If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36861 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.514942,"lon":-79.367314,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Conemaugh Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: MAURICE M SINAN ET UX 8 | |
License Status: | |
Spud Date: 2010-08-23 | |
Permit Date: 2010-05-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.514942 | |
Longitude: -79.367314 |
Date | Event |
---|---|
2010-05-27 | New Permit Application |
2010-08-23 | Performed Spud Operation |
2010-08-28 | Drilling Completion |
2010-09-07 | Perforation |
2011-01-19 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 2,369.00 | 36 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 15,823.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 9,968.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 8,254.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 7,082.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 5,671.01 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 4,374.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 2,711.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 4,897.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1909842 | Primary Facility | 2010-08-24 | Drilling/Alteration | No Violations Noted | Pit aligned with plastic and secure fence was present. No freeboard issues. Well tag and E&S plan was present at the site. Conductor (13 3/8¿) set at 68 ft. Stratigraphy consisted of Sh, SS and coal. Coal/mine noted at 473 to 478 ft. PC setting 9 5/8¿ at 520 ft. Water noted at 475¿. Current depth was at 500 ft. E&S controls were present. Based on site conditions, no indication of IW issues at the site. No E&S issues at the site |
1909843 | Primary Facility | 2010-08-30 | Drilling/Alteration | No Violations Noted | Pit aligned with plastic and secure fence was present. No freeboard issues. Well tag and E&S plan was present at the site. E&S controls were present. Based on site conditions, no indication of IW issues at the site. No E&S issues at the site. Well was completed and PC was removing rig from the site. |
For data sources see[6]