9 of Stimulation |
2011-10-08 | Perforation |
2011-10-08 | Performed Stage 12 of Stimulation |
2019-04-08 | Deviated |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-10-04 | 1 | 106210; 121520; 75740 | 4,701,186 | 7,823 | 0 |
2011-10-04 | 2 | 106210; 121520; 75740 | 4,701,186 | 8,035 | 0 |
2011-10-04 | 3 | 106210; 121520; 75740 | 4,701,186 | 7,308 | 0 |
2011-10-05 | 4 | 106210; 121520; 75740 | 4,701,186 | 7,429 | 0 |
2011-10-05 | 5 | 106210; 121520; 75740 | 4,701,186 | 7,519 | 0 |
2011-10-06 | 6 | 106210; 121520; 75740 | 4,701,186 | 7,849 | 0 |
2011-10-06 | 7 | 106210; 121520; 75740 | 4,701,186 | 7,712 | 0 |
2011-10-06 | 8 | 106210; 121520; 75740 | 4,701,186 | 7,499 | 0 |
2011-10-07 | 9 | 106210; 121520; 75740 | 4,701,186 | 7,424 | 0 |
2011-10-04 | 10 | 106210; 121520; 75740 | 4,701,186 | 7,483 | 0 |
2011-10-07 | 11 | 106210; 121520; 75740 | 4,701,186 | 7,149 | 0 |
2011-10-08 | 12 | 106210; 121520; 75740 | 4,701,186 | 6,899 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | VANTAGE ENERGY APPALACHIA LLC | 156,106.49 | 50 | 0.00 | 0 | 0.00 | 0 |
2012 | VANTAGE ENERGY APPALACHIA LLC | 962,739.96 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | VANTAGE ENERGY APPALACHIA LLC | 609,508.60 | 351 | 0.00 | 0 | 0.00 | 0 |
2014 | VANTAGE ENERGY APPALACHIA LLC | 489,923.30 | 351 | 0.00 | 0 | 0.00 | 0 |
2015 | VANTAGE ENERGY APPALACHIA LLC | 413,934.83 | 361 | 0.00 | 0 | 0.00 | 0 |
2016 | VANTAGE ENERGY APPALACHIA LLC | 335,078.33 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 276,528.69 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 195,657.00 | 253 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 260,231.00 | 327 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 795.00 Bbl | INJECTION DISPOSAL WELL | 4355 |
2011 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 550.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 2,158.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | VANTAGE ENERGY APPALACHIA LLC | Fracing Fluid Waste | 7,611.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 9,759.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 1,230.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 1,894.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2014 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 187.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24078 |
2014 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 81.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 36.67 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2014 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 1,010.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2014 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 421.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 130.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 382.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2015 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 111.89 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2015 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 96.86 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2015 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 160.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 70.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24078 |
2015 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 594.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 81.96 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2015 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 112.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2016 | VANTAGE ENERGY APPALACHIA LLC | Other Oil & Gas Wastes | 23.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 870.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 103.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.19 Tons | LANDFILL | CID # 28726 |
2017 | VANTAGE ENERGY APPALACHIA LLC | Other Oil & Gas Wastes | 42.00 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 184.25 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA LLC | Other Oil & Gas Wastes | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA LLC | Servicing Fluid | 2.98 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 28.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 41.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | VANTAGE ENERGY APPALACHIA LLC | Soil Contaminated by Oil | 0.19 Tons | LANDFILL | CID # 28726 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 131.67 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 223.53 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 76.67 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 107.70 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2008026 | Primary Facility | 2011-10-04 | Drilling/Alteration | No Violations Noted | Rig up to frac well; fracing stage 1&2 of 14 stages; Pumpco on site; Location E&S good; |
2083760 | Primary Facility | 2012-06-19 | Routine/Complete Inspection | No Violations Noted | |
2126694 | Primary Facility | 2012-12-20 | Routine/Complete Inspection | No Violations Noted | ROUTINE INSPECTION. SITE COMPLIANT AT TIME OF INSPECTION. |
2128376 | Primary Facility | 2013-01-03 | Routine/Complete Inspection | No Violations Noted | |
2195680 | Primary Facility | 2013-08-13 | Routine/Complete Inspection | No Violations Noted | ROUTINE INSPECTION. INSPECTED WELL SITE AS PER A COMPLAINT OF FUMES / ODOR FROM FRACING FROM A LOCAL RESIDENT. NO SMELLS OR MONITOR READINGS AT TIME OF INSPECTION. |
2410877 | Primary Facility | 2015-08-05 | Routine/Complete Inspection | No Violations Noted | Well in production. Well in compliance. |
For data sources see[8]