If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36314 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.484853,"lon":-79.249741,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Black Lick Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: SMITH & CLAWSON 5 | |
License Status: | |
Spud Date: 2009-06-03 | |
Permit Date: 2008-11-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.484853 | |
Longitude: -79.249741 |
Date | Event |
---|---|
2008-11-13 | New Permit Application |
2009-06-02 | Performed Spud Operation |
2009-06-09 | Drilling Completion |
2009-06-16 | Perforation |
2009-10-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 255.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 131.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 4,674.00 | 363 | 161.00 | 363 | 0.00 | 0 |
2012 | XTO ENERGY INC | 4,730.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 1,890.00 | 108 | 52.50 | 108 | 0.00 | 0 |
2014 | XTO ENERGY INC | 1,312.00 | 127 | 55.00 | 127 | 0.00 | 0 |
2015 | XTO ENERGY INC | 1,516.20 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 1,266.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 437.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,033.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 416.00 | 212 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 26.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 26.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 26.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 57.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2014 | XTO ENERGY INC | Produced Fluid | 5.64 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1804574 | Primary Facility | 2009-06-11 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place. E&S plan on site. |
1838492 | Primary Facility | 2009-10-23 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, the well was drilled and properly tagged. Brine tank was in sound condition. Well site was seeded and mulched with evidence of growth (not yet 70% vegetative cover). No accelerated erosion or sedimentation was observed in relation to well site. It is recommended that the access road be maintained as some erosion is developing. It is recommended that roadway turnouts be rock lined until permanent vegetation has been established that can direct and filter ditch flow. |
For data sources see[7]