If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-32747 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.876883,"lon":-79.092201,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: North Mahoning Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: J MURRAY BAUN 4 | |
License Status: ACTIVE | |
Spud Date: 2001-08-14 | |
Permit Date: 2001-03-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.876883 | |
Longitude: -79.092201 |
Date | Event |
---|---|
2001-03-27 | New Permit Application |
2001-08-13 | Performed Spud Operation |
2001-08-23 | Drilling Completion |
2001-08-30 | Perforation |
2001-10-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2001 | PHILLIPS EXPLORATION INC | 9745 | 47 | 0.00 | 0 | 0.00 | 0 |
2002 | PHILLIPS EXPLORATION INC | 60405 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | PHILLIPS EXPLORATION INC | 48546 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | PHILLIPS EXPLORATION INC | 37213 | 366 | 0.00 | 0 | 0.00 | 0 |
2005 | PHILLIPS EXPLORATION INC | 29975 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | PHILLIPS EXPLORATION INC | 23,486.00 | 325 | 0.00 | 0 | 0.00 | 0 |
2007 | PHILLIPS EXPLORATION INC | 20687.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PHILLIPS EXPLORATION INC | 14984.00 | 298 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 15140.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 12,373.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 11,117.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 10,000.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 8,720.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 8,235.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 7,318.40 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 6,562.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 4,422.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 6,505.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 5,793.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2002 | PHILLIPS EXPLORATION INC | Brine | 75.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2003 | PHILLIPS EXPLORATION INC | Brine | 20.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2005 | PHILLIPS EXPLORATION INC | Brine | 55.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1053671 | Primary Facility | 2001-08-15 | Drilling/Alteration | No Violations Noted | LK Drilling Corp. drilling 12 1/4 hole with air and fresh water @ 300'. Pit,E&S & notification OK. Spoke to operator representative Gary Clark relevant to concerns of posted drilling procedures. Gary advised that storage interval would be drilled on fluid. Within 2000' of alabran storage. 1000' + |
2484808 | Primary Facility | 2016-05-16 | Routine/Complete Inspection | No Violations Noted | 5/16/2016 - Annulus open, produced fluids tank. |
For data sources see[7]