X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26743

Well Details

Well ID: 37-059-26743
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Franklin Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 150450
Farm/Lease Name: PATTON 7H
License Status: Active
Spud Date: 2015-01-08
Permit Date: 2014-12-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.913044
Longitude: -80.244111

For data sources see[1][2][3]

Well History

Date Event
2014-12-15 New Permit Application
2015-01-08 Performed Spud Operation
2015-01-23 Drilling Completion
2015-05-06 Drilling Completion
2015-08-25 Perforation
2015-08-25 Performed Stage 1 of Stimulation
2015-08-26 Perforation
2015-08-26 Performed Stage 2 of Stimulation
2015-08-27 Perforation
2015-08-27 Performed Stage 3 of Stimulation
2015-08-27 Performed Stage 4 of Stimulation
2015-08-27 Performed Stage 5 of Stimulation
2015-08-28 Perforation
2015-08-28 Performed Stage 6 of Stimulation
2015-08-30 Perforation
2015-08-30 Performed Stage 7 of Stimulation
2015-08-31 Perforation
2015-08-31 Performed Stage 8 of Stimulation
2015-09-01 Perforation
2015-09-01 Performed Stage 10 of Stimulation
2015-09-01 Performed Stage 9 of Stimulation
2015-09-02 Perforation
2015-09-02 Performed Stage 11 of Stimulation
2015-09-02 Performed Stage 12 of Stimulation
2015-09-03 Perforation
2015-09-03 Performed Stage 13 of Stimulation
2015-09-03 Performed Stage 14 of Stimulation
2015-09-03 Performed Stage 15 of Stimulation
2015-09-04 Perforation
2015-09-04 Performed Stage 16 of Stimulation
2015-09-05 Perforation
2015-09-05 Performed Stage 17 of Stimulation
2015-09-06 Perforation
2015-09-06 Performed Stage 18 of Stimulation
2015-09-07 Perforation
2015-09-07 Performed Stage 19 of Stimulation
2015-09-08 Perforation
2015-09-08 Performed Stage 20 of Stimulation
2015-09-09 Perforation
2015-09-09 Performed Stage 21 of Stimulation
2019-01-07 Deviated
2019-01-07 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-25 2015-09-09 7,834 6,522,050 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 7.5% HCL Trican ACID HYDROCLORIC ACID 7647-01-0 7.5 0.00455703 2733.82
40/70 Mesha Sand Trican Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 4.49158 2,694,560.0
WBO-2 Trican Breaker Sodium Persulfate 7775-27-1 75 0.00000125 0.75
FEAC-20 Trican Iron Control Cirtic Acid 77-92-9 27 0.000930685 558.331
Acetic Acid 64-19-7 45 0.00155114 930.551
Al-11 Trican Corrosion Inhibitor Potassium Iodide 7681-11-0 3.5 0.00006134 36.801
Propargly Alcohol 107-19-7 0.9 0.00001577 9.463
Propargyl Alcohol Deritative NA 45 0.000788717 473.162
SC-30 X-Chem Scale Inhibitor Sodium Hydroxide 1310-73-2 1.5 0.000150561 90.324
WG-111L Trican Viscosifier, Gel Polysaccharide blend NA 45 0.00004601 27.601
Light Hydrotreated Petroleum Distillate 64742-47-8 45 0.00004601 27.601
100 Mesh Trican Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 4.63707 2,781,840.0
Biocide X-Chem Biocide Chlorine Dioxide 10049-04-4 0.4 0.00006771 40.618
FR-20 Trican Friction Reducer Oleic Acid Diethanolamide 93-83-4 1 0.000543046 325.78
Alcohols, C12-16, Ethoxylated 68551-12-2 1 0.000543046 325.78
Distillates (Petroleum), Hydrotreated Light 64742-47-8 17 0.00923178 5538.27
Water 7732-18-5 43 0.023351 14008.6
Ammonium Chloride 12125-02-9 0.9 0.000488741 293.202
Polyacrylamide 69418-26-4 25 0.0135761 8144.51
WATER VANTAGE WATER WATER NA 100 90.724 54,426,500.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-08-25 1 Mesh Sand 1,052,406 8,727 9,174
2015-08-26 2 Mesh Sand 1,052,406 8,556 9,152
2015-08-27 3 Mesh Sand 1,052,406 8,534 9,447
2015-08-27 4 Mesh Sand 1,052,406 8,546 9,336
2015-08-27 5 Mesh Sand 1,052,406 8,436 9,066
2015-08-28 6 Mesh Sand 1,052,406 8,434 9,202
2015-08-30 7 Mesh Sand 1,052,406 8,487 9,113
2015-08-31 8 Mesh Sand 1,052,406 8,597 9,271
2015-09-01 9 Mesh Sand 1,052,406 8,284 8,951
2015-09-01 10 Mesh Sand 1,052,406 8,529 9,651
2015-09-02 11 Mesh Sand 1,052,406 8,472 9,114
2015-09-02 12 Mesh Sand 1,052,406 8,086 9,015
2015-09-03 13 Mesh Sand 1,052,406 8,229 9,343
2015-09-03 14 Mesh Sand 1,052,406 8,304 8,772
2015-09-03 15 Mesh Sand 1,052,406 8,298 9,077
2015-09-04 16 Mesh Sand 1,052,406 8,177 8,803
2015-09-05 17 Mesh Sand 1,052,406 8,150 8,845
2015-09-06 18 Mesh Sand 1,052,406 7,960 8,584
2015-09-07 19 Mesh Sand 1,052,406 8,083 8,787
2015-09-08 20 Mesh Sand 1,052,406 8,170 8,748
2015-09-09 21 Mesh Sand 1,052,406 8,022 8,779

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 VANTAGE ENERGY APPALACHIA II LLC 453,531.08 59 0.00 0 0.00 0
2016 VANTAGE ENERGY APPALACHIA II LLC 1,290,780.64 280 0.00 0 0.00 0
2017 RICE DRILLING B LLC 806,455.47 354 0.00 0 0.00 0
2018 RICE DRILLING B LLC 338,628.00 297 0.00 0 0.00 0
2019 RICE DRILLING B LLC 249,432.00 226 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 226.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 542.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 30.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2015 VANTAGE ENERGY APPALACHIA II LLC Drill Cuttings 756.07 Tons LANDFILL 100419
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 105.00 Bbl INJECTION DISPOSAL WELL 34-155-24078
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 10,915.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 105.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2015 VANTAGE ENERGY APPALACHIA II LLC Fracturing Fluid Waste 10.00 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 1,714.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 VANTAGE ENERGY APPALACHIA II LLC Drill Cuttings 290.82 Tons LANDFILL PAD059087072
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 578.87 Bbl INJECTION DISPOSAL WELL 34-059-24202
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 105.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 73.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 VANTAGE ENERGY APPALACHIA II LLC Fracing Fluid Waste 27.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1,404.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Fracturing Fluid Waste 32.36 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2016 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 1,765.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 127.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 15,854.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1,348.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA II LLC Fracturing Fluid Waste 2.68 Tons LANDFILL 100620
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 68.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 130.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2016 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 189.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA II LLC Synthetic Liner Materials 1.80 Tons LANDFILL 100620
2016 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil & Gas Related Spills 5.07 Tons LANDFILL 100172
2016 VANTAGE ENERGY APPALACHIA II LLC Servicing Fluid 19.00 Tons REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 150.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 122.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil & Gas Related Spills 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Produced Fluid 9.09 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.54 Tons LANDFILL CID # 28726
2017 VANTAGE ENERGY APPALACHIA II LLC Synthetic Liner Materials 7.93 Tons LANDFILL 100663
2017 VANTAGE ENERGY APPALACHIA II LLC Filter Socks 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil 2.66 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 259.10 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 25.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 VANTAGE ENERGY APPALACHIA II LLC Filter Socks 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 3,683.25 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Waste Water Treatment Sludge 2.50 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 123.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 12.75 Tons LANDFILL 100172
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 VANTAGE ENERGY APPALACHIA II LLC Waste Water Treatment Sludge 3.85 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1.27 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017 VANTAGE ENERGY APPALACHIA II LLC Soil Contaminated by Oil & Gas Related Spills 2.66 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 7.27 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 870.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Produced Fluid 9.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 1,500.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Soil Contaminated by Oil 0.54 Tons LANDFILL CID # 28726
2018 RICE DRILLING B LLC Produced Fluid 59.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 6.13 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 115.45 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 70.06 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 20.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 9.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 116.38 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 394.23 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 38.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2431942 Primary Facility 2015-11-09 Incident- Response to Accident or Event No Violations Noted On 11/9/2015, I performed an inspection of Vantage Energy's Patton well pad site. The site is located in Franklin Twp., Greene County. Present at time of inspection was Tim Ratvasky (SE Tech). The inspection was performed as a routine inspection related to a reported spill by the operator at the site.
2515737 Primary Facility 2016-08-09 Routine/Complete Inspection No Violations Noted Well properly identified and equipped for production. Operator currently drilling Patton 15H well. (059-27057).
2549022 Primary Facility 2016-10-15 Administrative/File Review In Compliance with Policy

On 10/15/16 at approximately 1200 hours I completed an administrative inspection in response to a release at the Patton pad. A spill out of containment of approximately 1 barrel of water and drilling cuttings was reported, but an accurate volume could not be determined due to rain water being present on the containment. Weavertown Environmental performed the cleanup of the site. SE Technologies LLC submitted a letter on Vantage’s behalf requesting that the Act 2 process be waived, due to the inconclusive volume released and low conductivity levels. The Department determined that the evidence provided was reasonable and has permitted Vantage to continue without the Act 2 process. The spill was handled in compliance with DEP policy.

2550437 Primary Facility 2016-12-27 Routine/Complete Inspection No Violations Noted

On 12/27/16 at approximately 1030 hours I conducted a routine complete inspection of the Patton Unit. The Act 9 sign was in place and all required documents were present at the site.

A U shape of sediment sock had been placed immediately adjacent to the first stream crossing to serve as an infiltration berm for water eroding the road surface. It is highly recommended that the road be repaired and the material stopped by the sock removed to prevent a BMP failure at the stream.

The GPUs were found to be in secondary containment consistent with Chapter 78A.64b which requires equipment containing regulated substances to be placed within secondary containment.

The site overall was well vegetated and no signs of erosion were observed at the time of inspection with the exception of the road surface.

For data sources see[9]

References