If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26926 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.853708,"lon":-80.361275,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Jackson Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 144730 | |
Farm/Lease Name: JAMES RICE | |
License Status: Active | |
Spud Date: 2015-07-29 | |
Permit Date: 2015-07-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.853708 | |
Longitude: -80.361275 |
Date | Event |
---|---|
2015-07-17 | New Permit Application |
2015-07-29 | Performed Spud Operation |
2015-11-07 | Drilling Completion |
2015-11-15 | Perforation |
2015-12-03 | Perforation |
2015-12-30 | Perforation |
2015-12-30 | Performed Stage 1 of Stimulation |
2015-12-30 | Performed Stage 2 of Stimulation |
2015-12-30 | Performed Stage 3 of Stimulation |
2015-12-31 | Perforation |
2015-12-31 | Performed Stage 4 of Stimulation |
2015-12-31 | Performed Stage 5 of Stimulation |
2015-12-31 | Performed Stage 6 of Stimulation |
2015-12-31 | Performed Stage 7 of Stimulation |
2016-01-01 | Perforation |
2016-01-01 | Performed Stage 10 of Stimulation |
2016-01-01 | Performed Stage 8 of Stimulation |
2016-01-01 | Performed Stage 9 of Stimulation |
2016-01-02 | Perforation |
2016-01-02 | Performed Stage 11 of Stimulation |
2016-01-02 | Performed Stage 12 of Stimulation |
2016-01-02 | Performed Stage 13 of Stimulation |
2016-01-02 | Performed Stage 14 of Stimulation |
2016-01-03 | Perforation |
2016-01-03 | Performed Stage 15 of Stimulation |
2016-01-03 | Performed Stage 16 of Stimulation |
2016-01-03 | Performed Stage 17 of Stimulation |
2016-01-04 | Perforation |
2016-01-04 | Performed Stage 18 of Stimulation |
2016-01-04 | Performed Stage 19 of Stimulation |
2016-01-04 | Performed Stage 20 of Stimulation |
2016-01-05 | Perforation |
2016-01-05 | Performed Stage 21 of Stimulation |
2016-01-05 | Performed Stage 22 of Stimulation |
2016-01-05 | Performed Stage 23 of Stimulation |
2016-01-06 | Perforation |
2016-01-06 | Performed Stage 24 of Stimulation |
2016-01-06 | Performed Stage 25 of Stimulation |
2016-01-07 | Perforation |
2016-01-07 | Performed Stage 26 of Stimulation |
2016-01-07 | Performed Stage 27 of Stimulation |
2016-01-07 | Performed Stage 28 of Stimulation |
2016-01-07 | Performed Stage 29 of Stimulation |
2016-01-07 | Performed Stage 30 of Stimulation |
2018-09-25 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-12-29 | 2016-01-07 | 7,911 | 8,981,150 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh | Trican | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.82438 | 4,031,860.0 |
Water | Vantage | Water | Water | NA | 100 | 89.6798 | 74,947,700.0 | |
40/70 Mesha Sand | Trican | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.763 | 3,980,560.0 | |
FR-20 | Trican | Friction Reducer | Ammonium Chloride | 12125-02-9 | 0.9 | 0.000629202 | 525.84 | |
Polyacrylamide | 69418-26-4 | 25 | 0.0174778 | 14606.7 | ||||
Water | 7732-18-5 | 43 | 0.0300619 | 25123.5 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 17 | 0.0118849 | 9932.54 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 1 | 0.000699113 | 584.267 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 1 | 0.000699113 | 584.267 | ||||
Al-11 | Trican | Corrosion Inhibitor | Potassium Iodide | 7681-11-0 | 3.5 | 0.00006291 | 52.574 | |
Propargyl Alcohol Deritative | NA | 45 | 0.000808812 | 675.945 | ||||
Propargly Alcohol | 107-19-7 | 0.9 | 0.00001618 | 13.519 | ||||
FEAC-20 | Trican | Iron Control | Acetic Acid | 64-19-7 | 45 | 0.00159066 | 1329.36 | |
Cirtic Acid | 77-92-9 | 27 | 0.000954398 | 797.615 | ||||
Biocide | X-Chem | Biocide | Chlorine Dioxide | 10049-04-4 | 0.4 | 0.00007223 | 60.366 | |
SC-30 | X-Chem | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 1.5 | 0.000246196 | 205.753 | |
7.5% HCL | Trican | Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0467314 | 39054.6 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-12-30 | 1 | Mesh Sand | 24,848 | 8,268 | 9,037 |
2015-12-30 | 2 | Mesh Sand | 24,848 | 8,731 | 9,043 |
2015-12-30 | 3 | Mesh Sand | 24,848 | 8,697 | 8,952 |
2015-12-31 | 4 | Mesh Sand | 24,848 | 8,796 | 5,975 |
2015-12-31 | 5 | Mesh Sand | 24,848 | 8,542 | 8,915 |
2015-12-31 | 6 | Mesh Sand | 24,848 | 8,748 | 9,068 |
2015-12-31 | 7 | Mesh Sand | 24,848 | 8,584 | 9,149 |
2016-01-01 | 8 | Mesh Sand | 24,848 | 8,400 | 8,609 |
2016-01-01 | 9 | Mesh Sand | 24,848 | 8,455 | 9,221 |
2016-01-01 | 10 | Mesh Sand | 24,848 | 8,148 | 8,844 |
2016-01-02 | 11 | Mesh Sand | 24,848 | 8,505 | 9,168 |
2016-01-02 | 12 | Mesh Sand | 24,848 | 8,370 | 8,919 |
2016-01-02 | 13 | Mesh Sand | 24,848 | 8,333 | 8,975 |
2016-01-02 | 14 | Mesh Sand | 24,848 | 8,313 | 9,061 |
2016-01-03 | 15 | Mesh Sand | 24,848 | 8,000 | 8,734 |
2016-01-03 | 16 | Mesh Sand | 24,848 | 8,005 | 9,006 |
2016-01-03 | 17 | Mesh Sand | 24,848 | 7,991 | 8,789 |
2016-01-04 | 18 | Mesh Sand | 24,848 | 7,630 | 9,590 |
2016-01-04 | 19 | Mesh Sand | 24,848 | 8,565 | 8,997 |
2016-01-04 | 20 | Mesh Sand | 24,848 | 8,061 | 8,805 |
2016-01-05 | 21 | Mesh Sand | 24,848 | 7,889 | 8,636 |
2016-01-05 | 22 | Mesh Sand | 24,848 | 8,200 | 8,580 |
2016-01-05 | 23 | Mesh Sand | 24,848 | 8,072 | 8,511 |
2016-01-06 | 24 | Mesh Sand | 24,848 | 8,252 | 8,656 |
2016-01-06 | 25 | Mesh Sand | 24,848 | 8,166 | 8,602 |
2016-01-07 | 26 | Mesh Sand | 24,848 | 8,066 | 8,549 |
2016-01-07 | 27 | Mesh Sand | 24,848 | 7,741 | 8,455 |
2016-01-07 | 28 | Mesh Sand | 24,848 | 7,948 | 8,277 |
2016-01-07 | 29 | Mesh Sand | 24,848 | 7,803 | 8,163 |
2016-01-07 | 30 | Mesh Sand | 24,848 | 8,640 | 8,476 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | 2,923,344.67 | 303 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 1,278,262.68 | 355 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,275,161.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 998,298.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 1,148.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Fracing Fluid Waste | 903.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 948.83 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 632.43 Tons | LANDFILL | PAD059087072 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 15.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 42.62 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 425.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 2,084.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 2,503.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 20,408.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 873.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 2,639.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 73.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 115.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 1.76 Tons | LANDFILL | 100620 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 2.50 Tons | LANDFILL | 100172 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 32.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 64.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 0.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 19.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 1.35 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 7.86 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 179.99 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 17.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,232.25 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 7.39 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 8.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil | 0.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Waste Water Treatment Sludge | 1.46 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil | 9.55 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 7.02 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 7.57 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 9.55 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 289.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 119.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 52.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 175.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 37.77 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 40.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 2.14 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 18.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 428.96 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 13.15 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Soil Contaminated by Oil | 4.73 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2019 | RICE DRILLING B LLC | Produced Fluid | 351.55 Bbl | INJECTION DISPOSAL WELL | 34-167-29543 |
2019 | RICE DRILLING B LLC | Produced Fluid | 60.65 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Produced Fluid | 16.63 Bbl | INJECTION DISPOSAL WELL | 34-009-23823 |
2019 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 4.73 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 120.72 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 606.69 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 21.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2398758 | Primary Facility | 2015-08-05 | Drilling/Alteration | No Violations Noted | Well spud on 7/29/2015. Operator drilled 30-inch borehole and set 26-inch conductor pipe at 40 ft |
2408610 | Primary Facility | 2015-09-17 | Drilling/Alteration | No Violations Noted | Northeast Energy Rig #12. Surface casing (20”) set @ 460.19’ and cemented on 9/13/15. Coal protective casing (13 3/8”) set @ 1,257.55’and cemented on 9/15/15. Current hole depth 2,001’. TIH with tri-cone to drill 12 ¼” hole for 9 5/8” intermediate casing |
2419082 | Primary Facility | 2015-09-24 | Drilling/Alteration | No Violations Noted | Northeast Energy Rig #12. Intermediate casing (9 5/8””) set @ 2,781.43’ and cemented on 9/19/15. Operator currently fishing tooling debris @ 6,091’ from borehole. Conduct site inspection. Observe fluids on surface of mats and containment. Notify drill site manager. Drill site personnel cleaning up fluids. |
2431400 | Primary Facility | 2015-10-30 | Drilling/Alteration | No Violations Noted | Top hole casing set installed. Top hole section of the borehole drilled to 7,435’ MD on 9/26/15. Borehole loaded with drilling mud. Northeast Energy Rig # 12 offsite. |
2438545 | Primary Facility | 2016-01-04 | Incident- Response to Accident or Event | No Violations Noted | |
2465600 | Primary Facility | 2016-02-23 | Routine/Complete Inspection | No Violations Noted | Well is capable of production. |
For data sources see[9]