Well ID: 37-059-25869
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Franklin Township
Operator Name: VANTAGE ENERGY APPALACHIA LLC
Well Pad ID:
Farm/Lease Name: PORTER STREET 3H
License Status:
Spud Date:
Permit Date: 2011-10-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.923006
Longitude: -80.159047

For data sources see[1][2][3]

Well History

Date Event
2011-10-12 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 TANGLEWOOD EXPL LLC 0.00 0 0.00 0 0.00 0
2012 VANTAGE ENERGY APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2074666 Primary Facility 2012-06-07 Routine/Complete Inspection No Violations Noted The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. The site is currently dormant. The Wells appear to be drilled but not in production. The site is in over-all good condition. A few areas need to be seeded and mulched because the grass did not grow. The drill pits on site still contain water and the site will need to be restored within 9 months of TD. The ESCGP-1 is good for 5 years. The Operator can apply for an extension if that 9 month mark cannot be reached.
2132195 Primary Facility 2013-01-16 Drilling/Alteration No Violations Noted WELL DRILLED TO COMPLETION.SITE COMPLIANT AT TIME OF INSPECTION.
2160960 Primary Facility 2013-03-29 Routine/Complete Inspection No Violations Noted The Department was at the above referenced Marcellus Well to Conduct a Routine Inspection. The Marcellus Wells have been drilled but not yet in production. The Department had some concerns about the E/S Controls at the bottom of the fill slope. The BMP's/E/S Controls need to be fixed and put back in good working condition. The collection channel leading to the sediment trap has been compromised by a slide and needs to be re-graded. The Department spoke with the Operator in regards to the site conditions and the E/S Controls.