If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36194 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.846342,"lon":-78.931932,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Canoe Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: A M TYGER 9 | |
License Status: | |
Spud Date: 2009-07-07 | |
Permit Date: 2008-08-20 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.846342 | |
Longitude: -78.931932 |
Date | Event |
---|---|
2008-08-20 | New Permit Application |
2009-07-07 | Performed Spud Operation |
2009-07-13 | Drilling Completion |
2009-07-23 | Perforation |
2009-11-02 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 3944.00 | 112 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 9,457.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 7,315.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 5,180.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 4,537.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 3,634.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 3,075.70 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 2,917.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,673.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 2,290.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 1,240.00 | 304 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 93.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 781.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 34.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 105.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 123.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 130.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 130.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 205.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 245.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 17.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | XTO ENERGY INC | Produced Fluid | 509.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 16.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2013 | XTO ENERGY INC | Produced Fluid | 466 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 466.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | XTO ENERGY INC | Produced Fluid | 379.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | XTO ENERGY INC | Produced Fluid | 379 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 288 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 288.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | XTO ENERGY INC | Produced Fluid | 251.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | XTO ENERGY INC | Produced Fluid | 251 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2017 | ALLIANCE PETRO CO LLC | Produced Fluid | 142.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2017 | ALLIANCE PETRO CO LLC | Produced Fluid | 53.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid | 58.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid | 198.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 55.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 95.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1813797 | Primary Facility | 2009-07-17 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place. E&S plan on site. Well not equipped for production (well head only on site). |
1888113 | Primary Facility | 2010-05-25 | Site Restoration | No Violations Noted | Drilling completed 7/13/09. |
For data sources see[7]