If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-27477 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.789272,"lon":-80.481214,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Springhill Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 144706 | |
Farm/Lease Name: WILLIAM LANE 10 | |
License Status: Inactive | |
Spud Date: 2017-12-21 | |
Permit Date: 2017-10-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.789272 | |
Longitude: -80.481214 |
Date | Event |
---|---|
Newly Drilled | |
2017-10-11 | New Permit Application |
2017-12-21 | Performed Spud Operation |
2018-02-08 | Drilling Completion |
2018-03-13 | MOD |
2019-01-22 | Inactive Well Request Granted |
2019-03-28 | MOD |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | RICE DRILLING B LLC | Drill Cuttings | 4.39 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 12.86 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 1.25 Tons | LANDFILL | 100277 |
2017 | RICE DRILLING B LLC | Produced Fluid | 7.14 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 29.29 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Drill Cuttings | 851.28 Tons | LANDFILL | 100172 |
2018 | RICE DRILLING B LLC | Produced Fluid | 220.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Drill Cuttings | 15.51 Tons | LANDFILL | 100663 |
2018 | RICE DRILLING B LLC | Drilling Fluid Waste | 43.33 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 139.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 169.39 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 6.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | RICE DRILLING B LLC | Produced Fluid | 102.31 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2019 | RICE DRILLING B LLC | Drilling Fluid Waste | 50.00 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 97.14 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Drill Cuttings | 765.35 Tons | LANDFILL | 100419 |
2019 | RICE DRILLING B LLC | Drill Cuttings | 173.62 Tons | LANDFILL | 100172 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 21.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 2.40 Tons | LANDFILL | 100419 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | RICE DRILLING B LLC | Produced Fluid | 8.98 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | RICE DRILLING B LLC | Produced Fluid | 12.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 13.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 252.92 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2675241 | Primary Facility | 2017-12-26 | Drilling/Alteration | No Violations Noted | Well was spud on 12/21/17. Operator drilled a 30" hole to 40'. Operator set and cemented a 26" conductor at 40'. Well cellar in place. |
2680522 | Primary Facility | 2018-01-09 | Drilling/Alteration | No Violations Noted | Operator drilled borehole to 63'. (KB). Rig off of the well.
KB 13.5' |
2700298 | Primary Facility | 2018-02-28 | Drilling/Alteration | No Violations Noted | Surface, coal, and intermediate casings have been set and cemented to the surface. Pilot hole drilled to 6,290' KB. The well is capped. Operator currently drilling 059-27474. |
2829144 | Primary Facility | 2019-01-18 | Drilling/Alteration | No Violations Noted | The well has not been drilled to permitted total depth. Surface, coal, and intermediate casings have been set and cemented, and a pilot hole has been drilled. The well is capped and is in a well cellar covered with a steel grate. |
For data sources see[7]