If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-35966 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.455757,"lon":-79.117064,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: WILLIAM MCINTIRE COAL OIL & GAS | |
Well Pad ID: | |
Farm/Lease Name: RUSTIC 2 | |
License Status: ACTIVE | |
Spud Date: 2008-08-11 | |
Permit Date: 2008-04-23 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.455757 | |
Longitude: -79.117064 |
Date | Event |
---|---|
2008-04-23 | New Permit Application |
2008-08-12 | Performed Spud Operation |
2008-08-15 | Drilling Completion |
2008-09-08 | Perforation |
2009-06-26 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | WILLIAM MCINTIRE COAL OIL & GAS | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | WILLIAM MCINTIRE COAL OIL & GAS | 4340.00 | 118 | 0.00 | 0 | 0.00 | 0 |
2010 | WILLIAM MCINTIRE COAL OIL & GAS | 1,520.00 | 66 | 0.00 | 0 | 0.00 | 0 |
2011 | WILLIAM MCINTIRE COAL OIL & GAS | 4,702.00 | 184 | 0.00 | 0 | 0.00 | 0 |
2012 | WILLIAM MCINTIRE COAL OIL & GAS | 1,912.00 | 47 | 0.00 | 0 | 0.00 | 0 |
2013 | WILLIAM MCINTIRE COAL OIL & GAS | 6,699.70 | 196 | 0.00 | 0 | 0.00 | 0 |
2014 | WILLIAM MCINTIRE COAL OIL & GAS | 8,039.00 | 178 | 0.00 | 0 | 0.00 | 0 |
2015 | WILLIAM MCINTIRE COAL OIL & GAS | 6,829.00 | 124 | 0.00 | 0 | 0.00 | 0 |
2016 | WILLIAM MCINTIRE COAL OIL & GAS | 9,394.00 | 266 | 0.00 | 0 | 0.00 | 0 |
2017 | WILLIAM MCINTIRE COAL OIL & GAS | 3,162.00 | 210 | 0.00 | 0 | 0.00 | 0 |
2018 | WILLIAM MCINTIRE COAL OIL & GAS | 2,529.00 | 124 | 0.00 | 0 | 0.00 | 0 |
2019 | WILLIAM MCINTIRE COAL OIL & GAS | 2,088.00 | 71 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 118.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2015 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 70.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 70 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 140.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 140 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2017 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 60.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | WILLIAM MCINTIRE COAL OIL & GAS | Produced Fluid | 30.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1833982 | Primary Facility | 2009-10-06 | Routine/Complete Inspection | No Violations Noted | Based on record, permit was approved on 4/23/08. Well installed on 8-15-08 to a depth of 5410 ft. Report submitted and approved on 9-30-08. Well completed with 8¿ pipe reduced to 4 ¿pipe reduced to 2¿ production pipe and 5 shut off valves. Production equipment consists of heater, separator (125 psi), 100 bbl brine tank (< 10 bbl of fluid) and dual phase data logger (125 psi/ 0 psi). At the time of inspection, no IW and E&S issues at the site. No signs of fluid or gas leakage around well head. |
For data sources see[7]