If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36764 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.440655,"lon":-79.107145,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: TURM OIL INC | |
Well Pad ID: | |
Farm/Lease Name: E FOUST 1 | |
License Status: | |
Spud Date: 2010-02-05 | |
Permit Date: 2010-01-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.440655 | |
Longitude: -79.107145 |
Date | Event |
---|---|
2010-01-27 | New Permit Application |
2010-02-05 | Performed Spud Operation |
2010-02-11 | Drilling Completion |
2010-03-03 | Perforation |
2010-08-03 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | TURM OIL INC | 2,914.00 | 270 | 0.00 | 0 | 0.00 | 0 |
2011 | TURM OIL INC | 2,433.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | TURM OIL INC | 998.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2013 | TURM OIL INC | 1,253.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | TURM OIL INC | 838.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | TURM OIL INC | 597.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | TURM OIL INC | 867.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | TURM OIL INC | 456.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | TURM OIL INC | 526.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | TURM OIL INC | Fracing Fluid Waste | 600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | TURM OIL INC | Produced Fluid | 140.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | TURM OIL INC | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | TURM OIL INC | Basic Sediment | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2014 | TURM OIL INC | Produced Fluid | 70.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | TURM OIL INC | Produced Fluid | 70 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2016 | TURM OIL INC | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | TURM OIL INC | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1864702 | Primary Facility | 2010-02-22 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed at the time of the inspection. Two below grade pits were located onsite and both had more than the required two feet of freeboard. Observed no accelerated erosion & sedimentation with respect to the access road or well-site. The operator should evaluate all erosion controls as the snow melts for their integrity and functionality. |
1865722 | Primary Facility | 2010-02-23 | Drilling/Alteration | No Violations Noted | Based on record, permit was approved by 1/27/10. Well sign and E&S located at the entrance of site. According to Turm representative, well completed during the week of February 8th to the target depth. E&S controls were in place. Pit was aligned with plastic and Turm was in the process of dewatering the pit. At the time of inspection, no IW and E&S issues at the site. No signs of fluid or gas leakage around well head. Hydro frac was being scheduled for the well. |
2493010 | Primary Facility | 2016-06-14 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2579333 | Primary Facility | 2017-03-03 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
For data sources see[7]