X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26943

Well Details

Well ID: 37-059-26943
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Richhill Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 147604
Farm/Lease Name: DENNIS CHOLAK
License Status:
Spud Date: 2015-11-27
Permit Date: 2015-09-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.903372
Longitude: -80.410925

For data sources see[1][2][3]

Well History

Date Event
Deviated
2015-09-11 New Permit Application
2015-11-24 Performed Spud Operation
2016-12-01 New Permit Application
2017-03-22 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2016 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2017 RICE DRILLING B LLC 763,765.35 62 0.00 0 0.00 0
2018 RICE DRILLING B LLC 3,013,553.00 365 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,620,035.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RICE DRILLING B LLC Drill Cuttings 85.89 Tons LANDFILL 06-08438
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 567.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 27.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Drilling Fluid Waste 310.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 873.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Drill Cuttings 231.34 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Drill Cuttings 88.99 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Produced Fluid 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Drill Cuttings 377.26 Tons LANDFILL 100663
2016 RICE DRILLING B LLC Drilling Fluid Waste 293.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 8.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Synthetic Liner Materials 24.61 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Drilling Fluid Waste 1.37 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.27 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Drill Cuttings 13.17 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Produced Fluid 18.42 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 RICE DRILLING B LLC Synthetic Liner Materials 12.30 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Filter Socks 0.10 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Produced Fluid 38.35 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 RICE DRILLING B LLC Produced Fluid 26.59 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 4,128.54 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 220.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 201.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 310.58 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Drill Cuttings 231.99 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Produced Fluid 33.61 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017 RICE DRILLING B LLC Drilling Fluid Waste 142.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 11.68 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 RICE DRILLING B LLC Drill Cuttings 20.39 Tons LANDFILL 100620
2017 RICE DRILLING B LLC Produced Fluid 116.04 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 4,339.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 0.41 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Soil Contaminated by Oil 0.27 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Produced Fluid 38.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RICE DRILLING B LLC Produced Fluid 45.89 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 1,523.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 574.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 97.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RICE DRILLING B LLC Produced Fluid 466.05 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 510.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 143.79 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 RICE DRILLING B LLC Produced Fluid 1,242.07 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 95.44 Bbl INJECTION DISPOSAL WELL 34-031-27177
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 226.66 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Synthetic Liner Materials 26.40 Tons LANDFILL SWF 1032-WV0109
2019 RICE DRILLING B LLC Produced Fluid 3,409.43 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 38.56 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 36.67 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 RICE DRILLING B LLC Produced Fluid 805.01 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 8.60 Tons LANDFILL 100663
2019 RICE DRILLING B LLC Synthetic Liner Materials 4.02 Tons LANDFILL 100419

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2432700 Primary Facility 2015-12-03 Drilling/Alteration No Violations Noted Well spud on 11/27/2015. Operator drilled 36-inch borehole and set and cemented 30-inch conductor pipe at 100 ft. Cylindrical well cellar installed around conductor. Cellar floor cemented around conductor.
2483880 Primary Facility 2016-05-04 Drilling/Alteration No Violations Noted Falcon Rig 23. Drilling 24” hole for 20” surface casing. Drilling ahead @ 204’.
2483881 Primary Facility 2016-05-09 Drilling/Alteration No Violations Noted Falcon Rig 23. Surface casing (20”) set at 281’ and cemented to the surface via displacement method on 5/5/16. 15 bbls cement circulated to the surface. Borehole loaded with freshwater. Welded cap and gauge installed on surface casing.
2499836 Primary Facility 2016-07-08 Drilling/Alteration No Violations Noted Falcon Rig 29. Operator drilled 17 ½” hole to 905’. Cleaning hole and preparing to run in coal protective casing. Coal seam encountered 852’ – 856’.
2501599 Primary Facility 2016-07-13 Drilling/Alteration No Violations Noted Falcon Rig 29. Operator drilling ahead @ 4,612’. Coal Protective casing (13 3/8”) was set @ 889’ and cemented to surface on 7/8/2016. 12 bbls cement was circulated to the surface. Intermediate casing (9 5/8”) set @ 2,513’ and cemented to surface on 7/10/2016. 29 bbls cement was circulated to the surface. Review casing/cementing information.
2502575 Primary Facility 2016-07-19 Drilling/Alteration No Violations Noted Top hole portion of the well is complete. Surface, coal, and intermediate casings set and cemented to the surface. Borehole drilled to 6,500’ on 7/14/2016. Borehole loaded with drilling mud and capped.
2541504 Primary Facility 2016-11-22 Routine/Complete Inspection No Violations Noted Drilling has started, but the well has not been completed.
2561091 Primary Facility 2017-02-02 Routine/Complete Inspection No Violations Noted Well conductor and surface casing set. Well awaiting drilling activity to resume.
2576386 Primary Facility 2017-03-13 Routine/Complete Inspection No Violations Noted On March 13, 2017, the department performed inspection of the Rice Energy Dennis Cholak site with Joe Keller (DEP). This site is located in Richhill Township, Greene County. The inspection was performed as a routine inspection during drilling operations.

The operator has returned to the site with a drill rig to complete drilling on the 50U and 52U wells on site. The 8H well was completed and drilled to TD by Chesapeake while Chesapeake was the owner of the site. The 8H well is inactive status with the state.

2577995 Primary Facility 2017-03-28 Drilling/Alteration No Violations Noted Rig off site. Rig mats and containment on site. Well has been drilled to total depth. Production casing set and cemented @ 15,852’ on 3/24/17. 11 bbls spacer returned to surface.
2694493 Primary Facility 2018-02-14 Routine/Complete Inspection No Violations Noted The well is equipped for production.

For data sources see[7]

References