X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-27446

Well Details

Well ID: 37-059-27446
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Springhill Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152251
Farm/Lease Name: FRANKLIN DENNY
License Status:
Spud Date:
Permit Date: 2017-09-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.7388
Longitude: -80.503397

For data sources see[1][2][3]

Well History

Date Event
2017-09-20 New Permit Application
2018-09-20 MOD
2019-08-22 MOD

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2632685 Primary Facility 2017-08-08 Routine/Complete Inspection No Violations Noted On August 8, 2017, the Department performed an inspection of the Rice Energy Franklin Denny well pad site. The site is located in Springhill Twp., Greene Co. The inspection was a routine inspection during construction of the newly permitted access road and PCSM structures.

The well pad construction has been completed for several years, but no wells have been drilled at the site. The operator has re permitted the site as an ESCGP2 permit and has relocated the access road. The operator plans to finish construction of the infiltration berms and wet pond and then plans to begin drilling activity.

7 wells have been permitted for the site, but none have been drilled.

2658189 Primary Facility 2017-10-23 Routine/Complete Inspection No Violations Noted On October 23, 2017, the Department performed an inspection of the Rice Energy Franklin Denny well pad site. Present at time of inspection was Justin Blanc (Rice). The site is located in Springhill Twp., Greene Co. The inspection was a inspection of the site prior to drilling operations because of a request by the operator for a pre-operational inspection.

The well pad construction has been completed for several years, but no wells have been drilled at the site. The operator has re permitted the site as an ESCGP2 permit and has relocated the access road.

The operator has completed installation of all E&S controls and PCSM structures. The well pad final grading and stoning has been completed. The operator has completed construction of the access road and PCSMs along the access road. The operator has temporarily stabilized the well pad and stockpile slopes with hydro seeding and slope armoring. The operator has increased the size of the excess material stockpile, and installed an armored collection chan

For data sources see[5]

References