If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26572 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.933567,"lon":-80.39435,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Gray Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 150951 | |
Farm/Lease Name: JACOBS | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.933567 | |
Longitude: -80.394350 |
Date | Event |
---|---|
2014-06-20 | New Permit Application |
2014-06-24 | Performed Spud Operation |
2014-09-15 | Drilling Completion |
2014-11-10 | Perforation |
2014-12-03 | Performed Stimulation |
2016-03-03 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-12-03 | 2014-12-23 | 7,226 | 9,206,070 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Customer & CWS | Base Fluid & Mix Water | Water | 7732-18-5 | 100 | 86.6072 | 76,908,200.0 |
Sand (Proppant), DAP-103, DAP-903, DAP-925, BioClear 2000, DeTour 2550, Hydrochloric Acid |
CWS | Propping Agent, Iron Control, Scale Inhibitor, Acid Corrosion Inhibitor, Biocide, Diverting Agent, Clean Perforations | Biotite | 1302-27-8 | 0.1 | 0.01073 | 9528.55 | |
Formaldehyde | 50-00-0 | 0.1 | 0.00000010 | 0.07 | ||||
Calcite | 471-34-1 | 1 | 0.00603 | 5358.07 | ||||
2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.00678 | 6024.89 | ||||
Propargyl Alcohol | 107-19-7 | 10 | 0.00001000 | 7.38 | ||||
Fatty acids | Proprietary | 30 | 0.00002000 | 22.14 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.01044 | 9273.4 | ||||
Hydrochloric acid | 7647-01-0 | 37 | 0.07469 | 66324.3 | ||||
Modified thiourea polymer | 68527-49-1 | 30 | 0.00002000 | 22.14 | ||||
Illite | 12173-60-3 | 1 | 0.0282 | 25038.2 | ||||
Goethite | 1310-14-1 | 0.1 | 0.0113 | 10038.8 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 13.2048 | 11,726,000.0 | ||||
Polyoxyalkylenes | Proprietary | 30 | 0.00002000 | 22.14 | ||||
Citric acid | 77-92-9 | 60 | 0.00063 | 561.8 | ||||
Apatite | 64476-38-6 | 0.1 | 0.01073 | 9528.55 | ||||
Olefin | Proprietary | 5 | 0.00000500 | 3.69 | ||||
Sodium chloride | 7647-14-5 | 1 | 0.00000200 | 0.74 | ||||
Polylactic Acid | 26100-51-6 | 100 | 0.00144 | 1275 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.01344 | 11930.6 | ||||
Methanol | 67-56-1 | 60 | 0.00005000 | 44.29 | ||||
Polyethylene glycol mixture | 25322-68-3 | 70 | 0.01344 | 11930.6 | ||||
ECM FR PRO 50 | ECM | Friction reducer | Hydrotreated Light Distillate | 64742-47-8 | 20 | 0.04531 | 40621.7 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-12-03 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 1,608,856.00 | 301 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 1,034,054.25 | 359 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 743,230.02 | 345 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 576,247.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 559,216.00 | 354 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Drill Cuttings | 457.81 Tons | LANDFILL | PAD059087072 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 635.25 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 253.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | RICE DRILLING B LLC | Produced Fluid | 253.67 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 88.54 Tons | LANDFILL | 301071 |
2015 | RICE DRILLING B LLC | Produced Fluid | 9,150.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3.94 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Produced Fluid | 97.33 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 209.17 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 65.15 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 23,881.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 193.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 191.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Produced Fluid | 8,172.54 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 339.03 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.52 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 240.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 235.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 5.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 6.40 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 61.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 11.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 83.16 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 6.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,331.45 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 36.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Produced Fluid | 289.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 3.58 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2017 | RICE DRILLING B LLC | Produced Fluid | 146.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | RICE DRILLING B LLC | Produced Fluid | 178.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 2.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2018 | RICE DRILLING B LLC | Produced Fluid | 48.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 48.33 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 26.20 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 311.31 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 26.20 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,909.67 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 26.91 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Produced Fluid | 30.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 39.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 58.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2292022 | Primary Facility | 2014-07-17 | Drilling/Alteration | No Violations Noted | TOP HOLE SETS DRILLED TO COMPLETION. TDed 5696' KOP 5550'. |
2304726 | Primary Facility | 2014-07-17 | Routine/Complete Inspection | No Violations Noted | During drilling site inspection. |
2417485 | Primary Facility | 2015-10-14 | Routine/Complete Inspection | No Violations Noted | Well in production. Well in compliance. |
2492546 | Primary Facility | 2016-06-06 | Incident- Response to Accident or Event | Violation(s) Noted | On 6/16/2016, I performed an inspection of Rice Energy's Jacobs well pad site. Present at time of inspection was Jared Holman (Rice Company Man). The site is located in Gray Twp., Greene County. The inspection was performed as a incident inspection related to a reported brine spill by the operator.
The operator reported a spill of approx. 1 barrel of produced water off of containment to the well padon 6/3/16. I met w/ Jared Holman, the Rice Drilling Consultant on site to review the incident. Mr. Holman stated that Rice personnel had removed impacted material from the well pad for disposal. Cudd Energy Services where on site completing coil tubing operations on the Jacobs 11H well, when a produced fluid line had ruptured and discharged produced fluid to the secondary containment on site. Cudd did not report this spill to containment and then parked a truck on the containment berm causing the produced fluid to discharge on the well pad. During the inspection water was observed pooling in the secondary |
2498221 | Primary Facility | 2016-06-14 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On 6/14/2016 I performed an inspection of Rice Energy's Jacobs Unit well site. The site is located in Gray Twp., Greene County. The inspection was performed as a routine inspection because of a requested minor modification to the ESCGP permit to allow for restoration of the site.
The Act 9 Site ID sign was in place and legible. The operator reported a spill of approx. 1 barrel of produced water off of containment to the well pad on 6/3/16. Violations were noted on the 6/6/16 inspection related to the brine release. The operaor has notified the department upon removal of the secondary containment at the location of the first release, stained and impacted soils were noted under the secondary containment. The operator has begun characterizing the soil beneath the containment and has removed visually impacted soils. |
2510477 | Primary Facility | 2016-08-10 | Compliance Evaluation | No Violations Noted | On 8/10/2016 I performed an inspection of Rice Energy's Jacobs Unit well site. The site is located in Gray Twp., Greene County. The inspection was performed as a compliance evaluation inspection related to violations on site on 6/6/2016.
The Act 9 Site ID sign was in place and legible. The operator reported a spill of approx. 1 barrel of produced water off of containment to the well pad on 6/3/16. Violations were noted on the 6/6/16 inspection related to the brine release. The operaor notified the department upon removal of the secondary containment at the location of the first release, stained and impacted soils were noted under the secondary containment. The operator has characterized the soil beneath the containment and has removed impacted soils. The area has been regraded and stabilized with vegetative growth. |
2788847 | Primary Facility | 2018-10-10 | Routine/Complete Inspection | No Violations Noted | On October 10, 2018, the Department performed an inspection of the EQT/Rice Energy Jacobs well site. Present at time of inspection was Carey Bell and Shane Closkey (EQT). The site is located in Gray Twp., Greene Co. The inspection was routine inspection of the site related to a request by the operator to view the site, prior to the submission of a Notice of Termination of the ESCGP2 permit to the Department.
The operator has requested a meeting on site to review the condition of the site prior to submitting a Notice of Termination for the ESCGP2 permit. The well site is stable with greater than 70% uniform perennial vegetative cover. The operator has reclaimed the sediment trap on site and has removed all the E&S BMPs. The operator has reclaimed the well pad to the interim restoration plan. The Department would recommend termination of the ESCGP2 permit given the condition of the site at time of inspection. 6 wells have been drilled to completion on the site and are equipped for production. The GPU |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2492546 | 761363 | 2016-06-06 | 2016-08-15 | 78.54 | Environmental Health & Safety | |
2492546 | 761364 | 2016-06-06 | 2016-08-15 | CSL 401 | Environmental Health & Safety | |
2492546 | 761365 | 2016-06-06 | 2016-08-15 | OGA3218.2(A) | Environmental Health & Safety | |
2492546 | 761366 | 2016-06-06 | 2016-08-15 | SWMA301 | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
761363 | 343798 | NOV - Notice of Violation | 2016-08-22 | ||||
761364 | 343798 | NOV - Notice of Violation | 2016-08-22 | ||||
761365 | 343798 | NOV - Notice of Violation | 2016-08-22 | ||||
761366 | 343798 | NOV - Notice of Violation | 2016-08-22 |
For data sources see[9]