Well ID: 37-059-26988
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Gray Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152172
Farm/Lease Name: GRECOE 17H
License Status:
Spud Date:
Permit Date: 2015-11-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.920306
Longitude: -80.380281

For data sources see[1][2][3]

Well History

Date Event
2015-11-09 New Permit Application
2015-11-17 Performed Spud Operation
2017-01-11 New Permit Application
2018-02-12 Permit Renewal Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 VANTAGE ENERGY APPALACHIA II LLC 0.00 0 0.00 0 0.00 0
2016 VANTAGE ENERGY APPALACHIA II LLC 0.00 0 0.00 0 0.00 0
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2019 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 VANTAGE ENERGY APPALACHIA II LLC Drill Cuttings 295.41 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 VANTAGE ENERGY APPALACHIA II LLC Drill Cuttings 543.45 Tons LANDFILL PAD059087072
2015 VANTAGE ENERGY APPALACHIA II LLC Drilling Fluid Waste 458.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Servicing Fluid 23.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 17.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 896.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 93.81 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 743.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 108.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 36.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 VANTAGE ENERGY APPALACHIA II LLC Synthetic Liner Materials 0.99 Tons LANDFILL 100663
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 4,039.55 Bbl REUSE (AT WELL PAD)
2017 VANTAGE ENERGY APPALACHIA II LLC Produced Fluid 345.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 VANTAGE ENERGY APPALACHIA II LLC Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 215.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 348.32 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 23.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 369.97 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2431490 Primary Facility 2015-11-18 Drilling/Alteration No Violations Noted Well spud on 11/17/2015. Operator drilled 30-inch borehole and set 26-inch conductor pipe at 40 ft. Operator cementing conductors in place
2432278 Primary Facility 2015-12-03 Drilling/Alteration No Violations Noted Northeast Rig #29. Operator drilling 22” borehole for 18 5/8” surface casing. Drilling ahead at 491’.
2442377 Primary Facility 2015-12-10 Drilling/Alteration No Violations Noted Northeast Rig #29. Surface casing (18 5/8”) set @ 511.96’ and cemented to surface on 12/4/2015. Coal Protective casing (13 3/8”) was set @ 1427.20’ and cemented to surface on 12/6/2015. Intermediate casing (9 5/8”) set @ 2728.30’ and cemented to surface on 12/10/2015. Review casing/cementing information.
2442383 Primary Facility 2015-12-28 Drilling/Alteration No Violations Noted Top hole portion of the well is complete. Surface, coal, and intermediate casings set and cemented to the surface. Borehole drilled to 6,962’ TMD / 6,931’ TVD on 12/13/2015. Borehole loaded with drilling mud.
2480011 Primary Facility 2016-03-30 Routine/Complete Inspection No Violations Noted Well is spud and drilled.
2508547 Primary Facility 2016-08-02 Routine/Complete Inspection No Violations Noted Well drilled. Well for hydrualic fracturing operations to begin.
2513505 Primary Facility 2016-08-24 Routine/Complete Inspection No Violations Noted Well drilled. Hydraulic fracturing operations on site.
2518412 Primary Facility 2016-09-06 Routine/Complete Inspection No Violations Noted Hydraulic Fracturing operations ongoing on site.