If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26659 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.913078,"lon":-80.244169,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Franklin Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 150450 | |
Farm/Lease Name: PATTON | |
License Status: Active | |
Spud Date: 2014-10-17 | |
Permit Date: 2014-09-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.913078 | |
Longitude: -80.244169 |
Date | Event |
---|---|
2014-09-22 | New Permit Application |
2014-10-17 | Performed Spud Operation |
2015-02-27 | New Permit Application |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-25 | 2015-09-10 | 7,818 | 7,381,630 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WBO-2 | Trican | Breaker | Sodium Persulfate | 7775-27-1 | 75 | 0.00003514 | 24 |
40/70 Mesha Sand | Trican | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.459 | 3,045,780.0 | |
FEAC-20 | Trican | Iron Control | Cirtic Acid | 77-92-9 | 27 | 0.000906916 | 619.481 | |
Acetic Acid | 64-19-7 | 45 | 0.00151153 | 1032.47 | ||||
FR-20 | Trican | Friction Reducer | Oleic Acid Diethanolamide | 93-83-4 | 1 | 0.000560065 | 382.56 | |
Water | 7732-18-5 | 43 | 0.0240828 | 16450.1 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 17 | 0.0095211 | 6503.52 | ||||
Ammonium Chloride | 12125-02-9 | 0.9 | 0.000504058 | 344.304 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 1 | 0.000560065 | 382.56 | ||||
Polyacrylamide | 69418-26-4 | 25 | 0.0140016 | 9564 | ||||
7.5% HCL | Trican | ACID | HYDROCLORIC ACID | 7647-01-0 | 7.5 | 0.0443111 | 30267.3 | |
Biocide | X-Chem | Biocide | Chlorine Dioxide | 10049-04-4 | 0.4 | 0.00002426 | 16.573 | |
WG-111L | Trican | Viscosifier, Gel | Light Hydrotreated Petroleum Distillate | 64742-47-8 | 45 | 0.00309985 | 2117.4 | |
Polysaccharide blend | NA | 45 | 0.00309985 | 2117.4 | ||||
SC-30 | X-Chem | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 1.5 | 0.000161596 | 110.381 | |
Al-11 | Trican | Corrosion Inhibitor | Propargly Alcohol | 107-19-7 | 0.9 | 0.00001539 | 10.515 | |
Propargyl Alcohol Deritative | NA | 45 | 0.000769672 | 525.735 | ||||
Potassium Iodide | 7681-11-0 | 3.5 | 0.00005986 | 40.891 | ||||
WATER | VANTAGE | WATER | WATER | NA | 100 | 90.1815 | 61,599,700.0 | |
100 Mesh | Trican | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.68387 | 3,199,380.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | 460,130.99 | 59 | 0.00 | 0 | 0.00 | 0 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | 1,431,665.92 | 274 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 877,129.07 | 354 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 572,663.00 | 311 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 404,041.00 | 297 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 455.94 Tons | LANDFILL | 100419 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 226.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 412.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Fracing Fluid Waste | 30.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 331.11 Tons | LANDFILL | 100419 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 10.00 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Fracing Fluid Waste | 11,115.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 39.97 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Fracing Fluid Waste | 1,714.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 335.38 Tons | LANDFILL | PAD059087072 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 263.87 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 73.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Fracing Fluid Waste | 27.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,422.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 32.36 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 1,765.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 213.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 21,973.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,873.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 2.68 Tons | LANDFILL | 100620 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 68.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 250.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 189.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 1.80 Tons | LANDFILL | 100620 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 5.07 Tons | LANDFILL | 100172 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Servicing Fluid | 19.00 Tons | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 150.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 122.00 Bbl | INJECTION DISPOSAL WELL | 34-167-23862 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 9.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.54 Tons | LANDFILL | CID # 28726 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 7.93 Tons | LANDFILL | 100663 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Filter Socks | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil | 2.66 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 259.10 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 25.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Filter Socks | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 3,611.36 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Waste Water Treatment Sludge | 2.50 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 12.75 Tons | LANDFILL | 100172 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 123.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Waste Water Treatment Sludge | 3.85 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1.27 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 2.66 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 7.27 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 870.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 9.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,500.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.54 Tons | LANDFILL | CID # 28726 |
2018 | RICE DRILLING B LLC | Produced Fluid | 1.00 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | RICE DRILLING B LLC | Produced Fluid | 161.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Synthetic Liner Materials | 2.59 Tons | LANDFILL | 100419 |
2018 | RICE DRILLING B LLC | Produced Fluid | 14.04 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 115.45 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 109.32 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 20.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 116.38 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 255.80 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 42.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 9.92 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Produced Fluid | 4.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2320297 | Primary Facility | 2014-10-28 | Drilling/Alteration | No Violations Noted | CONDUCTOR SET 40' OF 20". YOST RIG 10 ON SITE DRILLING TOP HOLE SETS. |
2334473 | Primary Facility | 2014-10-14 | Routine/Complete Inspection | No Violations Noted | Well not drilled, pre-spud inspection. |
2338524 | Primary Facility | 2014-10-29 | Routine/Complete Inspection | No Violations Noted | Well conductor set, well being drilled. |
2465826 | Primary Facility | 2016-03-18 | Administrative/File Review | In Compliance with Policy | An estimated 5 to 10 gallons of brine was released from a breeched T connection within a GPU at the Patton Well Site. The release occurred entirely within containment, therefore no soil or water impacts resulted. The material was removed from containment via a vacuum and in situ testing was conducted to confirm remediation. All associated equipment was replaced and/or repaired. The matter has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time. |
2479201 | Primary Facility | 2016-04-21 | Incident- Response to Accident or Event | No Violations Noted | An estimated 200 gallons of brine was released from a broken site tube on a water truck leaving the Patton Well Site in Franklin Township, Greene County. The release impacted part of the access road between Throckmorton Run and the gate, as well as a few hundred feet of asphalt pavement on Hill School House Road and several areas of compacted gravel berm along the road. Notifications were made, personnel mobilized and the impacted areas remediated.
The failure to contain the brine release is a violation of Title 25 Pa. Code § 91.34(a). The impact to soils resulting from the release of brine is a violation of the Clean Streams Law 35 P.S. § 691.401. |
2498657 | Primary Facility | 2016-06-08 | Compliance Evaluation | No Violations Noted | On Wednesday June 8, 2016, I conducted a compliance evaluation inspection at the Patton Well Site located in Franklin Township, Greene County. The inspection was performed to review remediation work completed in association with an April 21, 2016 brine release in which approximately 200 gallons of brine was released and had impacted the ground surface. |
2514690 | Primary Facility | 2016-08-09 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2514752 | Primary Facility | 2016-08-09 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2515741 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | Well properly identified and equipped for production. Operator currently drilling Patton 15H well. (059-27057). |
2515885 | Primary Facility | 2016-08-12 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2516587 | Primary Facility | 2016-08-30 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2549020 | Primary Facility | 2016-10-15 | Administrative/File Review | In Compliance with Policy |
On 10/15/16 at approximately 1200 hours I completed an administrative inspection in response to a release at the Patton pad. A spill out of containment of approximately 1 barrel of water and drilling cuttings was reported, but an accurate volume could not be determined due to rain water being present on the containment. Weavertown Environmental performed the cleanup of the site. SE Technologies LLC submitted a letter on Vantage’s behalf requesting that the Act 2 process be waived, due to the inconclusive volume released and low conductivity levels. The Department determined that the evidence provided was reasonable and has permitted Vantage to continue without the Act 2 process. The spill was handled in compliance with DEP policy. |
2550435 | Primary Facility | 2016-12-27 | Routine/Complete Inspection | No Violations Noted |
On 12/27/16 at approximately 1030 hours I conducted a routine complete inspection of the Patton Unit. The Act 9 sign was in place and all required documents were present at the site. A U shape of sediment sock had been placed immediately adjacent to the first stream crossing to serve as an infiltration berm for water eroding the road surface. It is highly recommended that the road be repaired and the material stopped by the sock removed to prevent a BMP failure at the stream. The GPUs were found to be in secondary containment consistent with Chapter 78A.64b which requires equipment containing regulated substances to be placed within secondary containment. The site overall was well vegetated and no signs of erosion were observed at the time of inspection with the exception of the road surface. |
For data sources see[8]