If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36408 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.456519,"lon":-79.262075,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Burrell Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: ALEX TAMSULA 4 | |
License Status: | |
Spud Date: 2009-08-26 | |
Permit Date: 2009-01-26 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.456519 | |
Longitude: -79.262075 |
Date | Event |
---|---|
2009-01-26 | New Permit Application |
2009-08-25 | Performed Spud Operation |
2009-08-28 | Drilling Completion |
2009-09-04 | Perforation |
2010-01-13 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 349.00 | 10 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 6,948.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 953.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 487.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 2,164.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 3,252.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 2,673.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 1,907.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 2,267.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 2,159.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 2,371.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1815167 | Primary Facility | 2009-07-15 | Routine/Complete Inspection | No Violations Noted | id sign & e/s on site, site constructed, pit dug but unlined, no rig, filter fence in place |
1819588 | Primary Facility | 2009-08-06 | Drilling/Alteration | No Violations Noted | Currently, well permit issued on 1/26/09 for well to be completed to 5,000 ft. in depth. Well pad completed with filter fencing and dual pits. Well stake located in center of pad. Well sign and E&S plan located at the entrance way. Site layout matches the E&S plan. At the time of inspection, no E&S issues at the site. |
1824640 | Primary Facility | 2009-08-27 | Drilling/Alteration | No Violations Noted | According to records, well permit issued on 1/26/09 for well to be completed to 5,000 ft. in depth. Well pad completed with filter fencing and dual pits. Well sign and E&S plan located at the entrance way. Site layout matches the E&S plan. At the time of inspection, no E&S and free board issues at the site. Pit aligned with 20 mil plastic. Phillips drilling the well at current depth of 2,590 ft. Conductor pipe set at 27¿ (13 7/8¿) and damp at 488¿. TD expected at 3,910 ft. from grade. DEP water quality personnel, April Wieland assisting with inspection. |
1841570 | Primary Facility | 2009-10-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, the well was drilled not yet in production. The site was properly signed with E&S plan onsite available for review. No accelerated erosion or sedimentation issues were observed in relation to access road or well site. Fluids were removed from pits, but the pit liners were improperly secured, as sections of the liner had become loose. Although freeboard was not exceeded this could cause a potential pollution event, it is recommended that this be addressed promptly to avoid any such violation. |
For data sources see[6]