37-059-27514

Well Details

Well ID: 37-059-27514
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Jackson Township
Operator Name: EQT PROD CO
Well Pad ID: 154155
Farm/Lease Name: STATE GAME LANDS 179 NFR60H32
License Status:
Spud Date:
Permit Date: 2017-10-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.815247
Longitude: -80.402222

For data sources see[1][2][3]

Well History

Date Event
2017-10-19 New Permit Application
2017-10-31 Performed Spud Operation
2018-10-15 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2019 EQT PROD CO 415,380.00 43 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EQT PROD CO Drill Cuttings 247.55 Tons LANDFILL 100172
2017 EQT PROD CO Other Oil & Gas Wastes 13.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drill Cuttings 225.67 Tons LANDFILL 100663
2017 EQT PROD CO Drill Cuttings 93.79 Tons LANDFILL 100419
2018 EQT PROD CO Drill Cuttings 515.59 Tons LANDFILL 100172
2018 EQT PROD CO Drill Cuttings 304.54 Tons LANDFILL 100663
2018 EQT PROD CO Drilling Fluid Waste 130.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 77.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 65.50 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 23.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Other Oil & Gas Wastes 1.19 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 EQT PROD CO Produced Fluid 34.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 74.68 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 EQT PROD CO Produced Fluid 39.10 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 14.65 Bbl INJECTION DISPOSAL WELL 34-167-28462
2019 EQT PROD CO Other Oil & Gas Wastes 19.82 Tons LANDFILL 100172
2019 EQT PROD CO Other Oil & Gas Wastes 61.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 7.50 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Produced Fluid 0.69 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 EQT PROD CO Other Oil & Gas Wastes 7.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Waste Water Treatment Sludge 8.69 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 EQT PROD CO Other Oil & Gas Wastes 3.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Produced Fluid 185.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Synthetic Liner Materials 2.08 Tons LANDFILL 100172
2019 EQT PROD CO Other Oil & Gas Wastes 151.43 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 506.45 Bbl SURFACE IMPOUNDMENT 95-7-37312-19

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2632627 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted On August 2, 2017, the Department performed an inspection of the EQT State Gamelands 179 well pad site. Present at time of inspection was Bill Balog (EQT), Will Brogan and Mike Stephan (DEP). The site is located in Aleppo and Jackson Twps., Greene Co. The inspection was a follow up inspection of the site after noted violations on July 31, 2017.

The operator was in process of repairing E&S BMPs which were damaged and failed during a recent heavy rainfall event. The operator has agreed to repair the stream crossing for Reinhart Rd. In Jackson Twp. The operator will apply for necessary Emergency 105 permit to perform repairs to the stream crossing and to remediate impacts to an unnamed trib. to Job Creek from sediment discharges associated with E&S BMPs failure on site after the recent rainfall event. The remediation will be performed by hand as much as possible.

13 wells have been permitted for the site. Site under construction. No wells have been drilled at time of inspection.

2636863 Primary Facility 2017-09-07 Routine/Complete Inspection No Violations Noted On September 7, 2017, the Department performed an inspection of the EQT State Gamelands 179 well pad site. Presnt at ime of inspection was Rex Nelson (EQT). The site is located in Aleppo and Jackson Twps., Greene Co. The inspection was a routine inspection after notification by the operator of E&S failures on site after a recent rainfall event.

The operator has repaired E&S BMPs which were damaged and failed during a heavy rainfall event. The operator reported a rainfall of 1 1/2" during a 1 hour timeframe on September 5, 2017. During the September 6, 2017 E&S inspection the operator noted failures along the silt sock down gradient from the excess material stockpiles. The operator has stabilized the site with armor guard hydro seed as areas of construction are complete. The erosion prevention seeding did not perform as expected and sediment laden water over toped the silt sock discharging small amount of sediment approximately 20' outside the LOD. The operator has contacted the seeding company to reappl

2651410 Primary Facility 2017-10-05 Preoperation Inspection No Violations Noted On October 5, 2017, the Department performed an inspection of the EQT State Gamelands 179 well pad site. Presnt at ime of inspection was Rex Nelson (EQT). The site is located in Aleppo and Jackson Twps., Greene Co. The inspection was a inspection after a request by the operator for a pre-operational inspection.

The operator has completed installation of all E&S controls. The well pad final grading and stoning is being completed. The operator has completed construction of the access road and PCSMs along the access road. The construction of the well pad PCSMs (wet pond) is almost complete. The operator has temporarily stabilized the well pad and stockpile slopes with hydro seeding and slope armoring.

13 wells have been permitted to be drilled on site. None of the wells have been drilled at time of inspection.

2656487 Primary Facility 2017-11-02 Drilling/Alteration No Violations Noted Conductor set @ 40'. Setting Cellar Tech after conductor are in.
2675017 Primary Facility 2017-12-05 Drilling/Alteration No Violations Noted Setting Water/Coal Protection Casing and cementing tonight (12/3 /2017).job went as planned.Cement to surface.
2682519 Primary Facility 2018-01-11 Drilling/Alteration No Violations Noted Surface, coal, and intermediate casings have been set and cemented to the surface. Operator drilling ahead at 6,917'. Conducted site walk. Observed minor containment issues. Operator is currently removing water from containment. Notified operator of findings.

For data sources see[7]