If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-00115 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.530843,"lon":-79.374925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Conemaugh Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: T M GUIHER 87A 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.530843 | |
Longitude: -79.374925 |
Date | Event |
---|---|
1949-06-20 | Drilling Completion |
1986-06-25 | OLD WELL |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | PEOPLES TWP LLC | 2293.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1992 | PEOPLES TWP LLC | 2679.00 | 366 | 0.00 | 0 | 0.00 | 0 |
1993 | PEOPLES TWP LLC | 2775.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1994 | PEOPLES TWP LLC | 2807.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1995 | PEOPLES TWP LLC | 2655.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1996 | PEOPLES TWP LLC | 1936 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | PEOPLES TWP LLC | 1931 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | 2960 | 251 | 0.00 | 0 | 0.00 | 0 | |
1999 | PEOPLES TWP LLC | 1930 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | CONSOL GAS CO | 3579 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | PEOPLES TWP LLC | 1931 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | PEOPLES TWP LLC | 1931 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | PEOPLES TWP LLC | 1448 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | PEOPLES TWP LLC | 1448 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | PEOPLES TWP LLC | 965 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | TW PHILLIPS GAS SUPPLY CORP | 632.00 | 243 | 0.00 | 0 | 0.00 | 0 |
2007 | TW PHILLIPS GAS SUPPLY CORP | 1653.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | TW PHILLIPS GAS SUPPLY CORP | 56.00 | 58 | 0.00 | 0 | 0.00 | 0 |
2010 | TW PHILLIPS GAS SUPPLY CORP | 40.00 | 53 | 0.00 | 0 | 0.00 | 0 |
2011 | TW PHILLIPS GAS SUPPLY CORP | 155.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 1,212.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 1,153.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 1,548.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 2,296.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 772.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 481.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,519.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2480588 | Primary Facility | 2016-04-26 | Routine/Partial Inspection | In Compliance with Policy | On-site meeting as requested by Operator representative Kenny Radzieta to review E&S plans for the transfer of a gathering pipeline. XTO representative Gordon Bish and Mountain Gathering representative Jerry also present.
According to Mr. Radzieta, PENNDOT is replacing a bridge where XTO’s gathering pipeline is installed under the stream that this bridge crosses. In order for the bridge replacement to be completed, the gathering pipeline must be removed. The Operator is planning to replace this gathering pipeline a short distance from its former location and intends to underground bore for the pipeline installation. The gathering pipeline is to be installed under an agricultural field. Mr. Radzieta inquired as to whether a temporary road is necessary for the work required for this project. As the Operator has hired a consultant to develop an E&S plan for this project, the Department recommended that the Operator implement the E&S plan as outlined in accordance with current regulations. The representatives |
2563245 | Primary Facility | 2017-02-07 | Routine/Complete Inspection | In Compliance with Policy | On-site meeting as requested by Operator representative Marc Maestra to review E&S plans for the transfer of a gathering pipeline. Operator representative Mike Purdom and Department WQSS April Weiland also present.
Per Mr. Purdom, the Operator intends to underground bore for the installation of the new pipeline. The gathering pipeline is to be installed under an agricultural field and one stream. The bore is to occur 30 feet under the stream. The Department reviewed the E&S plan for the project. The Department recommends that additional temporary E&S BMPs are installed as necessary in order to prevent any potential pollution events from occurring. The Operator shall install the temporary E&S BMPs prior to conducting any earth disturbance. The Operator anticipates commencing this pipeline bore within the week and will notify the Department prior to doing so. Operator appears to be in compliance with current policy at this time. |
2563309 | Primary Facility | 2017-02-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection, operations for underground bore in process. Operator representative Mike Purdom and contractors on-site.
E&S plan on-site. Temporary E&S BMPs appear to be installed in accordance with E&S plan. No accelerated erosion and/or sedimentation issues observed during this inspection. Per Mr. Purdom: Boring operations commenced yesterday (2/14/17). At this time, the bore is on the threshold of crossing underneath the stream. There have been no issues with the bore to date. Mr. Purdom will notify the Department of any issues and/or concerns that may arise with this project and will notify the Department when boring operations have been completed. WQSS A. Weiland present during inspection. |
For data sources see[6]