X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26296

Well Details

Well ID: 37-059-26296
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Franklin Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 150450
Farm/Lease Name: PATTON
License Status: Active
Spud Date: 2014-10-14
Permit Date: 2013-11-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.913206
Longitude: -80.244403

For data sources see[1][2][3]

Well History

Date Event
2013-11-21 New Permit Application
2014-10-14 Performed Spud Operation
2015-06-05 Drilling Completion
2015-08-02 Perforation
2015-08-10 Perforation
2015-08-10 Performed Stage 1 of Stimulation
2015-08-10 Performed Stage 2 of Stimulation
2015-08-11 Perforation
2015-08-11 Performed Stage 3 of Stimulation
2015-08-12 Perforation
2015-08-12 Performed Stage 4 of Stimulation
2015-08-12 Performed Stage 5 of Stimulation
2015-08-13 Perforation
2015-08-13 Performed Stage 6 of Stimulation
2015-08-13 Performed Stage 7 of Stimulation
2015-08-13 Performed Stage 8 of Stimulation
2015-08-14 Perforation
2015-08-14 Performed Stage 9 of Stimulation
2015-08-15 Perforation
2015-08-15 Performed Stage 10 of Stimulation
2015-08-16 Perforation
2015-08-16 Performed Stage 11 of Stimulation
2015-08-16 Performed Stage 12 of Stimulation
2015-08-16 Performed Stage 13 of Stimulation
2015-08-17 Perforation
2015-08-17 Performed Stage 14 of Stimulation
2015-08-17 Performed Stage 15 of Stimulation
2015-08-18 Perforation
2015-08-18 Performed Stage 16 of Stimulation
2015-08-19 Perforation
2015-08-19 Performed Stage 17 of Stimulation
2015-08-20 Perforation
2015-08-20 Performed Stage 18 of Stimulation
2015-08-20 Performed Stage 19 of Stimulation
2015-08-21 Perforation
2015-08-21 Performed Stage 20 of Stimulation
2015-08-21 Performed Stage 21 of Stimulation
2015-08-22 Perforation
2015-08-22 Performed Stage 22 of Stimulation
2019-01-07 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-10 2015-08-22 7,780 6,680,730 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SC-30 X-Chem Scale Inhibitor Sodium Hydroxide 1310-73-2 1.5 0.000153723 95.645
WATER VANTAGE WATER WATER NA 100 89.6036 55,750,700.0
40/70 Mesha Sand Trican Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 4.80739 2,991,120.0
Al-11 Trican Corrosion Inhibitor Propargyl Alcohol Deritative NA 45 0.000796688 495.693
Propargly Alcohol 107-19-7 0.9 0.00001593 9.914
Potassium Iodide 7681-11-0 3.5 0.00006196 38.554
FEAC-20 Trican Iron Control Cirtic Acid 77-92-9 27 0.000940091 584.918
Acetic Acid 64-19-7 45 0.00156682 974.863
Biocide X-Chem Biocide Chlorine Dioxide 10049-04-4 0.4 0.00008134 50.608
100 Mesh Trican Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 4.88183 3,037,440.0
7.5% HCL Trican ACID HYDROCLORIC ACID 7647-01-0 7.5 0.0460308 28640
FR-20 Trican Friction Reducer Ammonium Chloride 12125-02-9 0.9 0.000518137 322.381
Oleic Acid Diethanolamide 93-83-4 1 0.000575708 358.201
Polyacrylamide 69418-26-4 25 0.0143927 8955.02
Distillates (Petroleum), Hydrotreated Light 64742-47-8 17 0.00978703 6089.41
Water 7732-18-5 43 0.0247554 15402.6
Alcohols, C12-16, Ethoxylated 68551-12-2 1 0.000575708 358.201

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-08-10 1 Mesh Sand 1,078,011 8,582 9,017
2015-08-10 2 Mesh Sand 1,078,011 8,693 9,358
2015-08-11 3 Mesh Sand 1,078,011 8,566 8,884
2015-08-12 4 Mesh Sand 1,078,011 8,823 9,092
2015-08-12 5 Mesh Sand 1,078,011 8,664 9,092
2015-08-13 6 Mesh Sand 1,078,011 8,692 9,015
2015-08-13 7 Mesh Sand 1,078,011 8,541 9,155
2015-08-13 8 Mesh Sand 1,078,011 8,513 8,948
2015-08-14 9 Mesh Sand 1,078,011 8,455 9,351
2015-08-15 10 Mesh Sand 1,078,011 8,830 8,294
2015-08-16 11 Mesh Sand 1,078,011 8,321 9,431
2015-08-16 12 Mesh Sand 1,078,011 8,443 9,223
2015-08-16 13 Mesh Sand 1,078,011 8,489 9,161
2015-08-17 14 Mesh Sand 1,078,011 8,479 8,942
2015-08-17 15 Mesh Sand 1,078,011 8,753 9,184
2015-08-18 16 Mesh Sand 1,078,011 8,312 8,824
2015-08-19 17 Mesh Sand 1,078,011 8,208 9,154
2015-08-20 18 Mesh Sand 1,078,011 8,161 8,980
2015-08-20 19 Mesh Sand 1,078,011 7,933 8,897
2015-08-21 20 Mesh Sand 1,078,011 7,886 8,345
2015-08-21 21 Mesh Sand 1,078,011 8,100 9,286
2015-08-22 22 Mesh Sand 1,078,011 7,967 8,785

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 VANTAGE ENERGY APPALACHIA II LLC 0.00 0 0.00 0 0.00 0
2015 VANTAGE ENERGY APPALACHIA II LLC 438,569.10 56 0.00 0 0.00 0
2016 VANTAGE ENERGY APPALACHIA II LLC 1,642,302.92 310 0.00 0 0.00 0
2017 RICE DRILLING B LLC 814,448.41 305 0.00 0 0.00 0
2018 RICE DRILLING B LLC 422,865.00 323 0.00 0 0.00 0
2019 RICE DRILLING B LLC 238,134.00 214 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 VANTAGE ENERGY APPALACHIA II LLC Drill Cuttings 659.84 Tons LANDFILL 100419
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 226.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 1,048.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 30.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2015 VANTAGE ENERGY APPALACHIA II LLC Fracturing Fluid Waste 10.00 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 10,825.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 VANTAGE ENERGY APPALACHIA II LLC Drill Cuttings 44.97 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 1,714.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 VANTAGE ENERGY APPALACHIA II LLC Drill Cuttings 488.13 Tons LANDFILL PAD059087072
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 73.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 27.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1,125.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Fracturing Fluid Waste 32.36 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2016 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 1,987.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 409.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 116.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 16,927.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1,270.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA II LLC Fracturing Fluid Waste 2.68 Tons LANDFILL 100620
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 68.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 VANTAGE ENERGY APPALACHIA II LLC Servicing Fluid 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA II LLC Synthetic Liner Materials 1.80 Tons LANDFILL 100620
2016 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil & Gas Related Spills 5.07 Tons LANDFILL 100172
2016 VANTAGE ENERGY APPALACHIA II LLC Servicing Fluid 19.00 Tons REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 150.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 122.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil & Gas Related Spills 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Produced Fluid 9.09 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.54 Tons LANDFILL CID # 28726
2017 VANTAGE ENERGY APPALACHIA II LLC Synthetic Liner Materials 7.93 Tons LANDFILL 100663
2017 VANTAGE ENERGY APPALACHIA II LLC Filter Socks 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil 2.66 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 259.10 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1,500.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 25.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 VANTAGE ENERGY APPALACHIA II LLC Filter Socks 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 3,621.36 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Waste Water Treatment Sludge 2.50 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 12.75 Tons LANDFILL 100172
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 123.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 VANTAGE ENERGY APPALACHIA II LLC Waste Water Treatment Sludge 3.85 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1.27 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil & Gas Related Spills 2.66 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 7.27 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 870.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Produced Fluid 9.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 RICE DRILLING B LLC Soil Contaminated by Oil 0.54 Tons LANDFILL CID # 28726
2018 RICE DRILLING B LLC Produced Fluid 90.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 7.52 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 137.45 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 146.31 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 20.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 104.11 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 422.34 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 18.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Produced Fluid 4.47 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 16.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 18.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2317557 Primary Facility 2014-08-07 Routine/Complete Inspection No Violations Noted Well not drilled. Pre-spud inspection.
2320290 Primary Facility 2014-10-28 Drilling/Alteration No Violations Noted YOST RIG 10 DRILLING TOP HOLE SETS FOR VANTAGE ENERGY. WERE RUNNING 20" CASING TO 415' AT TIME OF INSPECTION.
2334467 Primary Facility 2014-10-14 Routine/Complete Inspection No Violations Noted Well not drilled, pre-spud inspection.
2338520 Primary Facility 2014-10-29 Routine/Complete Inspection No Violations Noted Well conductor set. Well being drilled.
2465812 Primary Facility 2016-03-18 Administrative/File Review In Compliance with Policy An estimated 5 to 10 gallons of brine was released from a breeched T connection within a GPU at the Patton Well Site. The release occurred entirely within containment, therefore no soil or water impacts resulted. The material was removed from containment via a vacuum and in situ testing was conducted to confirm remediation. All associated equipment was replaced and/or repaired. The matter has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time.
2479190 Primary Facility 2016-04-21 Incident- Response to Accident or Event No Violations Noted An estimated 200 gallons of brine was released from a broken site tube on a water truck leaving the Patton Well Site in Franklin Township, Greene County. The release impacted part of the access road between Throckmorton Run and the gate, as well as a few hundred feet of asphalt pavement on Hill School House Road and several areas of compacted gravel berm along the road. Notifications were made, personnel mobilized and the impacted areas remediated.

The failure to contain the brine release is a violation of Title 25 Pa. Code § 91.34(a). The impact to soils resulting from the release of brine is a violation of the Clean Streams Law 35 P.S. § 691.401.

2498645 Primary Facility 2016-06-08 Compliance Evaluation No Violations Noted On Wednesday June 8, 2016, I conducted a compliance evaluation inspection at the Patton Well Site located in Franklin Township, Greene County. The inspection was performed to review remediation work completed in association with an April 21, 2016 brine release in which approximately 200 gallons of brine was released and had impacted the ground surface.
2514683 Primary Facility 2016-08-09 Incident- Response to Accident or Event In Compliance with Policy An incident response conducted as a result of an operator notification.
2514738 Primary Facility 2016-08-09 Incident- Response to Accident or Event In Compliance with Policy An incident response conducted as a result of an operator notification.
2515738 Primary Facility 2016-08-09 Routine/Complete Inspection No Violations Noted Well properly identified and equipped for production. Operator currently drilling Patton 15H well. (059-27057).
2515877 Primary Facility 2016-08-12 Incident- Response to Accident or Event In Compliance with Policy An incident response conducted as a result of an operator notification.
2516575 Primary Facility 2016-08-30 Incident- Response to Accident or Event In Compliance with Policy An incident response conducted as a result of an operator notification.
2549016 Primary Facility 2016-10-15 Administrative/File Review In Compliance with Policy

On 10/15/16 at approximately 1200 hours I completed an administrative inspection in response to a release at the Patton pad. A spill out of containment of approximately 1 barrel of water and drilling cuttings was reported, but an accurate volume could not be determined due to rain water being present on the containment. Weavertown Environmental performed the cleanup of the site. SE Technologies LLC submitted a letter on Vantage’s behalf requesting that the Act 2 process be waived, due to the inconclusive volume released and low conductivity levels. The Department determined that the evidence provided was reasonable and has permitted Vantage to continue without the Act 2 process. The spill was handled in compliance with DEP policy.

2550431 Primary Facility 2016-12-27 Routine/Complete Inspection No Violations Noted

On 12/27/16 at approximately 1030 hours I conducted a routine complete inspection of the Patton Unit. The Act 9 sign was in place and all required documents were present at the site.

A U shape of sediment sock had been placed immediately adjacent to the first stream crossing to serve as an infiltration berm for water eroding the road surface. It is highly recommended that the road be repaired and the material stopped by the sock removed to prevent a BMP failure at the stream.

The GPUs were found to be in secondary containment consistent with Chapter 78A.64b which requires equipment containing regulated substances to be placed within secondary containment.

The site overall was well vegetated and no signs of erosion were observed at the time of inspection with the exception of the road surface.

For data sources see[9]

References