If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36459 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.656733,"lon":-79.130508,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: White Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: LUTHER S WILLIAMS 4 | |
License Status: | |
Spud Date: 2009-04-08 | |
Permit Date: 2009-03-10 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.656733 | |
Longitude: -79.130508 |
Date | Event |
---|---|
2009-03-10 | New Permit Application |
2009-04-07 | Performed Spud Operation |
2009-04-14 | Drilling Completion |
2009-04-22 | Perforation |
2009-09-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 2,428.00 | 212 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 5,199.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 2,745.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 1,801.00 | 317 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 1,924.00 | 245 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 1,623.00 | 294 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 1,504.00 | 254 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,181.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,415.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 1,172.00 | 346 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 62.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 521.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 22.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 70.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 82.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 25.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 342.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | XTO ENERGY INC | Produced Fluid | 23 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 48.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013 | XTO ENERGY INC | Produced Fluid | 23.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 120 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | XTO ENERGY INC | Produced Fluid | 20.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | XTO ENERGY INC | Produced Fluid | 229.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | XTO ENERGY INC | Produced Fluid | 20 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2014 | XTO ENERGY INC | Produced Fluid | 229 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | XTO ENERGY INC | Produced Fluid | 104 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 54 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | XTO ENERGY INC | Produced Fluid | 54.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2016 | XTO ENERGY INC | Produced Fluid | 25.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | XTO ENERGY INC | Produced Fluid | 25 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1784838 | Primary Facility | 2009-04-14 | Drilling/Alteration | No Violations Noted | drilling complete - prep to log/pit ok/E&S ok |
1800098 | Primary Facility | 2009-05-26 | Routine/Complete Inspection | No Violations Noted | drilling complete, not yet equipped for production, pit liner needs maintaence |
2278210 | Primary Facility | 2014-06-05 | Administrative/File Review | In Compliance with Policy | SPILL. |
2278223 | Primary Facility | 2014-06-10 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | Admin inspt as follow-up to reported spill under inspt record 2278210.Dept spoke to Opr rep Jason Canose via phone.Mr. Canose stated that an estimated 2 bbl brine was released to the ground due to a brine tank overflow.No waterways reported to be impacted.Mr. Canose stated that this release was discovered on 6/3/14.The Dept was not notified of this release until 6/5/14 (record 2278210). Per current regulations, if a reportable release of brine on or into the ground occurs at the well site, the Opr shall notify the appropriate regional office of the Dept as soon as practicable, but no later than 2 hours after detecting or discovering the release. Hence, this release was not reported to the Dept w/in the regulated timeframe. |
2278452 | Primary Facility | 2014-06-12 | Routine/Complete Inspection | Violation(s) Noted | On-site inspt as follow-up to reported spill under inspt 2278210.Opr reps Jason Canose & Gordon Bish on-site.Two bbl brine released to ground due to brine tank overflow.Areas of discolored/stressed vegetation extending approx 60 ft down-gradient from BT.Excavation not yet commenced. BMPs installed in preparation for excavation of contaminated soils.Arrival of roll-off boxes & excavation activities scheduled to begin tomorrow (6/13/14).Opr plans to utilize Act 2 for remediation efforts.WT present, legible. Drilling occurred 4/8/09-4/14/09.Shared AR stable.Dept rec'ds Opr cont' to monitor/maintain AR & well site as increased traffic due to clean-up efforts could potentially result in an accel E&S pollution event.A follow-up inspection will be conducted in the future to ensure site is properly cleaned-up and restored. |
2296844 | Primary Facility | 2014-08-20 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FUI in response to violations issued under inspection record 2278452 (enf ID 312130) for the 6/3/14 reportable release of two bbl brine water |
2341070 | Primary Facility | 2015-01-29 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FUI in response to violations issued under inspection record 2278452 (enf ID 312130) for the 6/3/14 reportable release of two bbl brine water to ground due to brine tank overflow. |
2355604 | Primary Facility | 2015-03-24 | Follow-up Inspection | No Violations Noted | FUI in response to violations issued under inspection record 2278452 (enf ID 312130) for the 6/3/14 reportable release of two bbl brine water to ground due to brine tank overflow.At time of inspection, site not yet backfilled.Area of excavation temporarily stabilized with mulch. BMPs installed down-gradient of excavated areas.Department recommends Operator continue to monitor and maintain BMPs due to the recent snowmelt in order to prevent any potential pollution events from occurring.In accordance with the spill policy, written correspondence received by Department on 6/17/14 notifying Department that Operator is utilizing Act 2 for remediation efforts. Final Report received by the Department on 12/9/14. Final report approved by the Department on 1/27/2015.A follow-up inspection will be conducted in the future to ensure site is properly remediated and restored.Additional comments on paper SAIR. |
2402409 | Primary Facility | 2015-08-26 | Compliance Evaluation | No Violations Noted | On-site CEI conducted in response to viols issued under record 2278452 (enf ID 312130) for the 6/3/14 reportable release of two bbl brine water to ground due to brine tank overflow.At time of inspt, site backfilled, seeded/mulched, permanently stabilized with 70% adequate veg growth.Temp BMPs removed.Dept recommends Opr re-seed/mulch as necessary in order to ensure uniform and adequate veg growth is maintained.In accordance w/spill policy, written correspondence received by Dept on 6/17/14 notifying Dept that Opr is utilizing Act 2 for remediation efforts.Final Report received by Dept on 12/9/14.Final report approved by Dept on 1/27/15.Drilling occurred 4/8/2009-4/14/2009.BT appears sound, located on gravel pad.WT present, legible.Shared AR stabilized.As Act 2 approval received and site is restored, viols issued under record 2278452 (enf ID 312130) corrected. Accompanied by Environmental Trainee Cindy Witham.Requested written response to viols received on 6/26/14. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2278223 | 698111 | 06/10/2014 | 2014-06-10 | 78.66BRINE - Failure to report a reportable release of brine to DEP within 2 hours. | Administrative | |
2278452 | 698166 | 06/12/2014 | 2014-06-12 | 78.57 - Failure to post pit approval number | Administrative | A violation is being issued for Operator's failure to properly collect and not discharge brine and other fluids on or into the ground or into the waters of the Commonwealth. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
698111 | 312104 | NOV - Notice of Violation | Superseded | 2018-04-30 | |||
698111 | 363720 | CPA - Civil Penalty Assessment | Comply/Closed | 2018-06-06 | 2018-06-06 | $70,000.00 | $70,000.00 |
698166 | 312130 | NOV - Notice of Violation | Superseded | 2018-04-30 | |||
698166 | 363720 | CPA - Civil Penalty Assessment | Comply/Closed | 2018-06-06 | 2018-06-06 | $70,000.00 | $70,000.00 |
For data sources see[7]