Well Details

Well ID: 37-063-35728
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: East Mahoning Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: PAUL STEWART 6
License Status: ACTIVE
Spud Date: 2008-02-05
Permit Date: 2007-12-06
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.799348
Longitude: -79.081234

For data sources see[1][2][3]

Well History

Date Event
2007-12-06 New Permit Application
2008-02-01 Performed Spud Operation
2008-02-08 Drilling Completion
2008-02-21 Perforation
2008-09-26 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 PHILLIPS EXPLORATION INC 4959.00 239 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 10851.00 326 9.00 326 0.00 0
2010 PHILLIPS EXPLORATION INC 6,685.00 245 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 9,236.00 333 0.00 0 0.00 0
2012 XTO ENERGY INC 9,981.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 7,768.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 6,076.00 320 0.00 0 0.00 0
2015 XTO ENERGY INC 3,890.54 365 0.00 0 0.00 0
2016 XTO ENERGY INC 2,830.00 322 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 2,027.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 1,828.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 PHILLIPS EXPLORATION INC Brine 510.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 PHILLIPS EXPLORATION INC Produced Fluid 675.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 91.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 81.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 106.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 PHILLIPS EXPLORATION INC Produced Fluid 29.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PHILLIPS EXPLORATION INC Produced Fluid 112.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2011 PHILLIPS EXPLORATION INC Produced Fluid 113.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 362.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PHILLIPS EXPLORATION INC Produced Fluid 143.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 306.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 261.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2012 XTO ENERGY INC Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2013 XTO ENERGY INC Produced Fluid 398.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 XTO ENERGY INC Produced Fluid 126 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 XTO ENERGY INC Produced Fluid 126.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 XTO ENERGY INC Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 XTO ENERGY INC Produced Fluid 70 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 XTO ENERGY INC Produced Fluid 70.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 XTO ENERGY INC Produced Fluid 5 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 XTO ENERGY INC Produced Fluid 5.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1673556 Primary Facility 2007-11-20 Routine/Complete Inspection No Violations Noted WELL STAKED - SITE NOT CONSTRUCTED. REQUEST FOR WAIVER - E/S OK
2390118 Primary Facility 2015-07-15 Administrative/File Review In Compliance with Policy SPILL.
2390121 Primary Facility 2015-07-15 Administrative/File Review In Compliance with Policy Admin inspt conducted as follow-up to record 2390118 for the reportable release of 2.5 bbl brine.Upon receipt of spill report, Dept contacted Opr rep J.Canose via phone at 1605.According to Mr. Canose, the release resulted after a groundhog dug out the supporting soil/gravel around a rock which then caused the rock to protrude into the base of the brine tank.Per Mr. Canose, the impacted area appears to be localized to an approximate 6 ft radius.Excavation is to commence in the morning after the roll-off boxes are delivered.Well site located within a pasture.Mr. Canose believes the spill occurred w/in the last 2 wks as this is the last time that a well-tender was on-site to record the tank levels.The release was discovered on 7/15/15 at 1300 when the well-tender recorded a 3 in drop in the fluid measurements, equating to a loss of 2.5 bbl brine water.Tank was immediately drained and the spill reported to the SWRO at 1450.No waterways are reported to be affected.A FUI will be conducted to assess any envir impact and/or issue any associated viols.
2391107 Primary Facility 2015-07-16 Incident- Response to Accident or Event Violation(s) Noted Incident Response Insp to Opr reported release of +/-2.5 bbls brine water:Admin Insp #2390118. At time of insp, Opr Rep. J.Canose /contractors on site. Well tag present.Bt disconnected from prod equip, moved from orig location, in secondary containment. J.Canose thinks groundhog digging under bt shifted dirt around rock,caused stress fracture,resulted in release of brine on to ground. Dept observed crack in bottom of bt. J.Canose stated well tender was last at site 2 wks ago. Excavator on site; removing impacted soils (determined by conductivity mtr) into 2 roll off boxes. Temp BMP’s installed down gradient of excavation. J.Canose stated Opr would be using ACT 2 for remediation. Dept recommends Opr ensure site is temp stabilized w/in 4 days of cessation of disturbance. Dept also recommends Operator continue to monitor/ maintain temp BMP’s and ar to prevent any E&S issues. Opr intends to fence off area. Inspected with WQS S. Foulk.Violations: Operator discharged brine or other fluids on or into the ground or into waters of the Commonwealth.
2411874 Primary Facility 2015-09-29 Follow-up Inspection Outstanding Violations - No Viols Req'd Follow up inspection to inspection #2391107 where violation issued for discharge (approx. 2 bbl) of brine or other fluids on or into grounds of the Commonwealth.
2419054 Primary Facility 2015-10-27 Administrative/File Review Outstanding Violations - No Viols Req'd Admin Inspection to Inspection ID #2391107 where violations issued for discharge of brine water and failure to control and dispose of production fluids.
2421170 Primary Facility 2015-10-28 Follow-up Inspection Outstanding Violations - No Viols Req'd Follow up inspection to inspection ID # 2391107 for reportable brine release.
2434080 Primary Facility 2015-12-12 Compliance Evaluation No Violations Noted Compliance Evaluation for Inspection Id. #2391107 for an Operator reported release of 2.5 bbls of brine.
2469692 Primary Facility 2016-03-21 Routine/Complete Inspection No Violations Noted Routine follow up inspection to Inspection Record #2391107 for Operator reported release of 2.5 bbl of brine.

At time of inspection well tag present and legible. No brine tank on site. Site located in a pasture. Area of release backfilled and appears to be seeded and mulched. Vegetation beginning to grow. Temporary BMP's installed downgradient of backfilled area. Securty fence around site and backfilled area. Department recommends Operator remove temporary BMP's upon permanent site stabilization. A follow up inspection will be conducted at a later date to ensure site is permanently stabilized.

2673541 Primary Facility 2017-12-11 Administrative/File Review In Compliance with Policy Admin inspection conducted in response to violations issued under inspection record 2391107 for the reportable release of 2.5 bbl of brine. Violations were subsequently corrected under inspection record 2434080.

The Final Report was approved on December 2, 2015.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2391107 730145 07/15/2015 2015-07-15 78.54 - GENERAL REQUIREMENTS - Operator failed to control and dispose of fluids, residual waste and drill cuttings, including tophole water, brines, drilling fluids, drilling muds, stimulation fluids, well servicing fluids, oil, and production fluids Environmental Health & Safety
2391107 730146 07/15/2015 2015-07-15 78.57(a) - CONTROL, STORAGE AND DISPOSAL OF PRODUCTION FLUIDS - Operator failed to collect the brine and other fluids produced during operation, service and plugging of the well in a tank, pit or a series of pits or tanks, or other device approved by Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
730145 327559 NOV - Notice of Violation
730146 327559 NOV - Notice of Violation

For data sources see[7]