If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36078 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.856883,"lon":-78.980589,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Canoe Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: BUDD S WINEBERG 6 | |
License Status: ACTIVE | |
Spud Date: 2009-02-10 | |
Permit Date: 2008-06-12 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.856883 | |
Longitude: -78.980589 |
Date | Event |
---|---|
2008-06-12 | New Permit Application |
2009-02-10 | Performed Spud Operation |
2009-02-14 | Drilling Completion |
2009-02-24 | Perforation |
2010-01-13 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | CONSOL GAS CO | 11396.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 6,415.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 3,946.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 3,763.82 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 3,612.69 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 3,207.67 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 2,320.35 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 2,391.46 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 1,682.91 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CONSOL GAS CO | Fracking Fluid | 440.00 Bbl | Other | 37-063-36029 |
2009 | CONSOL GAS CO | Brine | 50.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2009 | CONSOL GAS CO | Fracking Fluid | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | CONSOL GAS CO | Brine | 89.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | CONSOL GAS CO | Fracking Fluid | 1,760.00 Bbl | Other | 37-063-36079 |
2011 | CNX GAS CO LLC | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2012 | CNX GAS CO LLC | Produced Fluid | 36.23 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2014 | CNX GAS CO LLC | Produced Fluid | 52.10 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016 | CNX GAS CO LLC | Produced Fluid | 65.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 63.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2385127 | Primary Facility | 2015-06-25 | Administrative/File Review | In Compliance with Policy | SPILL. |
2385129 | Primary Facility | 2015-06-26 | Administrative/File Review | In Compliance with Policy | Admin inspt in response to inspt record 2385127 for the reported release of 5 gallons brine water.Upon receipt of spill report, Dept contacted Richy Vrobel via phone on 6/26/15 at 1331.Mr. Vrobel stated the release occurred as a result of a mechanical failure when emptying the tank.When hose was disconnected from tank, fluids w/in hose spilled back out onto ground.According to Mr. Vrobel, the fluids were immediately soaked up and all visibly impacted materials removed.The excavated area has been replaced with new gravel. As fluids released only came from w/in hose and hose is estimated to contain a max quantity of 4-5 gal at a time, the spill was reported as 5 gal.Per Mr. Vrobel, release occurred on 6/25 at 1230 and was subsequently reported to the SWRO at 1405.No waterways reported to be affected. |
2528671 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | 10/5/2016 - tank, tag. |
For data sources see[7]