If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36505 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.577892,"lon":-79.210072,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: White Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: L MCHENRY 5 | |
License Status: | |
Spud Date: 2009-08-27 | |
Permit Date: 2009-04-09 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.577892 | |
Longitude: -79.210072 |
Date | Event |
---|---|
2009-04-09 | New Permit Application |
2009-08-26 | Performed Spud Operation |
2009-10-05 | Drilling Completion |
2009-10-14 | Perforation |
2010-09-23 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CONSOL GAS CO | 18497.87 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 45,463.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 9,546.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 5,405.20 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 640.5 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 1,015.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CONSOL GAS CO | Drilling | 300.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2009 | CONSOL GAS CO | Fracking Fluid | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2009 | CONSOL GAS CO | Drilling | 1,400.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | CONSOL GAS CO | Brine | 178.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | CONSOL GAS CO | Produced Fluid | 603.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | CONSOL GAS CO | Produced Fluid | 175.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | CONSOL GAS CO | Produced Fluid | 267.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CNX GAS CO LLC | Produced Fluid | 98.28 Bbl | INJECTION DISPOSAL WELL | PAS2D912BSOM |
2011 | CNX GAS CO LLC | Produced Fluid | 63.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2011 | CNX GAS CO LLC | Produced Fluid | 60.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2011 | CNX GAS CO LLC | Produced Fluid | 79.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | CNX GAS CO LLC | Produced Fluid | 16.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CNX GAS CO LLC | Produced Fluid | 170.00 Bbl | INJECTION DISPOSAL WELL | PAS2D912BSOM |
2016 | CNX GAS CO LLC | Produced Fluid | 5.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1821762 | Primary Facility | 2009-08-18 | Complaint Inspection | No Violations Noted | Inspection conducted with Oil & Gas Inspector Rick Hoover. |
1823634 | Primary Facility | 2009-08-18 | Drilling/Alteration | No Violations Noted | well site being made - E&S ok |
1827328 | Primary Facility | 2009-09-09 | Routine/Complete Inspection | No Violations Noted | Well is not equipped for production (well head only on site). Site ID sign in place. E&S plan on site. |
1829361 | Primary Facility | 2009-09-08 | Drilling/Alteration | No Violations Noted | drilling commenced - currently shut-in on surface casing awaiting downhole rig/E&S ok/ID&pit ok |
1835957 | Primary Facility | 2009-09-30 | Drilling/Alteration | No Violations Noted | drilling commenced/E&S ok/ID&pits ok |
1844354 | Primary Facility | 2009-11-03 | Routine/Complete Inspection | No Violations Noted | equipped/E&S ok/tank&tag ok |
1855782 | Primary Facility | 2010-01-08 | Routine/Complete Inspection | No Violations Noted | equipped/E&S ok - site being backfilled/tag ok |
1895061 | Primary Facility | 2010-06-29 | Complaint Inspection | No Violations Noted | Well is equipped for production. Well tag in place. |
1897248 | Primary Facility | 2010-07-07 | Complaint Inspection | No Violations Noted | Inspection conducted with oil & gas inspector Rick Hoover and operator representative Mike Gatsky. |
1905945 | Primary Facility | 2010-08-12 | Routine/Complete Inspection | No Violations Noted | Inspection conducted as a follow up to compliance assistance (complaint) inspection of 7/7/10. Well tag in place. Well is equipped for production. Tank appears sound. Vegetated dirt dike around tank. Access road entrance is adequately rocked and stable. Work pad on site is stabilized with rock and vegetation. Entire remainder of site was plowed and planted by surface owner. Additional rock has been installed on access road, ditch lines, and culvert inlet and outlets. Silt fence has been removed and disturbed areas along access road seeded and mulched. These areas are fairly well vegetated. Access road is stabilized. Work pad and portions of site not disturbed by farming operations are stabilized. Site is in compliance. No violations found. Planted fields adjacent to site show multiple signs of erosion. E&S issues in this area appear to originate from the fields. |
1922360 | Primary Facility | 2010-10-22 | Site Restoration | No Violations Noted | Drilling completed 10/5/09. Well tag in place. Well is equipped for production. |
1938707 | Primary Facility | 2010-12-03 | Routine/Complete Inspection | No Violations Noted | Producing gas. TAG, Tank, E&S o.k. Site graded and vegetation started |
2089197 | Primary Facility | 2012-08-01 | Complaint Inspection | No Violations Noted | At the time of this inspection access road appears adequately rocked, there appears to be evidence of a prior erosion concern with mud on township roadway. Well drilled in production. Brine tank appears sound. No accelerated erosion or sedimentation issues on well site. Recommend that operator place "Barrels" on containment in order to prevent a possible pollution event. Site restored. adequate vegetative growth on previously disturbed areas and pad adequately rocked. Recommend operator examine culvert ditch(s) and address issue of accelerated erosion and sedimentation concerns by catching and filter runoff in to culvert outlets. Department has plans to contact operator and discus possible measures to address increased runoff during heavy rain events; it appears some run-off maybe also be coming from surrounding farm field. Similiar complaint recvd July 2010 & looked at by Dep. Insp result pending operator response. 10/2/12 operator successfully implemented additonal bmp's and minimized ES. No sediment reported on raodwayl therefore, no violatio |
2094029 | Primary Facility | 2012-08-21 | Routine/Partial Inspection | No Violations Noted | Onsite meeting to discuss 8/1/2012 inspection and remedial measures to address ES concerns. Reps on Site: Doug Manners Mike Gatski Kevin EschbaughJamie Komonich. Onsite meeting to discuss efforts to address storm water run-off &sedimentation entering township road from well site access road. operator agreed to implement additional storm water management practices in order to minimize the potential for accelerated erosion and sedimentation issues. Tentative plan addition of: 24' compost sox placed in field along access road in order to prevent sedimentation from field along/onto access road,iversion ditch and sediment trap will be install near top of access road at turn,Water bars and additional culverts will be added along access road,relocate culvert and install sediment basin or check dam at outlet in order to prevent such a discharge, and Roadside ditch will be clean out, deepened and re-filled with rock. Operator agreed to send a description of final plan to dept prior to implementation. No viols noted. Operator actively addressing ES |
2104579 | Primary Facility | 2012-10-02 | Follow-up Inspection | No Violations Noted | Follow up to complaint and inspection on 8/15/12. Based on todays inspection and in light of recent rainfall events, it appears that operator has succesfully implemented permanent bmp's capable of resisting erosion and accelerated sedimentation. Therefore, no violations noted at thte time of this inspection.Department reccomends operator continue to mointor and maintain bmp's partilcuarlly after heavy rain events. |
2627040 | Primary Facility | 2017-08-10 | Routine/Partial Inspection | In Compliance with Schedule | On-site meeting held in response to access road concerns expressed by White Township representatives. Present personnel include White Township representatives Tim Willis, Chris Anderson, and Matt Genchur, Operator representative Scott Bower, and Department representative S. Foulk. |
2627076 | Primary Facility | 2017-08-15 | Administrative/File Review | In Compliance with Schedule | Admin inspection in response to inspection record 2627040.
Operator representative Spencer Johnson contacted the Department via phone. In order to prevent any potential pollution events from occurring, maintenance of the access road is scheduled to begin Friday 8/18. As a result of the concerns expressed in inspection record 2627040, the operator will continue to routinely monitor and maintain the access road as necessary. The operator anticipates plugging of the well. Upon plugging, the access will be restored unless the landowner wishes for it to remain. |
2631596 | Primary Facility | 2017-08-23 | Administrative/File Review | In Compliance with Schedule | Admin inspection in response to inspection record 2627040.
Operator representative Spencer Johnson notified the Department via email that E&S controls are scheduled to be maintained on Monday, August 28, 2017. |
2631600 | Primary Facility | 2017-08-29 | Administrative/File Review | In Compliance with Schedule | Admin inspection in response to inspection record 2627040.
Operator representative Spencer Johnson notified the Department via email that E&S controls are scheduled to be maintained on Wednesday, August 30, 2017. This has been postponed by two days (refer to inspection record 2631596). |
2636162 | Primary Facility | 2017-09-12 | Administrative/File Review | In Compliance with Policy | Admin inspection in response to inspection record 2627040.
Operator representative Spencer Johnson provided pictures to the Department of the access road improvements recently implemented by the Operator. |
2817764 | Primary Facility | 2018-12-20 | Routine/Complete Inspection | No Violations Noted | Well appears to be in good working condition. |
For data sources see[7]