If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36379 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.696822,"lon":-79.19526,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Washington Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: E C FILLER 3 | |
License Status: | |
Spud Date: 2009-07-06 | |
Permit Date: 2008-12-30 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.696822 | |
Longitude: -79.195260 |
Date | Event |
---|---|
2008-12-30 | New Permit Application |
2009-07-06 | Performed Spud Operation |
2009-07-08 | Drilling Completion |
2009-07-17 | Perforation |
2009-10-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 6471.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 32,682.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 21,612.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 16,237.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 13,961.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 12,920.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 11,452.60 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 10,602.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 6,467.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 9,938.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 8,303.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1813796 | Primary Facility | 2009-07-15 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place. E&S plan on site. Well not equipped for production (well head only on site). |
1825389 | Primary Facility | 2009-09-01 | Complaint Inspection | No Violations Noted | Inspection conducted with Oil & Gas Inspector Rick Hoover. |
1829356 | Primary Facility | 2009-09-01 | Complaint Inspection | No Violations Noted | not equipped/site restored - E&S ok/ID ok/water loss complaint |
1831797 | Primary Facility | 2009-09-22 | Routine/Complete Inspection | No Violations Noted | drilling complete - awaiting hook-up/E&S ok/tank&tag ok |
For data sources see[6]