X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-34307

Well Details

Well ID: 37-063-34307
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: WILLIAM MCINTIRE COAL OIL & GAS
Well Pad ID:
Farm/Lease Name: PENROSE 1
License Status: ACTIVE
Spud Date: 2006-03-30
Permit Date: 2005-06-17
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.470129
Longitude: -79.100672

For data sources see[1][2][3]

Well History

Date Event
2005-06-17 New Permit Application
2006-03-30 Performed Spud Operation
2006-04-04 Drilling Completion
2006-04-26 Perforation
2007-08-23 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 WILLIAM MCINTIRE COAL OIL & GAS 2,296.00 77 0.00 0 0.00 0
2007 WILLIAM MCINTIRE COAL OIL & GAS 5748.00 365 0.00 0 0.00 0
2008 WILLIAM MCINTIRE COAL OIL & GAS 10160.00 290 0.00 0 0.00 0
2009 WILLIAM MCINTIRE COAL OIL & GAS 8323.00 320 0.00 0 0.00 0
2010 WILLIAM MCINTIRE COAL OIL & GAS 2,864.00 129 0.00 0 0.00 0
2011 WILLIAM MCINTIRE COAL OIL & GAS 2,938.00 131 0.00 0 0.00 0
2012 WILLIAM MCINTIRE COAL OIL & GAS 1,548.00 131 0.00 0 0.00 0
2013 WILLIAM MCINTIRE COAL OIL & GAS 2,199.95 247 0.00 0 0.00 0
2014 WILLIAM MCINTIRE COAL OIL & GAS 3,541.00 213 0.00 0 0.00 0
2015 WILLIAM MCINTIRE COAL OIL & GAS 6,066.00 161 0.00 0 0.00 0
2016 WILLIAM MCINTIRE COAL OIL & GAS 1,171.00 79 0.00 0 0.00 0
2017 WILLIAM MCINTIRE COAL OIL & GAS 623.00 60 0.00 0 0.00 0
2018 WILLIAM MCINTIRE COAL OIL & GAS 869.00 32 0.00 0 0.00 0
2019 WILLIAM MCINTIRE COAL OIL & GAS 1,058.00 58 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 WILLIAM MCINTIRE COAL OIL & GAS Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2008 WILLIAM MCINTIRE COAL OIL & GAS Brine 175.00 Bbl Reuse other than road spreading
2008 WILLIAM MCINTIRE COAL OIL & GAS Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0026034
2009 WILLIAM MCINTIRE COAL OIL & GAS Brine 170.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2010 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 150.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 70.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 170.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2013 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 170 Bbl CENT WASTE TRT FAC NPDES PA0095273
2014 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 160.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 160 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-167-28462
2016 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 100 Bbl CENT WASTE TRT FAC NPDES PA0095273
2017 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2018 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 60.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 WILLIAM MCINTIRE COAL OIL & GAS Produced Fluid 130.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1830612 Primary Facility 2009-09-22 Routine/Complete Inspection No Violations Noted Based on record, permit was approved on 6/17/05. Well installed on 4/4/06 to a depth of 4,910 ft. Report submitted and approved on 5/10/07. Well completed with 8¿ pipe reduced to 4 ¿pipe reduced to 2¿ production pipe and 5 shut off valves. Production equipment consists of heater, separator (120 psi), 100 bbl brine tank (< 50 bbl of fluid) and dual phase data logger (50 psi/0 psi) and total flow of 526700 cubic feet. At the time of inspection, no IW and E&S issues at the site. No signs of fluid or gas leakage around well head.

For data sources see[7]

References