If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-059-26989 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.920292,"lon":-80.380231,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Greene | |
| Municipality: Gray Township | |
| Operator Name: RICE DRILLING B LLC | |
| Well Pad ID: 152172 | |
| Farm/Lease Name: GRECOE | |
| License Status: Active | |
| Spud Date: 2015-11-17 | |
| Permit Date: 2015-11-09 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 39.920292 | |
| Longitude: -80.380231 |
| Date | Event |
|---|---|
| 2015-11-09 | New Permit Application |
| 2015-11-17 | Performed Spud Operation |
| 2015-12-25 | Drilling Completion |
| 2016-06-30 | Drilling Completion |
| 2016-07-30 | Perforation |
| 2016-08-05 | Perforation |
| 2016-08-05 | Performed Stage 1 of Stimulation |
| 2016-08-05 | Performed Stage 2 of Stimulation |
| 2016-08-06 | Perforation |
| 2016-08-06 | Performed Stage 3 of Stimulation |
| 2016-08-07 | Perforation |
| 2016-08-07 | Performed Stage 4 of Stimulation |
| 2016-08-08 | Perforation |
| 2016-08-08 | Performed Stage 5 of Stimulation |
| 2016-08-09 | Perforation |
| 2016-08-09 | Performed Stage 6 of Stimulation |
| 2016-08-10 | Perforation |
| 2016-08-10 | Performed Stage 7 of Stimulation |
| 2016-08-26 | Perforation |
| 2016-08-26 | Performed Stage 8 of Stimulation |
| 2016-08-27 | Perforation |
| 2016-08-27 | Performed Stage 9 of Stimulation |
| 2016-08-28 | Perforation |
| 2016-08-28 | Performed Stage 10 of Stimulation |
| 2016-08-29 | Perforation |
| 2016-08-29 | Performed Stage 11 of Stimulation |
| 2016-08-30 | Perforation |
| 2016-08-30 | Performed Stage 12 of Stimulation |
| 2016-08-31 | Perforation |
| 2016-08-31 | Performed Stage 13 of Stimulation |
| 2016-09-01 | Perforation |
| 2016-09-01 | Performed Stage 14 of Stimulation |
| 2016-09-02 | Perforation |
| 2016-09-02 | Performed Stage 15 of Stimulation |
| 2016-09-09 | Perforation |
| 2016-09-09 | Performed Stage 16 of Stimulation |
| 2016-09-10 | Perforation |
| 2016-09-10 | Performed Stage 17 of Stimulation |
| 2016-09-12 | Perforation |
| 2016-09-12 | Performed Stage 18 of Stimulation |
| 2016-09-13 | Perforation |
| 2016-09-13 | Performed Stage 19 of Stimulation |
| 2016-09-15 | Perforation |
| 2016-09-15 | Performed Stage 20 of Stimulation |
| 2016-09-17 | Perforation |
| 2016-09-17 | Performed Stage 21 of Stimulation |
| 2016-09-18 | Perforation |
| 2016-09-18 | Performed Stage 22 of Stimulation |
| 2016-09-20 | Perforation |
| 2016-09-20 | Performed Stage 23 of Stimulation |
| 2016-09-21 | Perforation |
| 2016-09-21 | Performed Stage 24 of Stimulation |
| 2016-09-23 | Perforation |
| 2016-09-23 | Performed Stage 25 of Stimulation |
| 2016-09-24 | Performed Stage 26 of Stimulation |
| 2016-09-25 | Perforation |
| 2016-09-26 | Perforation |
| 2016-09-26 | Performed Stage 27 of Stimulation |
| 2016-09-27 | Performed Stage 28 of Stimulation |
| 2016-09-28 | Perforation |
| 2016-09-28 | Performed Stage 29 of Stimulation |
| 2016-09-29 | Perforation |
| 2016-09-29 | Performed Stage 30 of Stimulation |
| 2016-09-29 | Performed Stage 31 of Stimulation |
| 2016-09-29 | Performed Stage 32 of Stimulation |
| 2016-09-30 | Perforation |
| 2016-09-30 | Performed Stage 33 of Stimulation |
| 2016-09-30 | Performed Stage 34 of Stimulation |
| 2016-10-01 | Perforation |
| 2016-10-01 | Performed Stage 35 of Stimulation |
| 2016-10-02 | Perforation |
| 2016-10-02 | Performed Stage 36 of Stimulation |
| 2016-10-05 | Performed Stage 37 of Stimulation |
| 2016-10-06 | Perforation |
| 2016-10-06 | Performed Stage 38 of Stimulation |
| 2018-09-24 | Deviated |
| 2018-09-24 | Newly Drilled |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-08-05 | 2016-10-06 | 7,752 | 13,835,100 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | EC6486A Scale Inhibitor | NALCO | Scale Inhibitor | Amine Triphosphate | Proprietary | 20 | 0.00112837 | 1448.43 |
| Ethylene Glycol | 107-21-1 | 20 | 0.00112837 | 1448.43 | ||||
| 100 Mesh | Keane | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.80562 | 6,168,700.0 | |
| TXP-34 | Keane | Friction Reducer | Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.00139197 | 1786.8 | |
| Water | 7732-18-5 | 43 | 0.0299274 | 38416.2 | ||||
| Ammonium Chloride | 12125-02-9 | 0.9 | 0.000626388 | 804.059 | ||||
| Alcohols, C12-16, Ethoxylated | 68551-12-2 | 2 | 0.00139197 | 1786.8 | ||||
| Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 20 | 0.0139197 | 17868 | ||||
| Polyacrylamide | 69418-26-4 | 30 | 0.0208796 | 26802 | ||||
| Other Chemical(s) | Listed Above | See Trade Name(s) List | Ammonium Chloride | 12125-02-9 | 0.9 | 0.000626388 | 804.059 | |
| Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.00139197 | 1786.8 | ||||
| Propargly Alcohol | 107-19-7 | 1 | 0.00001463 | 18.776 | ||||
| Citric Acid | 77-92-9 | 30 | 0.000863011 | 1107.8 | ||||
| Alcohols, C12-16, Ethoxylated | 68551-12-2 | 2 | 0.00139197 | 1786.8 | ||||
| Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 20 | 0.0139197 | 17868 | ||||
| Ethylene Glycol | 107-21-1 | 20 | 0.00112837 | 1448.43 | ||||
| Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.00160708 | 2062.92 | ||||
| Polyacrylamide | 69418-26-4 | 30 | 0.0208796 | 26802 | ||||
| Potassium Iodide | 7681-11-0 | 5 | 0.00007314 | 93.881 | ||||
| Al-11 | Keane | Corrosion Inhibitor | Propargyl Alcohol Derivative | Proprietary | 60 | 0.000877638 | 1126.58 | |
| Propargly Alcohol | 107-19-7 | 1 | 0.00001463 | 18.776 | ||||
| Potassium Iodide | 7681-11-0 | 5 | 0.00007314 | 93.881 | ||||
| Water | Vantage | Carrier/ Base Fluid | Water | 7732-18-5 | 100 | 89.9423 | 115,454,000.0 | |
| FEAC-20 | Keane | Iron Control | Acetic Acid | 64-19-7 | 45 | 0.00129452 | 1661.7 | |
| Citric Acid | 77-92-9 | 30 | 0.000863011 | 1107.8 | ||||
| Bactron K-219 | NALCO | Biocide | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.00160708 | 2062.92 | |
| Methanol | 67-56-1 | 30 | 0.00482124 | 6188.75 | ||||
| 40/70 Mesh Sand | Keane | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.64914 | 5,967,840.0 | |
| 7.5% HCL | Keane | Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0380492 | 48841.7 |
For data sources see[5]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2016-08-05 | 1 | Mesh Sand | 10,875,921 | 8,660 | 3,690 |
| 2016-08-05 | 2 | Mesh Sand | 10,875,921 | 8,465 | 3,961 |
| 2016-08-06 | 3 | Mesh Sand | 10,875,921 | 8,781 | 4,169 |
| 2016-08-07 | 4 | Mesh Sand | 10,875,921 | 8,586 | 4,029 |
| 2016-08-08 | 5 | Mesh Sand | 10,875,921 | 8,843 | 4,179 |
| 2016-08-09 | 6 | Mesh Sand | 10,875,921 | 8,711 | 4,242 |
| 2016-08-10 | 7 | Mesh Sand | 10,875,921 | 8,889 | 4,340 |
| 2016-08-26 | 8 | Mesh Sand | 10,875,921 | 8,655 | 4,210 |
| 2016-08-27 | 9 | Mesh Sand | 10,875,921 | 9,027 | 4,301 |
| 2016-08-28 | 10 | Mesh Sand | 10,875,921 | 9,040 | 4,432 |
| 2016-08-29 | 11 | Mesh Sand | 10,875,921 | 8,884 | 4,509 |
| 2016-08-30 | 12 | Mesh Sand | 10,875,921 | 8,893 | 4,506 |
| 2016-08-31 | 13 | Mesh Sand | 10,875,921 | 8,836 | 4,431 |
| 2016-09-01 | 14 | Mesh Sand | 10,875,921 | 8,687 | 4,231 |
| 2016-09-02 | 15 | Mesh Sand | 10,875,921 | 8,355 | 4,450 |
| 2016-09-09 | 16 | Mesh Sand | 10,875,921 | 8,442 | 4,329 |
| 2016-09-10 | 17 | Mesh Sand | 10,875,921 | 8,518 | 4,332 |
| 2016-09-12 | 18 | Mesh Sand | 10,875,921 | 8,204 | 4,305 |
| 2016-09-13 | 19 | Mesh Sand | 10,875,921 | 8,390 | 4,539 |
| 2016-09-15 | 20 | Mesh Sand | 10,875,921 | 8,521 | 4,573 |
| 2016-09-17 | 21 | Mesh Sand | 10,875,921 | 8,401 | 4,333 |
| 2016-09-18 | 22 | Mesh Sand | 10,875,921 | 8,498 | 4,448 |
| 2016-09-20 | 23 | Mesh Sand | 10,875,921 | 9,044 | 4,336 |
| 2016-09-21 | 24 | Mesh Sand | 10,875,921 | 8,600 | 4,335 |
| 2016-09-23 | 25 | Mesh Sand | 10,875,921 | 8,459 | 9,151 |
| 2016-09-24 | 26 | Mesh Sand | 10,875,921 | 8,356 | 9,243 |
| 2016-09-26 | 27 | Mesh Sand | 10,875,921 | 8,090 | 9,253 |
| 2016-09-27 | 28 | Mesh Sand | 10,875,921 | 8,142 | 9,385 |
| 2016-09-28 | 29 | Mesh Sand | 10,875,921 | 8,188 | 9,249 |
| 2016-09-29 | 30 | Mesh Sand | 10,875,921 | 8,327 | 9,269 |
| 2016-09-29 | 31 | Mesh Sand | 10,875,921 | 8,348 | 9,114 |
| 2016-09-29 | 32 | Mesh Sand | 10,875,921 | 8,223 | 9,215 |
| 2016-09-30 | 33 | Mesh Sand | 10,875,921 | 8,086 | 9,240 |
| 2016-09-30 | 34 | Mesh Sand | 10,875,921 | 8,116 | 9,283 |
| 2016-10-01 | 35 | Mesh Sand | 10,875,921 | 8,008 | 9,107 |
| 2016-10-02 | 36 | Mesh Sand | 10,875,921 | 8,259 | 9,394 |
| 2016-10-05 | 37 | Mesh Sand | 10,875,921 | 6,765 | 9,486 |
| 2016-10-06 | 38 | Mesh Sand | 10,875,921 | 6,567 | 9,406 |
For data sources see[6]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2015 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | RICE DRILLING B LLC | 2,062,782.74 | 310 | 0.00 | 0 | 0.00 | 0 |
| 2018 | RICE DRILLING B LLC | 1,714,942.00 | 362 | 0.00 | 0 | 0.00 | 0 |
| 2019 | RICE DRILLING B LLC | 1,038,619.00 | 355 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 287.76 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
| 2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 508.20 Tons | LANDFILL | PAD059087072 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 1.49 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 610.37 Tons | LANDFILL | PAD059087072 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 35.81 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 427.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 1,295.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 9.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 633.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 501.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 3.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 13.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 0.58 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Waste Water Treatment Sludge | 1.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 311.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 1.19 Tons | LANDFILL | 100620 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 29.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 18.04 Tons | LANDFILL | 100172 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Servicing Fluid | 23.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 3.02 Tons | LANDFILL | 100172 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 9.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Servicing Fluid | 123.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 393.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
| 2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 10.81 Tons | LANDFILL | 100663 |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 345.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 1.76 Tons | LANDFILL | 100663 |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 67.93 Bbl | REUSE (AT WELL PAD) | |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 743.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 6,213.64 Bbl | REUSE (AT WELL PAD) | |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 8.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 2.66 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
| 2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 816.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018 | RICE DRILLING B LLC | Servicing Fluid | 54.95 Bbl | REUSE (AT WELL PAD) | |
| 2018 | RICE DRILLING B LLC | Produced Fluid | 506.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018 | RICE DRILLING B LLC | Produced Fluid | 29.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
| 2018 | RICE DRILLING B LLC | Produced Fluid | 58.20 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
| 2018 | RICE DRILLING B LLC | Servicing Fluid | 13.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 316.65 Bbl | REUSE (AT WELL PAD) | |
| 2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 92.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018 | RICE DRILLING B LLC | Produced Fluid | 28.84 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
| 2018 | RICE DRILLING B LLC | Servicing Fluid | 151.12 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
| 2018 | RICE DRILLING B LLC | Produced Fluid | 642.58 Bbl | REUSE (AT WELL PAD) | |
| 2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 23.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019 | RICE DRILLING B LLC | Produced Fluid | 49.82 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
| 2019 | RICE DRILLING B LLC | Produced Fluid | 489.24 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
| 2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 349.97 Bbl | REUSE (AT WELL PAD) | |
| 2019 | RICE DRILLING B LLC | Produced Fluid | 1,151.46 Bbl | REUSE (AT WELL PAD) | |
| 2019 | RICE DRILLING B LLC | Produced Fluid | 88.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
| 2019 | RICE DRILLING B LLC | Produced Fluid | 56.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019 | RICE DRILLING B LLC | Produced Fluid | 50.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2014-4 |
| 2019 | RICE DRILLING B LLC | Produced Fluid | 104.37 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[8]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2431459 | Primary Facility | 2015-11-18 | Drilling/Alteration | No Violations Noted | Well spud on 11/17/2015. Operator drilled 30-inch borehole and set 26-inch conductor pipe at 40 ft. Operator cementing conductors in place. |
| 2442375 | Primary Facility | 2015-12-17 | Drilling/Alteration | No Violations Noted | Northeast Rig #29. Surface casing (18 5/8”) set and cemented to the surface on 12/15/2015. Coal protective casing (13 3/8”) set and cemented to the surface on 12/17/2015. Operator nippling up BOP. |
| 2442376 | Primary Facility | 2015-12-28 | Drilling/Alteration | No Violations Noted | Top hole portion of the well is complete. Surface, coal, and intermediate casings set and cemented to the surface. Borehole drilled to 7,075’ TMD / 6,668’ TVD on 12/24/2015. Borehole loaded with drilling mud. |
| 2480014 | Primary Facility | 2016-03-30 | Routine/Complete Inspection | No Violations Noted | Well spud and drilled. |
| 2499479 | Primary Facility | 2016-07-07 | Drilling/Alteration | No Violations Noted | Drilling complete. Well drilled to 16,043’ TMD / 7,751’ TVD on 6/30/16. Production casing set @ 16,021’ and cemented on 7/2/2016. No cementing issues. |
| 2508548 | Primary Facility | 2016-08-02 | Routine/Complete Inspection | No Violations Noted | Well drilled. Well for hydrualic fracturing operations to begin. |
| 2513507 | Primary Facility | 2016-08-24 | Routine/Complete Inspection | No Violations Noted | Well drilled. Hydraulic fracturing operations on site. |
| 2518415 | Primary Facility | 2016-09-06 | Routine/Complete Inspection | No Violations Noted | Hydraulic Fracturing operations ongoing on site. |
| 2714361 | Primary Facility | 2018-04-04 | Routine/Complete Inspection | No Violations Noted | Unable to observe the well. The well is located below grade and covered by a steel plate and containment. The operator is currently drilling on site. The well is producing. Five 400 bbl production tanks are on site and equipped with containment. |
| 2822300 | Primary Facility | 2019-01-04 | Routine/Complete Inspection | No Violations Noted | The well is properly identified and is equipped for production. Casing annuli are equipped with vent pipe. |
For data sources see[9]