If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36302 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.493852,"lon":-79.261741,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Black Lick Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: HARRY F PERSHING 3 | |
License Status: | |
Spud Date: 2009-06-24 | |
Permit Date: 2008-11-18 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.493852 | |
Longitude: -79.261741 |
Date | Event |
---|---|
2008-11-18 | New Permit Application |
2009-06-23 | Performed Spud Operation |
2009-07-01 | Drilling Completion |
2009-07-07 | Perforation |
2009-10-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 358.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 10,323.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 5,480.00 | 363 | 53.00 | 363 | 0.00 | 0 |
2012 | XTO ENERGY INC | 3,973.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 3,050.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 1,394.00 | 182 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 1,221.00 | 68 | 47.15 | 68 | 0.00 | 0 |
2016 | XTO ENERGY INC | 2,420.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,734.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,686.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 19.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 161.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 2.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 7.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 22.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 9.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 7.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 7.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 2.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 3.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 2.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 43.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 57.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 62.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2015 | XTO ENERGY INC | Produced Fluid | 18 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 18.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 80.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1813556 | Primary Facility | 2009-07-17 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place. E&S plan on site. Well not equipped for production (well head only on site). |
1816687 | Primary Facility | 2009-07-21 | Drilling/Alteration | No Violations Noted | drilling complete - not equipped/E&S ok/ID&pit ok |
1847607 | Primary Facility | 2009-12-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, the well was in production and well head was properly tagged. The site was not yet restored with successful vegetative growth, but appears area had been seeded and mulched. Brine tank appeared sound. Noted some possible E&S concerns with well site due to steep cut slope that has not yet observed successful vegetative growth, but noted that filter fence had been installed and appeared to be functioning as noted in E&S plan. It is recommended that the operator continue to monitor closely the cut slope in order to prevent E&S issues from occurring. |
For data sources see[7]