X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26705

Well Details

Well ID: 37-059-26705
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Aleppo Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 144663
Farm/Lease Name: JOHN BRIGGS
License Status: Active
Spud Date: 2014-12-15
Permit Date: 2014-11-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.825372
Longitude: -80.496647

For data sources see[1][2][3]

Well History

Date Event
2014-11-07 New Permit Application
2014-12-15 Performed Spud Operation
2015-04-25 Drilling Completion
2015-05-28 Drilling Completion
2015-06-17 Perforation
2015-06-21 Performed Stage 1 of Stimulation
2015-06-29 Perforation
2015-06-30 Performed Stage 2 of Stimulation
2015-07-02 Perforation
2015-07-02 Performed Stage 3 of Stimulation
2015-07-02 Performed Stage 4 of Stimulation
2015-07-03 Perforation
2015-07-03 Performed Stage 5 of Stimulation
2015-07-03 Performed Stage 6 of Stimulation
2015-07-03 Performed Stage 7 of Stimulation
2015-07-04 Perforation
2015-07-04 Performed Stage 10 of Stimulation
2015-07-04 Performed Stage 8 of Stimulation
2015-07-04 Performed Stage 9 of Stimulation
2015-07-05 Perforation
2015-07-05 Performed Stage 11 of Stimulation
2015-07-05 Performed Stage 12 of Stimulation
2015-07-06 Perforation
2015-07-06 Performed Stage 13 of Stimulation
2015-07-06 Performed Stage 14 of Stimulation
2015-07-06 Performed Stage 15 of Stimulation
2015-07-07 Perforation
2015-07-07 Performed Stage 16 of Stimulation
2015-07-07 Performed Stage 17 of Stimulation
2015-07-07 Performed Stage 18 of Stimulation
2015-07-08 Perforation
2015-07-08 Performed Stage 19 of Stimulation
2015-07-08 Performed Stage 20 of Stimulation
2015-07-09 Perforation
2015-07-09 Performed Stage 21 of Stimulation
2015-07-09 Performed Stage 22 of Stimulation
2015-07-09 Performed Stage 23 of Stimulation
2015-07-10 Perforation
2015-07-10 Performed Stage 24 of Stimulation
2015-07-10 Performed Stage 25 of Stimulation
2015-07-10 Performed Stage 26 of Stimulation
2015-07-11 Perforation
2015-07-11 Performed Stage 27 of Stimulation
2015-07-11 Performed Stage 28 of Stimulation
2015-07-11 Performed Stage 29 of Stimulation
2015-07-11 Performed Stage 30 of Stimulation
2015-07-11 Performed Stage 31 of Stimulation
2015-07-12 Perforation
2015-07-12 Performed Stage 32 of Stimulation
2015-07-12 Performed Stage 33 of Stimulation
2015-07-12 Performed Stage 34 of Stimulation
2015-07-12 Performed Stage 35 of Stimulation
2015-07-13 Perforation
2015-07-13 Performed Stage 36 of Stimulation
2015-07-13 Performed Stage 37 of Stimulation
2015-07-13 Performed Stage 38 of Stimulation
2015-07-13 Performed Stage 39 of Stimulation
2015-07-14 Perforation
2015-07-14 Performed Stage 40 of Stimulation
2015-07-14 Performed Stage 41 of Stimulation
2018-09-20 Deviated
2018-09-20 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-20 2015-07-14 12,910 17,802,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Optikleen WF Halliburton Breaker Sodium perborate tetrahydrate 10486-00-7 100 0.0659673 109835
100 Mesh Sand Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 8.22955 13,702,200.0
Cla-Web Halliburton Clay Stabilizer No Hazardous Ingredients Proprietary 100 0.00054955 915
FE-1A Halliburton Acid Additive-Acetic Acetic anhydride 108-24-7 100 0.000296418 493.536
Acetic acid 64-19-7 60 0.000177851 296.121
Sand, Ceramic, 30/50 Mesh Halliburton Proppant Ceramic materials and wares, chemicals 66402-68-4 100 0.616131 1,025,860.0
LP-65 MC Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10 0.00218241 3633.7
PermVis VFR-10 Halliburton Friction Reducer Alcohols, C12-16, ethoxylated 68551-12-2 10 0.000865275 1440.68
Ammonium chloride 12125-02-9 10 0.000865275 1440.68
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) 93-83-4 5 0.000432637 720.34
Hydrotreated light petroleum distillate 64742-47-8 30 0.00259582 4322.04
Sand, Ceramic, 40/70 Mesh Halliburton Proppant Ceramic materials and wares, chemicals 66402-68-4 100 1.41357 2,353,590.0
Hydrochloric Acid (15%) Halliburton Clean Cement at Perforations Hydrochloric Acid 7647-01-0 30 0.0856679 142637
FR-76 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.0245688 40906.9
Water RDB/RMP Carrier/Base Fluid Water 7732-18-5 100 89.2265 148,562,000.0
HAI-OS Halliburton Corrosion Inhibitor Methanol 67-56-1 60 0.000294406 490.185
Propargyl alcohol 107-19-7 10 0.00004907 81.698
BE-9W Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00218089 3631.18
Cla-Web II Halliburton Clay Stabilizer No Hazardous Ingredients Proprietary 100 0.0272219 45324.4

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-06-21 1 Silica Sand/Ceramic 17,802,503 12,516 13,501
2015-06-30 2 Silica Sand/Ceramic 17,802,503 12,550 13,513
2015-07-02 3 Silica Sand/Ceramic 17,802,503 12,119 13,229
2015-07-02 4 Silica Sand/Ceramic 17,802,503 12,269 12,966
2015-07-03 5 Silica Sand/Ceramic 17,802,503 12,103 13,141
2015-07-03 6 Silica Sand/Ceramic 17,802,503 12,085 13,366
2015-07-03 7 Silica Sand/Ceramic 17,802,503 12,181 13,148
2015-07-04 8 Silica Sand/Ceramic 17,802,503 12,053 13,062
2015-07-04 9 Silica Sand/Ceramic 17,802,503 11,786 12,818
2015-07-04 10 Silica Sand/Ceramic 17,802,503 12,167 13,160
2015-07-05 11 Silica Sand/Ceramic 17,802,503 11,670 13,198
2015-07-05 12 Silica Sand/Ceramic 17,802,503 11,688 13,070
2015-07-06 13 Silica Sand/Ceramic 17,802,503 11,694 13,072
2015-07-06 14 Silica Sand/Ceramic 17,802,503 11,246 13,033
2015-07-06 15 Silica Sand/Ceramic 17,802,503 11,255 12,495
2015-07-07 16 Silica Sand/Ceramic 17,802,503 10,425 13,058
2015-07-07 17 Silica Sand/Ceramic 17,802,503 11,094 13,200
2015-07-07 18 Silica Sand/Ceramic 17,802,503 11,083 13,184
2015-07-08 19 Silica Sand/Ceramic 17,802,503 11,223 12,457
2015-07-08 20 Silica Sand/Ceramic 17,802,503 11,537 13,113
2015-07-09 21 Silica Sand/Ceramic 17,802,503 11,249 13,078
2015-07-09 22 Silica Sand/Ceramic 17,802,503 11,761 12,867
2015-07-09 23 Silica Sand/Ceramic 17,802,503 11,432 12,680
2015-07-10 24 Silica Sand/Ceramic 17,802,503 11,408 12,281
2015-07-10 25 Silica Sand/Ceramic 17,802,503 11,616 13,250
2015-07-10 26 Silica Sand/Ceramic 17,802,503 11,702 13,381
2015-07-11 27 Silica Sand/Ceramic 17,802,503 11,290 13,428
2015-07-11 28 Silica Sand/Ceramic 17,802,503 11,307 13,137
2015-07-11 29 Silica Sand/Ceramic 17,802,503 11,413 13,392
2015-07-11 30 Silica Sand/Ceramic 17,802,503 12,106 13,372
2015-07-11 31 Silica Sand/Ceramic 17,802,503 11,005 13,100
2015-07-12 32 Silica Sand/Ceramic 17,802,503 10,948 12,407
2015-07-12 33 Silica Sand/Ceramic 17,802,503 11,251 13,342
2015-07-12 34 Silica Sand/Ceramic 17,802,503 11,202 13,043
2015-07-12 35 Silica Sand/Ceramic 17,802,503 11,110 13,009
2015-07-13 36 Silica Sand/Ceramic 17,802,503 11,091 12,783
2015-07-13 37 Silica Sand/Ceramic 17,802,503 10,905 13,040
2015-07-13 38 Silica Sand/Ceramic 17,802,503 10,955 13,301
2015-07-13 39 Silica Sand/Ceramic 17,802,503 10,850 13,011
2015-07-14 40 Silica Sand/Ceramic 17,802,503 10,486 13,033
2015-07-14 41 Silica Sand/Ceramic 17,802,503 11,072 13,109

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2015 RICE DRILLING B LLC 1,652,411.00 129 0.00 0 0.00 0
2016 RICE DRILLING B LLC 1,633,727.07 180 0.00 0 0.00 0
2017 RICE DRILLING B LLC 2,215,526.63 295 0.00 0 0.00 0
2018 RICE DRILLING B LLC 1,431,298.00 304 0.00 0 0.00 0
2019 RICE DRILLING B LLC 835,126.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 RICE DRILLING B LLC Produced Fluid 206.25 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 RICE DRILLING B LLC Drill Cuttings 231.54 Tons LANDFILL 06-08438
2014 RICE DRILLING B LLC Produced Fluid 206.25 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 RICE DRILLING B LLC Produced Fluid 27.50 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 RICE DRILLING B LLC Fracing Fluid Waste 4,124.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Produced Fluid 16,274.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Fracing Fluid Waste 13,011.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drilling Fluid Waste 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 678.94 Tons LANDFILL 06-08438
2015 RICE DRILLING B LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 RICE DRILLING B LLC Fracturing Fluid Waste 91.85 Tons LANDFILL 100592
2015 RICE DRILLING B LLC Produced Fluid 7,580.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 102.56 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Fracturing Fluid Waste 2.71 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Fracturing Fluid Waste 44.44 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 11.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 14.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 597.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2016 RICE DRILLING B LLC Produced Fluid 4,913.21 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 252.91 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 57.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 1.50 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Produced Fluid 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 202.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 RICE DRILLING B LLC Drilling Fluid Waste 69.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Drill Cuttings 4.69 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Synthetic Liner Materials 3.73 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Synthetic Liner Materials 1.82 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Produced Fluid 114.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 113.55 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.96 Tons LANDFILL 100277
2017 RICE DRILLING B LLC Produced Fluid 0.42 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2017 RICE DRILLING B LLC Drill Cuttings 21.10 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Produced Fluid 0.91 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017 RICE DRILLING B LLC Produced Fluid 975.81 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Drill Cuttings 1.89 Tons LANDFILL 100620
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 190.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 0.97 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 11.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 RICE DRILLING B LLC Soil Contaminated by Oil 0.96 Tons LANDFILL 100277
2018 RICE DRILLING B LLC Servicing Fluid 10.33 Bbl LANDFILL CID # 28726
2018 RICE DRILLING B LLC Produced Fluid 606.76 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 4,116.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 260.69 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 223.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 RICE DRILLING B LLC Produced Fluid 562.61 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Servicing Fluid 14.88 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 6.25 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Produced Fluid 34.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 35.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 132.77 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 32.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 1,522.13 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Synthetic Liner Materials 1.85 Tons LANDFILL 100419

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2338979 Primary Facility 2014-11-14 Routine/Complete Inspection No Violations Noted Well not drilled, pre-spud inspection.
2340559 Primary Facility 2015-02-02 Drilling/Alteration No Violations Noted Falcon 23 on location to set one string of casing in this Utica well; 30'@ 100'; 24"@ 406'; Presently drilling 22' hole to set 18 5/8" casing; TD of well 1472'; Tripping out of hole with drill pipe; location extremely icy due to severe cold weather;
2356374 Primary Facility 2015-03-11 Drilling/Alteration No Violations Noted Horizontal Utica Well, Setting 133/8" 1st Intermediate Casing and cementing tonight.(3/11/2015).
2356381 Primary Facility 2015-03-13 Drilling/Alteration No Violations Noted Horizontal Utica Well, Starting to drill out of 1st Intermediate Casing shoe.
2365770 Primary Facility 2015-04-20 Drilling/Alteration No Violations Noted Utica Shale , Drilling on air @ 11,553 (TD) setting 2ND Intermediate Casing and cementing today (4/19/2015) .
2374125 Primary Facility 2015-05-06 Drilling/Alteration No Violations Noted Utica Shale , After setting a cement plug Patterson failed to Kick Off .The operator decided to set Whipstock. During operation to set Whipstock by Wheaterford the device failed to set (5/3/2015). Trying many efforts to set the device without proper results. On (5/5/2015) the operator decided to set 2nd Whipstock.
2374158 Primary Facility 2015-05-15 Drilling/Alteration No Violations Noted Utica Shale , They are in process of setting 2ND Whipstock (5/6/2015). Whipstock is set @ 12,031' and operation going forward to start drilling.The motor failed tripping out to replace motor.Drilling to depth of 12,044' and becomes stuck in well bore.Tryed to jar free with no success. Planning to leave 225' fish in hole while picking up shock sub and returning back in hole. Been fishing for 36 Hrs. at present time.
2541630 Primary Facility 2016-12-01 Routine/Complete Inspection No Violations Noted Well properly identified. Well is equipped with production equipment and production tank.
2559970 Primary Facility 2017-02-06 Routine/Complete Inspection No Violations Noted Well properly identified. Well is equipped with production equipment and production tank. Operator currently drilling new wells on site.

Note: Utica Well

2708362 Primary Facility 2018-03-08 Compliance Evaluation No Violations Noted On March 8, 2018, the Department performed an inspection of the EQT/Rice Energy John Briggs B well pad site. Present during the inspection was Travor Coslett (Completion Consultant) and Dave Guidas (EQT). The site is located in Aleppo Twp., Greene Co. The inspection was CEI related to violations noted on 11/27/17 and 12/13/17.

The operator has coiling tubing operations active on site drilling out frac plugs on recently hydraulically fractured wells on the site. The coiling tubing operations are on on secondary containment which is in good condition. The operator has remediated the two reported reuse water releases on the well pad. The operator has recently completed construction of the PCSM structures on the site.

9 wells have been drilled to TD on the site, and proceeding towards placing the wells into production. The 9 completed wells have been drilled during return operations to the site.

For data sources see[9]

References