If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26970 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.819153,"lon":-80.343125,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Jackson Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153074 | |
Farm/Lease Name: POLAR VORTEX 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2015-10-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.819153 | |
Longitude: -80.343125 |
Date | Event |
---|---|
2015-10-16 | New Permit Application |
2016-09-22 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-15 | 2017-11-05 | 7,947 | 23,591,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFRA- 405 | USWS | Anionic Friction Reducer | Listed Below | ||||
Water | USWS | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.4784 | 196,872,000.0 | |
Oxyalkylated Alcohol | Proprietary | 5 | 0.000622407 | 1384.91 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0365679 | 81366.9 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001442 | 32.082 | ||||
Alkyl Alcohol | Proprietary | 10 | 0.00124481 | 2769.82 | ||||
Acetophenone, thiourea, formaldehyde polymer | 68527-49-1 | 5 | 0.00000360 | 8.021 | ||||
Methanol | 67-56-1 | 50 | 0.000167456 | 372.604 | ||||
Formic Acid | 64-18-6 | 20 | 0.00001442 | 32.082 | ||||
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) | 34690-00-1 | 20 | 0.00164578 | 3662.02 | ||||
Polycarboxylic Acid Salt Mixture | Proprietary | 40 | 0.000164281 | 365.54 | ||||
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) | 34690-00-1 | 20 | 0.00164578 | 3662.02 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.00373444 | 8309.47 | ||||
DETA Phophonate | 15827-60-8 | 20 | 0.00164578 | 3662.02 | ||||
2-Propenoic Acid, Polymer with 2-propenamide | 9003-06-9 | 30 | 0.000508949 | 1132.46 | ||||
Butyl Cellosolve | 111-76-2 | 20 | 0.00001442 | 32.082 | ||||
Butyl Cellosolve | 111-76-2 | 20 | 0.00001442 | 32.082 | ||||
2-Propenoic Acid, Polymer with 2-propenamide | 9003-06-9 | 30 | 0.000508949 | 1132.46 | ||||
Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.0155979 | 34706.8 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.00002884 | 64.165 | ||||
Inorganic Salt | Proprietary | 10 | 0.00124481 | 2769.82 | ||||
Alcohols, C11-14-iso-, C13-rich, Ethoxylated | 78330-21-9 | 5 | 0.00005063 | 112.65 | ||||
Polycarboxylic Acid Salt Mixture | Proprietary | 40 | 0.000164281 | 365.54 | ||||
Formic Acid | 64-18-6 | 20 | 0.00001442 | 32.082 | ||||
Acetophenone, thiourea, formaldehyde polymer | 68527-49-1 | 5 | 0.00000360 | 8.021 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001442 | 32.082 | ||||
Alkyl Alcohol | Proprietary | 10 | 0.00124481 | 2769.82 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00351038 | 7810.92 | ||||
Hydrotreated Light Distillate (Petroleum) | 64742-47-8 | 30 | 0.000508949 | 1132.46 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 21 | 0.00147436 | 3280.59 | ||||
Hydrotreated Light Distillate (Petroleum) | 64742-47-8 | 30 | 0.000508949 | 1132.46 | ||||
Oxyalkylated Alcohol | Proprietary | 5 | 0.000622407 | 1384.91 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 70 | 0.00576025 | 12817.1 | ||||
DETA Phophonate | 15827-60-8 | 20 | 0.00164578 | 3662.02 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 21 | 0.00147436 | 3280.59 | ||||
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 20 | 0.00164578 | 3662.02 | ||||
Ethoxylated Alcohol | Proprietary | 5 | 0.00259965 | 5784.46 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 70 | 0.00576025 | 12817.1 | ||||
Silica Substrate | 14808-60-7 | 100 | 11.186 | 24,889,800.0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.00002884 | 64.165 | ||||
Hypochlorous Acid, Sodium Salt | 7681-52-9 | 12.5 | 0.000978294 | 2176.79 | ||||
Polyether | Proprietary | 10 | 0.00000721 | 16.041 | ||||
Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 30 | 0.000303763 | 675.9 | ||||
Hypochlorous Acid, Sodium Salt | 7681-52-9 | 12.5 | 0.000978294 | 2176.79 | ||||
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 20 | 0.00164578 | 3662.02 | ||||
Poly(oxy-1,2-ethanediyl)-alpha-tridecyl-omega-hydroxy-branche d |
69011-36-5 | 5 | 0.00259965 | 5784.46 | ||||
Petroleum Distillates, Hydrotreated Light | 64742-47-8 | 28 | 0.000164448 | 365.912 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00351038 | 7810.92 | ||||
Inorganic Salt | Proprietary | 10 | 0.00124481 | 2769.82 | ||||
Polyether | Proprietary | 10 | 0.00000721 | 16.041 | ||||
Methanol | 67-56-1 | 50 | 0.000167456 | 372.604 | ||||
Sand (Proppant) | USWS | Proppant | Listed Below | |||||
Silver FR-543 | Silverback Chemical | Friction Reducer | Listed Below | |||||
LD-2950 | Multi-Chem | Friction Reducer | Listed Below | |||||
Hydrochloric Acid (15%) | USWS | Acidizing | Listed Below | |||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 30 | 0.00210623 | 4686.55 | |
InsituCide | Silver Creek Services | Biocide Promoter | Listed Below | |||||
K-BAC 1020 DBNPA | WST | Biocide | Listed Below | |||||
AI-303 | USWS | Corrosion Inhibitor | Water | 7732-18-5 | 30 | 0.00210623 | 4686.55 | |
SI-117 | WST | Scale Inhibitor | Listed Below | |||||
WFRC-2350 | USWS | Friction Reducer | Listed Below | |||||
Silver FR-1014 | Silverback Chemical | Friction Reducer | Listed Below | |||||
ICA-800 | Silverback Chemical | Anti-Scalant | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 182,009.00 | 14 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 7,203,771.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 3,478,233.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 65.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 158.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 7.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 101.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 59.90 Tons | LANDFILL | 100620 |
2016 | RICE DRILLING B LLC | Produced Fluid | 53.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 598.02 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 625.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 511.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 144.15 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 4.96 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 1.51 Tons | LANDFILL | 06-08438 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 16.87 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 38.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 0.93 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 78.74 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 3.55 Tons | LANDFILL | CID # 28726 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 28.18 Tons | LANDFILL | 100620 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 7.34 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 693.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 778.50 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 0.66 Tons | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2017 | RICE DRILLING B LLC | Produced Fluid | 402.75 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 79.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2014-4 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 167.70 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 28.71 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 25.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 136.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 55.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 4.14 Tons | LANDFILL | 100419 |
2017 | RICE DRILLING B LLC | Produced Fluid | 73.92 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 668.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Servicing Fluid | 2.38 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 58.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 113.75 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 308.50 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 3.55 Tons | LANDFILL | CID # 28726 |
2018 | RICE DRILLING B LLC | Produced Fluid | 249.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | RICE DRILLING B LLC | Produced Fluid | 2,424.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 74.00 Bbl | INJECTION DISPOSAL WELL | 34-009-23823 |
2018 | RICE DRILLING B LLC | Produced Fluid | 71.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 3,534.90 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 135.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 16.25 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 26.78 Bbl | INJECTION DISPOSAL WELL | 34-167-28462 |
2018 | RICE DRILLING B LLC | Produced Fluid | 5,698.13 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 19.81 Tons | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2018 | RICE DRILLING B LLC | Produced Fluid | 48.06 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2018 | RICE DRILLING B LLC | Produced Fluid | 27.24 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2019 | RICE DRILLING B LLC | Produced Fluid | 113.40 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 237.50 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 3,632.83 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 27.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 115.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2503790 | Primary Facility | 2016-07-08 | Routine/Complete Inspection | No Violations Noted | Site being constructed. Well not drilled yet. |
2513698 | Primary Facility | 2016-07-14 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2514365 | Primary Facility | 2016-07-20 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled. |
2514673 | Primary Facility | 2016-07-26 | Routine/Complete Inspection | No Violations Noted | Site being constructed. Well not drilled. |
2514821 | Primary Facility | 2016-08-01 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2517190 | Primary Facility | 2016-08-04 | Routine/Complete Inspection | No Violations Noted | Site being constructed. Well not drilled. |
2517315 | Primary Facility | 2016-08-10 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled. |
2517397 | Primary Facility | 2016-08-16 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2517959 | Primary Facility | 2016-08-24 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled at time of inspection. |
2518272 | Primary Facility | 2016-09-01 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled at time of inspection. |
2522530 | Primary Facility | 2016-09-26 | Drilling/Alteration | No Violations Noted | Well spud on 9/22/2016. Operator drilled 36-inch borehole and set and cemented 26-inch conductor pipe at 40 ft. Cylindrical well cellar installed around conductor. Cellar floor cemented around conductor. |
2526670 | Primary Facility | 2016-09-06 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2528693 | Primary Facility | 2016-09-14 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled. Pre-spud inspection. |
2531746 | Primary Facility | 2016-10-13 | Routine/Complete Inspection | No Violations Noted | Well has been spud. Commencment of drilling activity expected. |
2537090 | Primary Facility | 2016-11-10 | Drilling/Alteration | No Violations Noted | Well spud on 9/22/2016. Conductor cemented in place. Operator currently rigging up on Polar Vortex 2H 059-26969. |
2538142 | Primary Facility | 2016-10-24 | Routine/Complete Inspection | No Violations Noted | Well conductor set. Continuation of drilling to commence in the near future. |
2543494 | Primary Facility | 2016-12-01 | Drilling/Alteration | No Violations Noted | Tophole portion of the well has been completed. Surface, coal, and intermediate casings have been set and cemented to the surface by the displacement method. Operator circulated cement to the surface on all casing strings. Operator has drilled 8 ¾” pilot hole to 7,115’ TMD/7,108’ TVD on 11/27/16. Borehole is capped and loaded with drilling mud. |
2574708 | Primary Facility | 2017-03-13 | Routine/Complete Inspection | No Violations Noted | On March 13, 2017, the Department performed an inspection of the Rice Energy Polar Vortex well pad site. The site is located in Jackson Township, Greene county. The inspection was a routine complete inspection during drilling activity.
The operator is currently completing installation of secondary containment and is moving rig on site to complete drilling of lateral sections on the four wells on site. Well drilled to TVD and awaiting drilling resumption to complete drilling to TD. |
2585141 | Primary Facility | 2017-04-18 | Drilling/Alteration | No Violations Noted | Drilling complete. Production casing cemented on 4/11/17. Production casing set and cemented at 19,415’ TMD / 7,860’. |
2642177 | Primary Facility | 2017-09-28 | Incident- Response to Accident or Event | Violation(s) Noted | On September 28, 2017, the Department performed an inspection of the Rice Energy Polar Vortex well pad site. Present at ime of inspection was Jon Bechdel and Aaron Parker (Rice). The site is located in Jackson Twp., Greene Co. The inspection was related to a frac fluid release reported by the operator.
The operator reported a release of frac fluid to the well pad with approximately 3 barrels being released to the well pad near the entrance to the well pad from the access road. The operator reported that during completion operations of the 4H well on site a transducer malfunctioned causing the release valve on the 4H well to release pressure and frac fluid to the well pad. The frac fluid was released in a "geyser" manner which covered the well pad secondary containment and approximately 3 barrels were released to the well pad. The operator had SPSI on site excavating impacted stone from the well pad and storing it on site in a rolloff box for disposal. The remediation was being directed by Envirotrac. En |
2673202 | Primary Facility | 2017-12-07 | Follow-up Inspection | Violation(s) & Recurring Violations | On December 7, 2017, the Department performed an inspection of the Rice Energy Polar Vortex well pad site. Present at ime of inspection was Joe Fletcher (EQT). The site is located in Jackson Twp., Greene Co. The inspection was related to a frac fluid release reported by the operator on 9/28/17, and noted violations.
On 9/28/17, the operator reported a release of frac fluid to the well pad with approximately 3 barrels being released to the well pad near the entrance to the well pad from the access road. The operator reported that during completion operations of the 4H well on site a transducer malfunctioned causing the release valve on the 4H well to release pressure and frac fluid to the well pad. The frac fluid was released in a "geyser" manner which covered the well pad secondary containment and approximately 3 barrels were released to the well pad. The operator contracted SPSI to excavate impacted stone from the well pad for disposal. The remediation was directed by Envirotrac. Envirotrac performed co |
2708374 | Primary Facility | 2018-03-08 | Compliance Evaluation | No Violations Noted | On March 8, 2018, the Department performed an inspection of the EQT/Rice Energy Polar Vortex well pad site. The site is located in Jackson Twp., Greene Co. The inspection was CEI related to violations noted on 9/28/17 and 12/7/17.
The operator has finished flow back operations on the recently hydraulically fractured wells on the site. The flow back equipment has been removed. The operator has remediated the two reported frac fluid releases on the well pad. The operator has recently completed construction of the PCSM structures on the site. 4 wells have been drilled to TD on the site, and have been equipped for production. |
2822434 | Primary Facility | 2019-01-04 | Routine/Complete Inspection | No Violations Noted | The well is properly identified, equipped for production, and is producing. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2642177 | 798042 | 2017-09-28 | 2018-03-08 | 78.54 | Environmental Health & Safety | The operator failed to control and dispose of fluids on site in a manner that prevents pollution. |
2642177 | 798043 | 2017-09-28 | 2018-03-08 | SWMA 301 | Environmental Health & Safety | The operator failed to dispose of industrial waste in a permitted manner. |
2673202 | 804505 | 2017-12-07 | 2018-03-08 | 78.66(a) | Environmental Health & Safety | Operator failed to report a frac fluid release to the well pad. |
2673202 | 804506 | 2017-12-07 | 2018-03-08 | OGA3218.2(A) | Environmental Health & Safety | Operator failed to maintain secondary containment during completion operations. |
2673202 | 804507 | 2017-12-07 | 2018-03-08 | 78.54 | Environmental Health & Safety | The operator failed to control and dispose of fluids on site in a manner that prevents pollution. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
798042 | 358273 | NOV - Notice of Violation | 2018-09-24 | ||||
798042 | 367710 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-09-24 | 2018-09-24 | $12,750.00 | $12,750.00 |
798043 | 358273 | NOV - Notice of Violation | 2018-09-24 | ||||
798043 | 367710 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-09-24 | 2018-09-24 | $12,750.00 | $12,750.00 |
804505 | 358273 | NOV - Notice of Violation | 2018-09-24 | ||||
804505 | 367710 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-09-24 | 2018-09-24 | $12,750.00 | $12,750.00 |
804506 | 358273 | NOV - Notice of Violation | 2018-09-24 | ||||
804506 | 367710 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-09-24 | 2018-09-24 | $12,750.00 | $12,750.00 |
804507 | 358273 | NOV - Notice of Violation | 2018-09-24 | ||||
804507 | 367710 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-09-24 | 2018-09-24 | $12,750.00 | $12,750.00 |
For data sources see[8]