If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36216 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.777395,"lon":-78.992012,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Grant Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: IRENE BASH 4 | |
License Status: ACTIVE | |
Spud Date: 2008-10-22 | |
Permit Date: 2008-09-12 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.777395 | |
Longitude: -78.992012 |
Date | Event |
---|---|
2008-09-12 | New Permit Application |
2008-10-22 | Performed Spud Operation |
2008-11-26 | Drilling Completion |
2008-12-09 | Perforation |
2009-06-26 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | PHILLIPS EXPLORATION INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 204937.00 | 320 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 195,750.00 | 296 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 211,976.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 134,078.00 | 338 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 125,083.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 80,346.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 53,816.07 | 361 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 17,567.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 17,072.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 12,561.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 57,517.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 6.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 51.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 7.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 8.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 2.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 30.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 30.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 30.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 75.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2012 | XTO ENERGY INC | Produced Fluid | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 370.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 33.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 370 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 44.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2014 | XTO ENERGY INC | Produced Fluid | 375.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 95.45 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | XTO ENERGY INC | Produced Fluid | 95.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 148.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 316.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | ALLIANCE PETRO CO LLC | Produced Fluid | 178.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid | 45.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 173.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 908.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1745616 | Primary Facility | 2008-10-23 | Drilling/Alteration | No Violations Noted | Phillips Drilling@ 180' ; Replacing bottom hole reamer |
1751848 | Primary Facility | 2008-11-20 | Drilling/Alteration | No Violations Noted | Dusting @ 5765'; Pit/E&S OK |
1756076 | Primary Facility | 2008-12-11 | Routine/Complete Inspection | No Violations Noted | Treating 7664-7670 interval. Pit/ E&S OK |
1758231 | Primary Facility | 2008-11-07 | Routine/Complete Inspection | No Violations Noted | not equipped/E&S advice/freeboard ok/ID&plan ok |
1785803 | Primary Facility | 2009-04-16 | Routine/Complete Inspection | No Violations Noted | Well was equipped for production. No accelerated erosion and sedimentation noted on the access road or well site. However, at the time of the inspection no seeding or mulching had occurred. Operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete. |
1849151 | Primary Facility | 2009-07-21 | Routine/Complete Inspection | No Violations Noted | Well was equipped for production. No accelerated erosion and sedimentation noted on the access road or well site. Vegetation is well established. Operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete. |
2845867 | Primary Facility | 2019-02-27 | Administrative/File Review | No Violations Noted | Start Sheet created for file. |
For data sources see[7]