If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-25346 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.46447,"lon":-79.063143,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: East Wheatfield Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: JOSEPH D GEORGE ET UX ET AL 1 | |
License Status: ACTIVE | |
Spud Date: 1980-02-11 | |
Permit Date: 1980-02-05 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.464470 | |
Longitude: -79.063143 |
Date | Event |
---|---|
1980-02-05 | New Permit Application |
1980-02-11 | Performed Spud Operation |
1980-02-16 | Drilling Completion |
1980-02-26 | Perforation |
1980-03-18 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | PHILLIPS EXPLORATION INC | 3210.00 | 225 | 0.00 | 0 | 0.00 | 0 |
1993 | PHILLIPS EXPLORATION INC | 1559.00 | 168 | 0.00 | 0 | 0.00 | 0 |
1994 | PHILLIPS EXPLORATION INC | 1828.00 | 170 | 0.00 | 0 | 0.00 | 0 |
1995 | PHILLIPS EXPLORATION INC | 1000.00 | 57 | 0.00 | 0 | 0.00 | 0 |
1996 | PHILLIPS EXPLORATION INC | 3285 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | PHILLIPS EXPLORATION INC | 553 | 56 | 0.00 | 0 | 0.00 | 0 |
1998 | PHILLIPS EXPLORATION INC | 1653 | 333 | 0.00 | 0 | 0.00 | 0 |
1999 | PHILLIPS EXPLORATION INC | 1223 | 361 | 0.00 | 0 | 0.00 | 0 |
2000 | PHILLIPS EXPLORATION INC | 811 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | PHILLIPS EXPLORATION INC | 609 | 317 | 0.00 | 0 | 0.00 | 0 |
2002 | PHILLIPS EXPLORATION INC | 1121 | 363 | 0.00 | 0 | 0.00 | 0 |
2003 | PHILLIPS EXPLORATION INC | 700 | 365 | 0 | 365 | 0.00 | 0 |
2004 | PHILLIPS EXPLORATION INC | 855 | 366 | 0.00 | 0 | 0.00 | 0 |
2005 | PHILLIPS EXPLORATION INC | 537 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | PHILLIPS EXPLORATION INC | 480.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | PHILLIPS EXPLORATION INC | 817.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PHILLIPS EXPLORATION INC | 587.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 568.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 406.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 466.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 584.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 549.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 499.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 619.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 578.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 394.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 451.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
1999 | PHILLIPS EXPLORATION INC | Brine | 15.00 Bbl | Brine or Industrial Waste Treatment Plt | SEE END |
2003 | PHILLIPS EXPLORATION INC | Brine | 0.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2015 | XTO ENERGY INC | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1896762 | Primary Facility | 2010-06-30 | Routine/Complete Inspection | No Violations Noted | According to records, operator completed the well on 2/16/80 to depth of 3729 ft. Well head consisted of 8¿ pipe to 4¿ to 2¿ production pipe with shut off valves. Production equipment consisted of separator (25 psi); and 100 bbl brine tank (with 40 bbl fluid). At the time of inspection, no IW and E&S issues at the site. No sign of gas leakage around pipe fitting at well head was noted. |
2486906 | Primary Facility | 2016-05-23 | Routine/Complete Inspection | Violation(s) Noted | At time of inspection Department observed water flowing across access road before reaching well site. Water is creating erosion gullies on access road. Culvert pipe under access road appears to be unmaintained.
No E&S issue observed on site. Well label present. Brine tank appears structurally sound. Well appears equipped for production. UPDATE 5-24-16: Department contacted Operator Rep Jason Canose by phone. Mr. Canose stated he would check out the access road and address any issues. Violation being issued for failure to maintain E&S BMP's. |
2492960 | Primary Facility | 2016-06-09 | Compliance Evaluation | No Violations Noted | Admin inspection to inspection record #2486906 where violation was issued for failure to maintain E&S BMP's.
Department received NOV 15 day response from Operator. Response letter states that Operator is evaluating the current issues with the culvert pipe and will install any necessary erosion controls. Letter also states that E&S plans are being developed and once all documentation and permits are approved construction will begin to repair access road. A follow up inspection will be conducted at a later date. Operator is In Compliance with Policy at this time. UPDATE 9-7-16: Inspection result changed from ICP to NOVIO. |
2539840 | Primary Facility | 2016-09-20 | Follow-up Inspection | No Violations Noted | Follow up inspection to inspection record #2486906 where violation issued for failure to maintain E&S BMP's. Violation was closed: Operator In Compliance with Policy on 6-9-16.
At time of inspection it appears access road culvert pipe remains unmaintained. Both sides of access road becoming eroded and washed away preventing vehicle access to well site. Water level on west side of access road is low. Water is not running over access road at this time and it does not appear that water is running through culvert pipe. At this time it appears that excavation work to fix the access road has not begun. Department attempted to contact Operator Rep Jason Canose by phone from site. Department left a message requesting a call back. A follow up inspection will be conducted at a later date. |
2540854 | Primary Facility | 2016-11-30 | Administrative/File Review | No Violations Noted | Admin inspection to inspection record #2486906.
Department records indicate that a GP-11 submitted by Operator was issued on 10-18-16. Please notifiy Department at address below to provide tentative schedule of earth disturbance related to this permit. A follow up inspection will be conducted at a later date. |
2549579 | Primary Facility | 2017-01-04 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection to inspection record #2486906.
E&S plan, GP-11, and Water ID and Delineation Report on site. At time of inspection it appears culvert pipe has been replaced. Disturbed area of access road rocked, no E&S issues observed. Temporary BMP's have been installed along access road and appear adequate. Area within LOD outlined in E&S plan appears temporarily stabilized. Department recommends Operator remove temporary BMP's once permanent stabilization has been achieved. A follow up inspection will be conducted at a later date. |
2589490 | Primary Facility | 2017-05-03 | Routine/Partial Inspection | No Violations Noted | RTPT inspection to inspection record #2486906. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2486906 | 759998 | 2016-05-23 | 2016-06-09 | 102.11(a)1 | Environmental Health & Safety | CEI inspection conducted on 6-9-16; inspection result of NOVIO due to Operator submitting a GP-11. eFACTS violation resolution reason: ICS
RTPT inspection conducted on 1-4-17; inspection result of NOVIO due to site inspection indicating culvert has been replaced. eFACTS violation resolution reason: |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
759998 | 343247 | NOV - Notice of Violation | 2016-06-09 |
For data sources see[7]