If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-35617 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.541656,"lon":-79.032822,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Brush Valley Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: 146943 | |
Farm/Lease Name: BLOOM 8315 | |
License Status: ACTIVE | |
Spud Date: 2008-08-19 | |
Permit Date: 2007-09-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.541656 | |
Longitude: -79.032822 |
Date | Event |
---|---|
2007-09-05 | New Permit Application |
2008-08-18 | Performed Spud Operation |
2008-12-23 | Drilling Completion |
2009-01-30 | Perforation |
2009-09-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | LINN OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | LINN OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | XTO ENERGY INC | 23171.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 13,038.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 8,929.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 7,309.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 6,421.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 4,716.00 | 327 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 4,377.00 | 227 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 3,869.71 | 359 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 5,796.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 5,138.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 5,772.00 | 335 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | XTO ENERGY INC | Drilling | 110.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2009 | XTO ENERGY INC | Brine | 26.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | XTO ENERGY INC | Brine | 2,513.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2009 | XTO ENERGY INC | Fracking Fluid | 2,853.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | XTO ENERGY INC | Fracking Fluid | 180.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2010 | XTO ENERGY INC | Produced Fluid | 677.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Produced Fluid | 53.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 1,610.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2011 | XTO ENERGY INC | Produced Fluid | 308.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 388.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 69.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 69.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 42.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 181.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 85.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 85.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 158.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 48.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 96.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 72.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 155.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid | 80.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid | 80.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | ALLIANCE PETRO CO LLC | Waste comment only | 0.00 | ||
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 150.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2144564 | Primary Facility | 2013-03-01 | Routine/Complete Inspection | No Violations Noted | |
2160204 | Primary Facility | 2013-04-09 | Routine/Complete Inspection | No Violations Noted | Marcellus. According to records, TD reached on 12/23/2008. |
2320806 | Primary Facility | 2014-11-06 | Routine/Complete Inspection | No Violations Noted | Marcellus. At time of inspection, well drilled and equipped for production. According to records, drilling occurred 8/19/2008-12/23/2008. Chain-link fence located around well-head. Well tag present, legible. Brine tank sound, located on gravel pad in vegetative dike. |
2677486 | Primary Facility | 2018-01-03 | Routine/Complete Inspection | In Compliance with Schedule | Well appears to be in production.
Well head surrounded by security fence. |
2681052 | Primary Facility | 2018-01-10 | Administrative/File Review | No Violations Noted | ADMIN inspection to inspection record #2677486. Department received email correspondence from operator (photo #1) showing removal schedule of unused brine tank. The above mentioned inspection is being updated to ICS. A follow up inspection will be conducted at a later date to ensure removal schedule is being followed. |
2682597 | Primary Facility | 2018-01-16 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection to ensure unused brine tank has been removed from site. |
2834012 | Primary Facility | 2019-01-29 | Routine/Complete Inspection | No Violations Noted | On 1/29/19 at 1101 hrs., I conducted a routine inspection of Alliance Petroleum Corp.'s Bloom 8315 well (API 063-35617) in Brush Valley Twp., Indiana Co. Snow cover prevented proper evaluation of site stabilization. The pad appears to be restored and permanently stabilized. The well is equipped for production and a site ID sign is posted. A well tag is present at the well head. There are no violations noted for this inspection. |
For data sources see[7]