If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36557 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.491687,"lon":-79.24925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Black Lick Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: JAMES E HILL 9 | |
License Status: | |
Spud Date: 2009-07-27 | |
Permit Date: 2009-05-14 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.491687 | |
Longitude: -79.249250 |
Date | Event |
---|---|
2009-05-14 | New Permit Application |
2009-07-27 | Performed Spud Operation |
2009-08-03 | Drilling Completion |
2009-08-10 | Perforation |
2009-10-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 878.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 9,226.00 | 365 | 8.00 | 365 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 6,427.00 | 364 | 99.00 | 364 | 0.00 | 0 |
2012 | XTO ENERGY INC | 4,746.00 | 366 | 36.00 | 366 | 0.00 | 0 |
2013 | XTO ENERGY INC | 3,841.00 | 365 | 28.27 | 365 | 0.00 | 0 |
2014 | XTO ENERGY INC | 2,643.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 1,977.60 | 365 | 28.79 | 365 | 0.00 | 0 |
2016 | XTO ENERGY INC | 1,472.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,245.00 | 334 | 13.00 | 334 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,246.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 4.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 34.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 5.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 5.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 15.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 15.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 15.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 75.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 11.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 49.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013 | XTO ENERGY INC | Produced Fluid | 32.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2014 | XTO ENERGY INC | Produced Fluid | 27.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 76.00 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1785369 | Primary Facility | 2009-04-14 | Routine/Complete Inspection | No Violations Noted | Well-site staked, not constructed. Request for waiver of distance requirement to Stewart Run. The E&S plan as compiled and drawn should minimize accelerated erosion and sedimentation and protect the stream from adverse impact, provided that the E&S plan is properly implemented and maintained. |
1819794 | Primary Facility | 2009-08-11 | Drilling/Alteration | No Violations Noted | At the time of inspection, well was completed to depth of 3,771 ft. Superior well performing hydro fracturing of well. Zones for fracture were 1st Bradford, lower belltarn, upper belltarn, Speechley. Well completed with 13 3/8¿ pipe to 40 ft., 9 5/8¿ pipe to 513¿ (215 sks class A), 7¿ pipe to 1054¿ (210 sks class A) and 4 ½ ¿ pipe to 3654¿(155 sks). At the time of inspection, no freeboard issues. Pit aligned with 20 mil plastic. No IW issues or E&S issues. Well sign and E&S plan located at the entrance way. E&S diagram matched site layout. |
1823388 | Primary Facility | 2009-08-19 | Routine/Complete Inspection | No Violations Noted | drilling complete, lined pits ok |
1848361 | Primary Facility | 2009-12-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, the well was drilled and in production with well head properly tagged. Sign and E&S plan were also onsite. Drilling was completed on 08/03/2009. Brine tank appeared sound in condition. Well site was seeded and mulched, but successful growth was not yet observed. Noted some concerns with filter fabric fence as sections of the fence appeared unstable. It is recommended this be addressed promptly in order to prevent any possible pollution event. No accelerated erosion or sedimentation concerns were noted in relation to well site or access road. It is recommended that in order to prevent E&S concerns with access road that culvert inlets and outlets are rocked. Also noted site was constructed with waiver approval due to distance requirements to Stewart Run. I did not observed adverse impact to the stream at the time of inspection. |
For data sources see[7]