If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-063-30915 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.474354,"lon":-79.415013,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Indiana | |
| Municipality: Conemaugh Township | |
| Operator Name: ALLIANCE PETRO CO LLC | |
| Well Pad ID: | |
| Farm/Lease Name: MARK YANOSKI ETAL FM E. S. GOLDSMITH 5 | |
| License Status: ACTIVE | |
| Spud Date: 1995-10-16 | |
| Permit Date: 1994-06-09 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.474354 | |
| Longitude: -79.415013 |
| Date | Event |
|---|---|
| 1994-06-09 | Permit Renewal Application |
| 1995-10-16 | Performed Spud Operation |
| 1995-10-20 | Drilling Completion |
| 1995-11-06 | Perforation |
| 1996-03-25 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 1996 | PHILLIPS EXPLORATION INC | 8916 | 365 | 0.00 | 0 | 0.00 | 0 |
| 1997 | PHILLIPS EXPLORATION INC | 4721 | 60 | 0.00 | 0 | 0.00 | 0 |
| 1998 | PHILLIPS EXPLORATION INC | 549.00 | 6 | 0.00 | 0 | 0.00 | 0 |
| 1999 | PHILLIPS EXPLORATION INC | 10018 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2000 | PHILLIPS EXPLORATION INC | 10,026.00 | 178 | 0.00 | 0 | 0.00 | 0 |
| 2001 | PHILLIPS EXPLORATION INC | 6612 | 156 | 0.00 | 0 | 0.00 | 0 |
| 2002 | PHILLIPS EXPLORATION INC | 3244 | 64 | 0.00 | 0 | 0.00 | 0 |
| 2003 | PHILLIPS EXPLORATION INC | 10187 | 254 | 0 | 254 | 0.00 | 0 |
| 2004 | PHILLIPS EXPLORATION INC | 9655 | 302 | 0.00 | 0 | 0.00 | 0 |
| 2005 | PHILLIPS EXPLORATION INC | 8,435.00 | 305 | 0.00 | 0 | 0.00 | 0 |
| 2006 | PHILLIPS EXPLORATION INC | 10,583.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2007 | PHILLIPS EXPLORATION INC | 7689.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2008 | PHILLIPS EXPLORATION INC | 7253.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2009 | PHILLIPS EXPLORATION INC | 6570.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | PHILLIPS EXPLORATION INC | 5,730.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | PHILLIPS EXPLORATION INC | 5,110.00 | 364 | 0.00 | 0 | 0.00 | 0 |
| 2012 | XTO ENERGY INC | 5,349.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2013 | XTO ENERGY INC | 4,843.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | XTO ENERGY INC | 5,579.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | XTO ENERGY INC | 4,330.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | XTO ENERGY INC | 4,167.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | ALLIANCE PETRO CO LLC | 2,322.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2018 | ALLIANCE PETRO CO LLC | 4,280.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | ALLIANCE PETRO CO LLC | 3,677.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2003 | PHILLIPS EXPLORATION INC | Brine | 0.00 Bbl | Brine or Industrial Waste Treatment Plt |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1870203 | Primary Facility | 2010-03-10 | Routine/Complete Inspection | No Violations Noted | According to records, operator completed the well on 10/20/95 to depth of 3897ft. WRAC submitted on 11/28/95. Well head consisted of 8¿ pipe to 4¿ to 2¿ production pipe with shut off valves. Production equipment consisted of separator; totalize meter (4960 MCF) and 100 bbl brine tank (with < 10 bbl fluid). At the time of inspection, no IW and E&S issues at the site. Slight odor of gas leakage around pipe fitting at well head was noted. |
| 573154 | Primary Facility | 1996-07-31 | Site Restoration | Violation(s) Noted | INADEQUATE SITE RESTORATION |
| 573560 | Primary Facility | 1996-10-09 | Site Restoration | No Violations Noted | SITE RESTORED; TANK |
| Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
|---|---|---|---|---|---|---|
| 573154 | 107615 | 07/31/1996 | 1996-07-31 | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | Environmental Health & Safety | INADEQUATE SITE RSTR |
| Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
|---|---|---|---|---|---|---|---|
| 107615 | 9104 | NOV - Notice of Violation | Comply/Closed | 1996-10-09 |
For data sources see[7]