If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26943 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.903372,"lon":-80.410925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Richhill Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 147604 | |
Farm/Lease Name: DENNIS CHOLAK | |
License Status: | |
Spud Date: 2015-11-27 | |
Permit Date: 2015-09-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.903372 | |
Longitude: -80.410925 |
Date | Event |
---|---|
Deviated | |
2015-09-11 | New Permit Application |
2015-11-24 | Performed Spud Operation |
2016-12-01 | New Permit Application |
2017-03-22 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 763,765.35 | 62 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 3,013,553.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,620,035.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Drill Cuttings | 85.89 Tons | LANDFILL | 06-08438 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 567.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 27.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 310.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 16.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 873.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Drill Cuttings | 231.34 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 88.99 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Produced Fluid | 15.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 377.26 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 293.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 8.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 24.61 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 1.37 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.27 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 13.17 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 18.42 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 12.30 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 38.35 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 26.59 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 4,128.54 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 220.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 201.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 310.58 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Drill Cuttings | 231.99 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 33.61 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 142.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 11.68 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 20.39 Tons | LANDFILL | 100620 |
2017 | RICE DRILLING B LLC | Produced Fluid | 116.04 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 4,339.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 0.41 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.27 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 38.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Produced Fluid | 45.89 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,523.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 574.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 97.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 466.05 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 510.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 143.79 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2018 | RICE DRILLING B LLC | Produced Fluid | 1,242.07 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 95.44 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 226.66 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Synthetic Liner Materials | 26.40 Tons | LANDFILL | SWF 1032-WV0109 |
2019 | RICE DRILLING B LLC | Produced Fluid | 3,409.43 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 38.56 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 36.67 Bbl | INJECTION DISPOSAL WELL | 34-167-29543 |
2019 | RICE DRILLING B LLC | Produced Fluid | 805.01 Bbl | INJECTION DISPOSAL WELL | 34-167-29543 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 8.60 Tons | LANDFILL | 100663 |
2019 | RICE DRILLING B LLC | Synthetic Liner Materials | 4.02 Tons | LANDFILL | 100419 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2432700 | Primary Facility | 2015-12-03 | Drilling/Alteration | No Violations Noted | Well spud on 11/27/2015. Operator drilled 36-inch borehole and set and cemented 30-inch conductor pipe at 100 ft. Cylindrical well cellar installed around conductor. Cellar floor cemented around conductor. |
2483880 | Primary Facility | 2016-05-04 | Drilling/Alteration | No Violations Noted | Falcon Rig 23. Drilling 24” hole for 20” surface casing. Drilling ahead @ 204’. |
2483881 | Primary Facility | 2016-05-09 | Drilling/Alteration | No Violations Noted | Falcon Rig 23. Surface casing (20”) set at 281’ and cemented to the surface via displacement method on 5/5/16. 15 bbls cement circulated to the surface. Borehole loaded with freshwater. Welded cap and gauge installed on surface casing. |
2499836 | Primary Facility | 2016-07-08 | Drilling/Alteration | No Violations Noted | Falcon Rig 29. Operator drilled 17 ½” hole to 905’. Cleaning hole and preparing to run in coal protective casing. Coal seam encountered 852’ – 856’. |
2501599 | Primary Facility | 2016-07-13 | Drilling/Alteration | No Violations Noted | Falcon Rig 29. Operator drilling ahead @ 4,612’. Coal Protective casing (13 3/8”) was set @ 889’ and cemented to surface on 7/8/2016. 12 bbls cement was circulated to the surface. Intermediate casing (9 5/8”) set @ 2,513’ and cemented to surface on 7/10/2016. 29 bbls cement was circulated to the surface. Review casing/cementing information. |
2502575 | Primary Facility | 2016-07-19 | Drilling/Alteration | No Violations Noted | Top hole portion of the well is complete. Surface, coal, and intermediate casings set and cemented to the surface. Borehole drilled to 6,500’ on 7/14/2016. Borehole loaded with drilling mud and capped. |
2541504 | Primary Facility | 2016-11-22 | Routine/Complete Inspection | No Violations Noted | Drilling has started, but the well has not been completed. |
2561091 | Primary Facility | 2017-02-02 | Routine/Complete Inspection | No Violations Noted | Well conductor and surface casing set. Well awaiting drilling activity to resume. |
2576386 | Primary Facility | 2017-03-13 | Routine/Complete Inspection | No Violations Noted | On March 13, 2017, the department performed inspection of the Rice Energy Dennis Cholak site with Joe Keller (DEP). This site is located in Richhill Township, Greene County. The inspection was performed as a routine inspection during drilling operations.
The operator has returned to the site with a drill rig to complete drilling on the 50U and 52U wells on site. The 8H well was completed and drilled to TD by Chesapeake while Chesapeake was the owner of the site. The 8H well is inactive status with the state. |
2577995 | Primary Facility | 2017-03-28 | Drilling/Alteration | No Violations Noted | Rig off site. Rig mats and containment on site. Well has been drilled to total depth. Production casing set and cemented @ 15,852’ on 3/24/17. 11 bbls spacer returned to surface. |
2694493 | Primary Facility | 2018-02-14 | Routine/Complete Inspection | No Violations Noted | The well is equipped for production. |
For data sources see[7]