Well ID: 37-063-36567 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.523238,"lon":-79.401712,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Conemaugh Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: GEORGE KELLY 5 | |
License Status: | |
Spud Date: 2010-01-06 | |
Permit Date: 2009-06-03 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.523238 | |
Longitude: -79.401712 |
Date | Event |
---|---|
2009-06-03 | New Permit Application |
2010-01-05 | Performed Spud Operation |
2010-01-14 | Drilling Completion |
2010-01-21 | Perforation |
2010-04-21 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 6,057.00 | 314 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 3,434.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 3,053.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 4,375.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 1,916.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 2,826.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 2,268.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,006.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 2,157.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 960.00 | 242 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1795751 | Primary Facility | 2009-05-06 | Routine/Complete Inspection | No Violations Noted | Well staked. |
1856351 | Primary Facility | 2010-01-15 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed at the time of the inspection. Well was not equipped for production. Above grade pits located onsite, they appeared to be in sound condition and they both had more than the required two feet of lined freeboard. Due to the proximity to the stream the fluids contained in the pits should be disposed of as quickly as possible. E&S plan implemented as outlined in the approved E&S plan located onsite. The operator should monitor the erosion control meausres and above grade pits until well development and final restoration activities are completed. |
1893165 | Primary Facility | 2010-06-08 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well was drilled, tagged, and in production. Drilling completed 1/14/10. Access road was stable. Brine tank sound. Site had not yet been restored. Noted that a section of pit liner was not properly secured. Observed ponding of water behind the above-grade pit(s) (btw pit and orange fencing/straw bale perimeter), did not appeared that pit was leaking or overflowed as more than two foot freeboard was maintained and there were no markings to indicate water level had dropped. Spoke with Construction Supervisor Dan Rice of PC, who addressed the concerns immediately, by starting the restoration process. A follow up inspection will be conducted in near future to examine final restoration activities. It is recommended that operator continue to closely monitor E&S controls until final restoration activities are complete. |
For data sources see[6]