Well ID: 37-063-36859 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.694567,"lon":-78.915103,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Green Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 147890 | |
Farm/Lease Name: BUTERBAUGH 8H | |
License Status: | |
Spud Date: 2010-06-03 | |
Permit Date: 2010-05-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.694567 | |
Longitude: -78.915103 |
Date | Event |
---|---|
2010-05-24 | New Permit Application |
2010-06-03 | Performed Spud Operation |
2010-06-18 | Drilling Completion |
2011-01-05 | New Permit Application |
2011-11-06 | Drilling Completion |
2012-08-30 | Perforation |
2012-10-19 | DEVIATED |
2013-01-15 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-08-28 | 2012-08-28 | 7,567 | 2,559,699 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Clean Volume (gals) | Carrier/Base Fluid | 91.69 | 100.00 | ||||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.29 | |||
Proppant (lbs) | Proppant | 8.31 | 9.14 | |||||
ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | |||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00667000 | ||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00009000 | ||
Carbohydrates | 95.00 | 0.00055000 | ||||||
Biocide EC 6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00122000 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00733000 | |||||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00185000 | ||
EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00724000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 25,901.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 247,558.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 168,734.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 115,191.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 97,209.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 80,793.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 65,956.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 59,376.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | Drilling Fluid Waste | 3,540.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | ATLAS RESOURCES LLC | Drilling Fluid Waste | 4,020.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 740.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 3,165.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 1.26 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 11,878.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 10,496.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 6,654.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 26.84 Tons | LANDFILL | 073 114 654 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,635.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 7,545.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,077.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,231.66 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 735.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 713.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,656.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 71.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 258.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 37.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 315.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 113.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 72.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 470.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 643.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1893004 | Primary Facility | 2010-05-15 | Drilling/Alteration | No Violations Noted | RUNNING 11 3/4 CASING |
1894917 | Primary Facility | 2010-06-24 | Drilling/Alteration | No Violations Noted | WAITING ON RIG |
1895002 | Primary Facility | 2010-06-29 | Routine/Complete Inspection | No Violations Noted | Marcellus well. Site created. Top hole drilled. Site ID sign in place. E&S plan on site. |
1906200 | Primary Facility | 2010-08-12 | Routine/Complete Inspection | No Violations Noted | Marcellus well. Site created. Top hole drilled. Site ID sign in place. E&S plan on site. |
1937973 | Primary Facility | 2010-12-16 | Drilling/Alteration | No Violations Noted | |
1939256 | Primary Facility | 2010-12-21 | Routine/Complete Inspection | No Violations Noted | Inspection conducted with oil & gas inspector Rick Hoover. |
1950378 | Primary Facility | 2011-02-15 | Routine/Complete Inspection | No Violations Noted | Marcellus well. Site created. Top hole drilled. Site ID sign in place. E&S plan on site. |
1959184 | Primary Facility | 2011-03-17 | Routine/Complete Inspection | No Violations Noted | Marcellus well. Site created. Top hole drilled. Site ID sign in place. E&S plan on site. |
2010688 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | During This inspection, well sign, Es plan, and PPC plan present. Rep Dan Hamlett onsite. Recommend operator place ESCGP-1 in box with ES plan, as unable to locate at time of inspection. Access road stable and adequately rocked. Pioneer drilling Rig 60 onsite rigging up, not yet drilling. Well drilled. Pad beneath rig lined with secondary containment, as well as all areas containing onsite liquids. One lined pit located onsite containing rainwater, adequate freeboard although dept recommends emptying prior to drilling. Bmp¿s installed and functioning according to plan; no accelerated erosion or sedimentation issues noted. No violations noted during this inspections. |
2015133 | Primary Facility | 2011-10-27 | Drilling/Alteration | No Violations Noted | |
2015138 | Primary Facility | 2011-10-25 | Drilling/Alteration | No Violations Noted | |
2016910 | Primary Facility | 2011-11-03 | Drilling/Alteration | No Violations Noted | |
2017853 | Primary Facility | 2011-11-09 | Incident- Response to Accident or Event | No Violations Noted | Site visit was in response to incident notification by Nick Staffieri (Chevron) to Ed Ritzer (PA DEP Water Qualiy Specialist Supervisor at 07:43 on 11-9-11.Spill occurred do to the following: Haliburton had been cementing the well. Well was being cemented at 8 gpm. This rate caused an overflow of oil based mud at the well head. This overflow was not immediately recognized. Multiple levels of containment were breeched and the mud made it to the surface of the pad. A small area of stone on top of felt lined material was contaminated with this material. Most of the mud had been removed at the time of inspection either by vac'ing or through absorbents. Crews continued to lay absorbent material on any spilled material that had not yet been removed. Absorbent material was then being removed for proper disposal. |
2019138 | Primary Facility | 2011-11-09 | Drilling/Alteration | No Violations Noted | |
2020929 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | Pending | Site visit was follow-up to 11-9-11 incident inspection to mud based oil spill. |
2034311 | Primary Facility | 2012-01-11 | Routine/Complete Inspection | No Violations Noted | During this inspection, Site Id sign located at access road entrance. ES plan, PPC and ESCGP-1 located onsite. Pioneer Rig 60 onsite actively drilling 9H , 8H previously drilled and top hole drilled on 10H. Pad lined with secondary containment, which appears structurally sound. Temporary bmp's installed/functioning as per ES plan. No accelerated erosion or sedimentation issue noted. Access road stable. Site gated and protected by security guard. No violations noted during this inspection. Although as noted previously, once containment is removed a follow up inspection will be conducted to evaluate what/if any residual impact resulted from 11-8-11 release. Operator shall continue to closely monitor and maintain all bmp's until final permanent site restoration is achieved. |
2037049 | Primary Facility | 2012-01-24 | Routine/Complete Inspection | No Violations Noted | During this inspection, Site Id sign located at access road entrance. ES plan, PPC and ESCGP-1 located onsite. Pioneer Rig 60 onsite actively drilling 9H,(Inspt Id # 2037025) 8H previously drilled (drill deeper) and top hole drilled on 10H. |
2045576 | Primary Facility | 2012-02-23 | Routine/Complete Inspection | No Violations Noted | Inspection result of follow up to Incident reported on this multi-well pad. Reported incident notification follow up response addressed in INSPT ID #2045561 for API 37-063-37020. |
2045586 | Primary Facility | 2012-02-23 | Follow-up Inspection | No Violations Noted | Site visit was follow-up to 11-9-11 incident. |
2061749 | Primary Facility | 2012-04-18 | Drilling/Alteration | Pending | |
2069240 | Primary Facility | 2012-05-03 | Follow-up Inspection | No Violations Noted | Follow up inspection to incident that occurred on 4/18/12 (Inspection ID #2061749), reported release of 3-5 bbl of freshwater/friction reducer (residual only) combination onto and outside of containment. Site ID Sign Present, Permit(s), ES plan, ESCGP-1, and PPC Plan Present. |
2087309 | Primary Facility | 2012-07-19 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, Well Id sign, ES plan, ESCGP-1, PPC plan present. |
2100845 | Primary Facility | 2012-09-13 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, Well Id sign, ES plan, ESCGP-1, PPC plan present. Drill deeper, TD 6/18/10. |
2109185 | Primary Facility | 2012-10-15 | Routine/Complete Inspection | No Violations Noted | Inspection result of request for restoration extension. Department received a request for restoration extension on October 4, 2012 (see attached) via email. As per regulation the current (9 month) restoration Deadline is October 26, 2012, based on completion of drilling of last well, on multi well pad, of 1/26/12. At the time of today's inspection, site ID sign, ES plan, ESCGP-1, permit, and PPC plan located onsite. Site monitored by 24-hr security. Wells drilled not yet in production. Site has been temporally stabilized with bmp's and/or rock. No accelerated erosion or sedimentation concerns noted. One below grade lined drill pit onsite. During this inspection Waste Management (independent contractor) and Chevron personnel were actively removing contents (liquid and cuttings) from pit via vac truck. Liner appears structurally sound and freeboard level maintained. No industrial waste concerns were noted at the time of this inspection. It appears that water and liner have been removed from freshwater impoundment. No viols. Restr ext granted |
2139088 | Primary Facility | 2013-02-06 | Routine/Complete Inspection | No Violations Noted | Inspection result of release of hydraulic fluid as noted on Inspection ID # 2137909 for Buterbaugh 9H. |
2171116 | Primary Facility | 2013-05-30 | Routine/Complete Inspection | No Violations Noted | |
2195092 | Primary Facility | 2013-07-24 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. |
2207195 | Primary Facility | 2013-08-27 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Marcellus.Site ID sign present, in compliance with Act 9 standards.Chevron representative Curtis Small on-site.At time of inspection, 8H drilled, but not producing. 9H, 10H also drilled, but not producing. Opr rep currently putting in line to prep wells for production.According to records, date of TD for 8H was 11/06/2011.Well tag present, legible. |
2227697 | Primary Facility | 2013-12-05 | Routine/Complete Inspection | No Violations Noted | Legibility of well tag compromised.Appears work recently performed on wellheads/prod equipment due to earth disturbance surrounding these areas.TD date for 8H was 11/06/2011.Three brine tanks on-site, all sound.Located w/in lined, steel containment unit with accumulation/ice observed.Dept recommends Opr properly empty and dispose of accum as per current regs.Dept previously granted restoration extension until 4/26/14.Site temp stabilized with mod veg growth observed. AR stable.Dept rec'ds Opr continue to monitor/maintain well site to ensure final restoration is achieved.At 0915, contacted Chevron rep C. Small via phone to discuss recent earth disturbance activities referenced above and well tag concerns.Mr. Small stated that lines were buried last week in order to vent annuli to prod tanks as annuli previously vented to temporary tanks. Dept rec'd area of earth disturbance is re-rocked to ensure stabilization is maintained.Mr. Small also stated new well tags will be installed immediately. |
2241810 | Primary Facility | 2014-02-03 | Routine/Partial Inspection | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. E&S/PCSM plan, PPC plan, ERP at access road entrance. Gated. |
2314424 | Primary Facility | 2014-10-17 | Site Restoration | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. E&S/PCSM plan, PPC plan, ERP, ESCGP-1 at access road entrance. Well site surrounded by security gate. |
2331465 | Primary Facility | 2014-12-22 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. E&S/PCSM plan, PPC plan, ERP, ESCGP-1 at access road entrance. Well site surrounded by security gate. |
2355947 | Primary Facility | 2015-03-30 | Administrative/File Review | In Compliance with Policy | Admin inspection. |
2627991 | Primary Facility | 2017-08-22 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. At time of inspection, wells 8H, 9H, and 10H are drilled and appear equipped for production. |
2826976 | Primary Facility | 2019-01-15 | Routine/Complete Inspection | No Violations Noted | On 1/15/19 at 1127 hrs., I conducted a routine inspection of Chevron Appalachia, LLC's Buterbaugh 8H well (API 063-36859) in Green Twp., Indiana Co. Snow cover prevented proper evaluation of site stabilization. The well pad appears to be restored and permanently stabilized. Three production fluid tanks are located within adequate secondary containment. Three wells are drilled and equipped for production. A site ID sign and permit box are posted at the site entrance. It is unclear as to whether or not well tags are affixed to any of the well heads as the perimeter fence to the well pad is locked. The Department requests that the operator provide either a combination or key to one of the locks to facilitate access to the site. This should be sent to the Department inspector listed on this report. There are no violations noted for this inspection. |