If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26662 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.852353,"lon":-80.425008,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Aleppo Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 151819 | |
Farm/Lease Name: CHARLES BEHM 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-10-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.852353 | |
Longitude: -80.425008 |
Date | Event |
---|---|
2014-10-09 | New Permit Application |
2014-10-13 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,541,996.29 | 179 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,776,262.00 | 282 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,081,958.00 | 266 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Drill Cuttings | 112.86 Tons | LANDFILL | PAD059087072 |
2014 | RICE DRILLING B LLC | Produced Fluid | 583.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Produced Fluid | 743.75 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 850.80 Tons | LANDFILL | 06-08438 |
2014 | RICE DRILLING B LLC | Produced Fluid | 743.75 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 124.53 Tons | LANDFILL | 301071 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 1.26 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 246.47 Tons | LANDFILL | PAD059087072 |
2015 | RICE DRILLING B LLC | Produced Fluid | 57.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 369.42 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | RICE DRILLING B LLC | Produced Fluid | 204.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 716.97 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 114.92 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 54.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 13.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 13.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 4.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Produced Fluid | 26.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 1,078.31 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 31.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 8.54 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 94.92 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 183.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 38.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | RICE DRILLING B LLC | Produced Fluid | 3,721.38 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 7.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 57.99 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,651.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 332.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | RICE DRILLING B LLC | Produced Fluid | 414.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 73.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 204.23 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 80.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 62.92 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2018 | RICE DRILLING B LLC | Produced Fluid | 603.03 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 33.82 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 522.43 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 35.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Servicing Fluid | 17.36 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,509.83 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 27.50 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2320214 | Primary Facility | 2014-10-21 | Drilling/Alteration | No Violations Noted | WSG RIG 2 DRILLING TOP HOLE SETS FOR RICE DRILLING. WERE RUNNING 13-3/8 CASING TO 1381' AT TIME OF INSPECTION. |
2337548 | Primary Facility | 2014-10-21 | Routine/Complete Inspection | No Violations Noted | Well being drilled. |
2339657 | Primary Facility | 2014-01-09 | Drilling/Alteration | No Violations Noted | First visit to site today . Move on date is (12/13/2014) Water Casing set @ 505' (12/19/2015). Coal Protection @ 1889' ( 12/21/2014) .Intermediate Casing set @ 2927' ( 12/29/2014 ). KOP @ 6514' and Landing Point @ 8642 ' . Today drilling @ 8917. |
2340570 | Primary Facility | 2015-02-02 | Drilling/Alteration | No Violations Noted | Patterson Rig 312 drilling lateral; spud on 1/29/15; Drilling in the curve @ 7548'; location icy due to cold weather; no containment issues; |
2588905 | Primary Facility | 2017-04-18 | Routine/Complete Inspection | No Violations Noted | On 4/18/2017, the Department performed an inspection of the Rice Energy Charles Behm well pad. The site is located in Aleppo Twp., Greene Co. The inspection was a routine inspection during setup for hydraulic fracturing activity to begin on site.
The operator has setup a Frac tank manifold system, in secondary containment, for storage of Frac fluid on site. The well pad secondary containment has been installed and the Frac spread was being setup at time of inspection. An above ground TWL has been installed to an AST on the Parry well pad and a water withdrawal from North Fork of Dunkard Fork will support the hydraulic fracturing operations at the Behm site. Four wells have been drilled to total depth on site. The 8H well was in production, but has been temporarily shut-in for hydraulic fracturing operations on the 2H, 4H, and 6H wells. |
2706090 | Primary Facility | 2018-03-01 | Routine/Complete Inspection | No Violations Noted | On March 1, 2018, the Department performed an inspection of the EQT Charles Behm well pad. The site is located in Aleppo Twp., Greene Co. The inspection is CEI associated with violations against the operator for failing to terminate the ESCGP1 permit prior to the expiration of the ESCGP1 permit.
The operator has requested an inspection of the site prior to submitting a Notice of Termination to the Department for the expired ESCGP1 permit. The site has been restored to the interim restoration plan. The site is stable and vegetated with greater than 70% perennial vegetative cover. The access road and well pad are in good condition. 4 wells have been drilled to completion and are equipped for production. The 10H well on site has been plugged and the well cellar is covered with a steel plate. The 8H well is listed as regulatory inactive status in the Departments records, but appears to have been placed back into production. The operator will need to send notification to the Department if the status on th |
2766192 | Primary Facility | 2018-08-02 | Routine/Complete Inspection | No Violations Noted | On August 2, 2018, the Department performed an inspection of the EQT Charles Behm well pad. The site is located in Aleppo Twp., Greene Co. The inspection is routine inspection related to a well site restoration report sent by the operator.
The site has been restored to the interim restoration plan. The site is stable and vegetated with greater than 70% perennial vegetative cover. The access road and well pad are in good condition. 4 wells have been drilled to completion and are equipped for production. The 10H well on site has been plugged and the well cellar is covered with a steel plate. |
For data sources see[7]