If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-30915 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.474354,"lon":-79.415013,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Conemaugh Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: MARK YANOSKI ETAL FM E. S. GOLDSMITH 5 | |
License Status: ACTIVE | |
Spud Date: 1995-10-16 | |
Permit Date: 1994-06-09 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.474354 | |
Longitude: -79.415013 |
Date | Event |
---|---|
1994-06-09 | Permit Renewal Application |
1995-10-16 | Performed Spud Operation |
1995-10-20 | Drilling Completion |
1995-11-06 | Perforation |
1996-03-25 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1996 | PHILLIPS EXPLORATION INC | 8916 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | PHILLIPS EXPLORATION INC | 4721 | 60 | 0.00 | 0 | 0.00 | 0 |
1998 | PHILLIPS EXPLORATION INC | 549.00 | 6 | 0.00 | 0 | 0.00 | 0 |
1999 | PHILLIPS EXPLORATION INC | 10018 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | PHILLIPS EXPLORATION INC | 10,026.00 | 178 | 0.00 | 0 | 0.00 | 0 |
2001 | PHILLIPS EXPLORATION INC | 6612 | 156 | 0.00 | 0 | 0.00 | 0 |
2002 | PHILLIPS EXPLORATION INC | 3244 | 64 | 0.00 | 0 | 0.00 | 0 |
2003 | PHILLIPS EXPLORATION INC | 10187 | 254 | 0 | 254 | 0.00 | 0 |
2004 | PHILLIPS EXPLORATION INC | 9655 | 302 | 0.00 | 0 | 0.00 | 0 |
2005 | PHILLIPS EXPLORATION INC | 8,435.00 | 305 | 0.00 | 0 | 0.00 | 0 |
2006 | PHILLIPS EXPLORATION INC | 10,583.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | PHILLIPS EXPLORATION INC | 7689.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PHILLIPS EXPLORATION INC | 7253.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 6570.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 5,730.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 5,110.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 5,349.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 4,843.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 5,579.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 4,330.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 4,167.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 2,322.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 4,280.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 3,677.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2003 | PHILLIPS EXPLORATION INC | Brine | 0.00 Bbl | Brine or Industrial Waste Treatment Plt |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1870203 | Primary Facility | 2010-03-10 | Routine/Complete Inspection | No Violations Noted | According to records, operator completed the well on 10/20/95 to depth of 3897ft. WRAC submitted on 11/28/95. Well head consisted of 8¿ pipe to 4¿ to 2¿ production pipe with shut off valves. Production equipment consisted of separator; totalize meter (4960 MCF) and 100 bbl brine tank (with < 10 bbl fluid). At the time of inspection, no IW and E&S issues at the site. Slight odor of gas leakage around pipe fitting at well head was noted. |
573154 | Primary Facility | 1996-07-31 | Site Restoration | Violation(s) Noted | INADEQUATE SITE RESTORATION |
573560 | Primary Facility | 1996-10-09 | Site Restoration | No Violations Noted | SITE RESTORED; TANK |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
573154 | 107615 | 07/31/1996 | 1996-07-31 | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | Environmental Health & Safety | INADEQUATE SITE RSTR |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
107615 | 9104 | NOV - Notice of Violation | Comply/Closed | 1996-10-09 |
For data sources see[7]