Well ID: 37-063-36304 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.629369,"lon":-79.101191,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: White Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 147236 | |
Farm/Lease Name: INDIANA COUNTY AIRPORT 8431H | |
License Status: | |
Spud Date: 2009-07-10 | |
Permit Date: 2008-12-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.629369 | |
Longitude: -79.101191 |
Date | Event |
---|---|
2008-12-11 | New Permit Application |
2009-07-27 | Performed Spud Operation |
2009-09-04 | Drilling Completion |
2009-09-04 | Perforation |
2009-09-08 | Perforation |
2011-01-24 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | XTO ENERGY INC | 38021.00 | 100 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 83,696.50 | 318 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 65,064.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 50,256.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 43,058.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 33,512.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 33,405.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 28,468.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 23,313.00 | 226 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 24,307.35 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 21,868.79 | 336 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | XTO ENERGY INC | Brine | 2,720.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | XTO ENERGY INC | Brine | 13,593.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2009 | XTO ENERGY INC | Fracking Fluid | 186.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | XTO ENERGY INC | Drilling | 2,720.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | XTO ENERGY INC | Fracking Fluid | 88.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 2,580.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | XTO ENERGY INC | Produced Fluid | 16,820.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Produced Fluid | 1,360.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 1,963.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 570.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 1,902.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 427.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | INJECTION DISPOSAL WELL | 34-151-22783 |
2011 | XTO ENERGY INC | Produced Fluid | 431.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | XTO ENERGY INC | Produced Fluid | 2,738.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 900.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2011 | XTO ENERGY INC | Produced Fluid | 2,358.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 771.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | XTO ENERGY INC | Produced Fluid | 1,070.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 616.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 451.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Produced Fluid | 526.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 526.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 314.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 6,796.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 412.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 1,433.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,433.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 2,421.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 303.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 303.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 1,453.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 396.74 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 120.51 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 241.60 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 406.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 2,557.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 300.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 1,280.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 48.10 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | MID98099156 |
2016 | XTO ENERGY INC | Produced Fluid | 855.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 106.47 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 48.10 Bbl | CENT WASTE TRT FAC NPDES | MID98099156 |
2017 | XTO ENERGY INC | Produced Fluid | 1,416.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 1,682.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 1,409.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 167.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 330.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1819618 | Primary Facility | 2009-07-28 | Drilling/Alteration | No Violations Noted | MARCELLUS - equipment moving onto site to spud/E&S ok/ID&pit ok |
1821571 | Primary Facility | 2009-08-11 | Drilling/Alteration | No Violations Noted | MARCELLUS - drilling @ 6519ft/E&S ok/ID&pit ok |
1822623 | Primary Facility | 2009-07-31 | Routine/Complete Inspection | No Violations Noted | Marcellus well. Site created. Drilling rig/equipment in place. Drilling not yet started. |
1823635 | Primary Facility | 2009-08-20 | Drilling/Alteration | No Violations Noted | MARCELLUS - drilling @ 7520ft/E&S ok/ID&pit ok |
1827326 | Primary Facility | 2009-09-09 | Routine/Complete Inspection | No Violations Noted | Marcellus well. Drilling crew rigging down and removing equipment at time of inspection. Well head only on site. |
1857920 | Primary Facility | 2010-01-12 | Routine/Complete Inspection | No Violations Noted | equipped/E&S ok/tag ok |
1870926 | Primary Facility | 2010-03-12 | Routine/Complete Inspection | No Violations Noted | drilling complete, pit is close to freeboard, notified operator |
1943312 | Primary Facility | 2011-01-03 | Site Restoration | Violation(s) Noted | Marcellus well. Well is equipped for production. Drilling completed 9/4/2009. |
2046763 | Primary Facility | 2012-02-27 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up inspection on Viols issued on 1/3/11. Site not yet restored, minor ES concerns with culvert ditches. Oustanding violations exist no new violations. OGI Rick Hoover and XTO Rep Stepehen Smith onsite. |
2071650 | Primary Facility | 2012-05-09 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FUI inspection to previously issued violations. Meeting with XTO personnel and DEP scheduled for May 11 to dicuss oustanding violations and criteria for complaince. |
2071658 | Primary Facility | 2012-05-11 | Administrative/File Review | In Compliance with Policy | MEETING TO DISCUSS OUTSTANDING VIOLATIONS: PRESENT BEN KISSEL, NICK COPPAGE, MIKE VALE, STEPHEN SMITH, ED RITZER, ALAN EICHLER AND MYSELF. |
2073957 | Primary Facility | 2012-06-05 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FOLLOW UP INSPECTION to examine remediation work on "impoundments" located on well site. Department reviewed remediation plans submitted by Hull and associates for the remaining impoundment at this well site, and have agreed to proposed plans for "this site;" therefore, XTO had plans to reconvene restoration activities. Since last inspection, it appears water has accumulated in impoundment, presumable due to recent heavy rainfall. Based on 5/10/12 meeting operator agreed flow back was contained in impoundment, based on today's inspection department notes concerns with possible contamination of surrounding soils with "impoundment" water due to structural deficiencies in liner. Department sent Steve Smith of XTO an email addressing these concerns. Until final permanent restoration is completed well site is in violation for failure to restore (entire well site) within nine months of completion of drilling, although at this time no other violations noted. |
2078527 | Primary Facility | 2012-06-21 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FOLLOW UP INSPECTION to examine remediation work on "impoundments" located on well site. Department reviewed remediation plans submitted by Hull and associates for the remaining impoundment at this well site(see attached), and have agreed to proposed plans for "this site;" therefore, XTO had plans to reconvene restoration activities Since last inspection, liquid pit contents have been removed impoundment and operator currently having liner pressured washed. A tank of "clean" water was brought onsite and being utilized for pressure washing. Operator plans to examine liner integrity and mark then subsequently samples any areas that may have been penetrated. today, department could not visibly located tears or holes, but maticulious examination was not done. Again, department is recommending that operator perform soil testing on side of impoundment that was removed and hay baled, due to the possibility that pit contents may have overtopped area during rain events. Operator is actively pursing complaince status on this site. |
2090952 | Primary Facility | 2012-08-01 | Follow-up Inspection | Pending | INSPECTION RESULT PENDING AWAITING RESPONSE FROM OPERATOR ON RESTORATION AGREEMENT BTW OPERATOR AND AIRPORT AND WHAT AND WHEN FINAL RESTORATON EFFORTS WILL BE COMPLETED. |
2094013 | Primary Facility | 2012-08-15 | Complaint Inspection | In Compliance with Policy | Partial Inspection- result of citizen complaint of concerns with storm water run-off. Joe Yackuboskey ICCD and OGI Rick Hoover onsite. Joe, indicated his thoughts on where and how the storm water run-off is reaching the complaintants property. Minor erosion noted access road shared to conventional well. At this time department is unable to conclusively determine that the flooding occurring on complainants property is a direct result of increased storm water runoff from Marcellus well site. A meeting is being held tomorrow, on this location with the airport director, as well as gas well operator, myself and a water quality specialist supervisor, to examine and determine if/what measure can be taken to minimize the storm water runoff that may discharge off of well site. Based on department approved ESCGP-1 it appears that well operator has contstructed and maintained bmp's as outlined in plan. Therefore, at this time no violations are being noted and operator is currenlty in compliance with current policy. Investigation is ongoing at this time. |
2094022 | Primary Facility | 2012-08-16 | Complaint Inspection | Pending | Inspection result of compliant. Department received a complaint of concerns with storm water runoff from well site to neighboring properties along Apache Drive. Water Quality Specialist Supervisor Edward Ritzer, Todd Hemming Indiana County Airport, and Steve Smith XTO EHS rep also present during inspection.Well sign, ES plan, and ESCGP-1 onsite. Access road appears stable. Well site adequately rocked. Ditches surrounding well pad appear to be adequately vegetated. Impoundments located on adjoining property to the well site have been "removed." Well site appears restored except form local of water impoundments, which overlapps airport project. both parties agreeded that airport will conclude final restoration per FAA regs. This is inspection is pending in order to verify LOD's as well as written confirmation of restoration plan. |
2110799 | Primary Facility | 2012-10-16 | Compliance Evaluation | No Violations Noted | Follow up inspection to examine restoration efforts from previously issued violations. At the time of this inspection, well site ID sign, ES plan, ESCGP-1 on located onsite. Site gated. At the time of inspection, it appears that site has been restored to PCSM. Although in like of nearby complaints operator agreed to reduce the size of the pad (rock) and replace with vegetation in order to minimize runoff from the well site, department is still waiting on final plans for pad reduction. All pits and impoundments have been removed and hydro seeded. No accelerated erosion or sedimentation issues noted at the time of this inspection with access road or well site. It appears that operator has successfully addressed previously issued violations and no new violations noted; therefore, based on today’s inspection previously issued violations for failure to restore have been corrected. |
2136038 | Primary Facility | 2013-01-31 | Routine/Partial Inspection | In Compliance with Policy | nspection result of request from operator for onsite meeting to examine additional restoration plans for well site. Mike Vale (Morris Knowles & Associates), Erik Greenert (XTO), Rick Hoover (OGI) Samantha Foulk (Environmental Trainee), and myself present at time of meeting. Last fall, operator restored site according to PCSM, but as a result of former complaints due to possibility of increased water runoff from the well site XTO agreed to update their PCSM to aid in minimizing the net discharge of surface waters. During today’s meeting Engineer Mike Vale presented two proposed plans to the department |
2205789 | Primary Facility | 2013-09-12 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well equipped for production. Marcellus. Well tag present, legible. Wellhead surrounded by chain-link fence and cement barriers. Brine tank located within lined metal secondary containment unit, both appear sound. Access road in good condition. |
2205800 | Primary Facility | 2013-09-16 | Administrative/File Review | In Compliance with Policy | Confirmation received from SWRO permitting Operator to proceed with implementing the updated PCSM plan as designed. |
2225078 | Primary Facility | 2013-11-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well equipped for production. Marcellus. Well tag present, legible. Wellhead surrounded by chain-link fence and cement barriers. Brine tank located within lined metal secondary containment unit, both appear sound. Accumulation within containment unit; Department recommends Operator empty and dispose of accumulation as per current regulations. |
2269637 | Primary Facility | 2014-05-01 | Routine/Complete Inspection | In Compliance with Policy | |
2278235 | Primary Facility | 2014-06-05 | Administrative/File Review | Violation(s) Noted | Admin inspt. Upon review of restoration report submitted by Operator to SWRO, it appears Operator improperly disposed of brine water and stimulation fluids by encapsulating within pit. Per the E&S plan, previous location of drill pit coincides with observed areas of stressed vegetation. The OG-71 submitted for disposal of drill cuttings indicates that cement was utilized to solidify cuttings prior to encapsulation. |
2392085 | Primary Facility | 2015-07-15 | Administrative/File Review | Outstanding Violations - No Viols Req'd | Admin inspection conducted in regards to violations issued under inspection record 2278235 (enf ID 312107). |
2399319 | Primary Facility | 2015-08-13 | Administrative/File Review | Outstanding Violations - No Viols Req'd | Admin inspection. Proposal as referenced in inspection record 2392085 submitted to Department on 8/3/15 by Operator representative Jason Canose. |
2414964 | Primary Facility | 2015-09-30 | Routine/Complete Inspection | Pending | On-site inspection conducted in response to record 2269637. |
2512384 | Primary Facility | 2016-08-10 | Routine/Partial Inspection | No Violations Noted | Routine Partial inspection to inspection record # 2278235 where violation issued for improper pit encapsulation.
At time of inspection area of previously stressed vegetation appears to be >70% uniform vegetated growth. Department recommends Operator continue to monitor site to ensure permanent stabilization is maintained. Previously issued violation has been corrected. Inspected with WQSS A. Weiland. |
2791345 | Primary Facility | 2018-10-16 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by security fence and cement barriers. |
2826591 | Primary Facility | 2019-01-11 | Routine/Complete Inspection | No Violations Noted | On 1/11/19 at 1132 hrs., I conducted a routine inspection of XTO Energy, Inc.'s Indiana County Airport 8431H well (API 063-36304) in White Twp., Indiana Co. Snow cover prevented proper evaluation of site stabilization. The well pad appears to be restored and permanently stabilized. The well is properly labeled and equipped for production. A site ID sign is posted and a well tag is present at the well head. The production fluid tank is located within adequate secondary containment. There are no violations noted for this inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1943312 | 603089 | 01/03/2011 | 2011-01-03 | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | Environmental Health & Safety | |
1943312 | 603090 | 01/03/2011 | 2011-01-03 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
2278235 | 698125 | 06/05/2014 | 2014-06-05 | 78.62 - Improper encapsulation of waste | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
603089 | 266917 | NOV - Notice of Violation | Comply/Closed | 2012-10-16 | |||
603090 | 266917 | NOV - Notice of Violation | Comply/Closed | 2012-10-16 | |||
698125 | 312107 | NOV - Notice of Violation | Comply/Closed | 2016-11-29 |