37-059-27443

Well Details

Well ID: 37-059-27443
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Whiteley Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 154362
Farm/Lease Name: MAC 11
License Status:
Spud Date:
Permit Date: 2017-09-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.827961
Longitude: -80.159044

For data sources see[1][2][3]

Well History

Date Event
2017-09-06 New Permit Application
2018-01-26 Performed Spud Operation
2018-04-05 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 RICE DRILLING B LLC 929,365.00 74 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 RICE DRILLING B LLC Drill Cuttings 820.55 Tons LANDFILL 100172
2018 RICE DRILLING B LLC Drill Cuttings 161.99 Tons LANDFILL 100663
2018 RICE DRILLING B LLC Drilling Fluid Waste 820.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 110.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 3.27 Tons LANDFILL 100663
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 101.13 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 33.37 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Drill Cuttings 0.75 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 RICE DRILLING B LLC Produced Fluid 15,531.24 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 22.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Drill Cuttings 166.68 Tons LANDFILL 06-08438
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 10.05 Tons LANDFILL 100172
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 100.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 156.52 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Produced Fluid 60.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Drill Cuttings 948.42 Tons LANDFILL 100277
2019 RICE DRILLING B LLC Produced Fluid 6.66 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 20.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Produced Fluid 1,783.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 344.09 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Servicing Fluid 66.95 Tons RESIDUAL WASTE PROCESSING FACILITY

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2653592 Primary Facility 2017-10-03 Routine/Partial Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The purpose of the inspection was to discuss redline changes to the site. Rice requested Department approval to shift BMPs toward the LOD to allow PCSM to be built during the initial construction phase to limit future earth disturbance. The redline changes were approved.
2667005 Primary Facility 2017-11-28 Compliance Evaluation No Violations Noted The Act 9 sign was in place and all required documents were present at the site. A large portion of the site was temporarily stabilized. An NOV was previously issued in response to a BMP failure that caused sediment to leave the LOD and enter waters of the Commonwealth. Repairs had been made to the BMPs and there was no sediment leaving the site. There were no violations observed at the time of inspection.
2688367 Primary Facility 2018-01-30 Drilling/Alteration No Violations Noted CellarTech cellar being installed before 26" conductor set at 40'.
2712336 Primary Facility 2018-03-23 Routine/Partial Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The land owner requested EQT add a culvert in an access road diversion channel and gravel in the adjacent area to allow better access to their property with farm equipment. Due to the addition of impervious area, it was recommended to EQT that they contact Department engineering staff. Redline approval was not granted.

During the inspection EQT informed the Department a slip had occurred upslope of the rain garden on the north side of the site. The slip material was contained in the rain garden. No slip material left the LOD.

There were no violations observed at the time of inspection.

2742964 Primary Facility 2018-06-19 Drilling/Alteration No Violations Noted Well has been spud. Well and well cellar covered by containment. Falcon Rig 25 currently drilling 059-27442.
2750276 Primary Facility 2018-07-10 Drilling/Alteration No Violations Noted Top hole portion of the well has been completed. Surface, coal, and intermediate casings have been set and cemented. Operator currently drilling well 059-27444.