Well ID: 37-063-37020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.694608,"lon":-78.915106,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Green Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 147890 | |
Farm/Lease Name: BUTERBAUGH 9H | |
License Status: | |
Spud Date: 2011-06-03 | |
Permit Date: 2011-01-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.694608 | |
Longitude: -78.915106 |
Date | Event |
---|---|
2011-01-10 | New Permit Application |
2011-06-03 | Performed Spud Operation |
2012-01-26 | Drilling Completion |
2012-08-28 | Perforation |
2013-01-15 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-08-28 | 2012-08-28 | 7,097 | 2,561,294 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00688000 | |
Biocide EC 6116A | Nalco | Biocide | Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | ||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00117000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00702000 | |||||
ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | |||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
Proppant (lbs) | Proppant | 8.83 | 9.76 | |||||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00007000 | ||
Carbohydrates | 95.00 | 0.00044000 | ||||||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.29 | |||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00148000 | ||
Clean Volume (gals) | Carrier/Base Fluid | 91.17 | 100.00 | |||||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00658000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 26,728.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 223,853.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 153,452.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 106,572.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 90,845.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 76,883.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 62,338.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 56,612.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 5,219.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 1.26 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 11,681.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 7,842.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 8,069.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 26.85 Tons | LANDFILL | 073 114 654 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,250.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 7,541.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,077.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,231.66 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 735.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 713.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,656.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 71.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 258.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 37.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 315.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 113.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 72.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 470.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 643.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1991782 | Primary Facility | 2011-07-27 | Drilling/Alteration | No Violations Noted | |
1997748 | Primary Facility | 2011-08-17 | Drilling/Alteration | No Violations Noted | |
2010692 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | During This inspection, well sign, Es plan, and PPC plan present. Rep Dan Hamlett onsite. Recommend operator place ESCGP-1 in box with ES plan, as unable to locate at time of inspection. Access road stable and adequately rocked. Pioneer drilling Rig 60 onsite rigging up, not yet drilling. Top hole drilled. Pad beneath rig lined with secondary containment, as well as all areas containing onsite liquids. One lined pit located onsite containing rainwater, adequate freeboard although dept recommends emptying prior to drilling. Bmp¿s installed and functioning according to plan; no accelerated erosion or sedimentation issues noted. No violations noted during this inspections. |
2017855 | Primary Facility | 2011-11-09 | Incident- Response to Accident or Event | No Violations Noted | Site visit was in response to incident notification by Nick Staffieri (Chevron) to Ed Ritzer (PA DEP Water Qualiy Specialist Supervisor at 07:43 on 11-9-11.Spill occurred do to the following: Haliburton had been cementing the well. Well was being cemented at 8 gpm. This rate caused an overflow of oil based mud at the well head. This overflow was not immediately recognized. Multiple levels of containment were breeched and the mud made it to the surface of the pad. A small area of stone on top of felt lined material was contaminated with this material. Most of the mud had been removed at the time of inspection either by vac'ing or through absorbents. Crews continued to lay absorbent material on any spilled material that had not yet been removed. Absorbent material was then being removed for proper disposal. |
2020926 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | No Violations Noted | Site visit was follow-up to 11-9-11 incident inspection to mud based oil spill. |
2030161 | Primary Facility | 2011-12-28 | Drilling/Alteration | No Violations Noted | |
2032454 | Primary Facility | 2012-01-06 | Drilling/Alteration | No Violations Noted | |
2034433 | Primary Facility | 2012-01-11 | Drilling/Alteration | No Violations Noted | |
2035949 | Primary Facility | 2012-01-11 | Routine/Complete Inspection | No Violations Noted | During this inspection, Site Id sign located at access road entrance. ES plan, PPC and ESCGP-1 located onsite. Pioneer Rig 60 onsite actively drilling, 8H previously drilled and top hole drilled on 10H. Pad lined with secondary containment, which appears structurally sound. All areas containing liquids and or hazardous materials secured on containment. Noted that pit levels are approaching 2ft of required lined freeboard. Department spoke to Company man(Brandon) onsite and recommended that pit be pumped in order to prevent a possible pollution event. Also spoke with Chevron Regulatory Compliance personnel via telephone regarding pit freeboard concern. Temporary bmp's installed and functioning properly. Operator shall continue to closely monitor and maintain pit freeboard levels as well as bmp's. No accelerated erosion or sedimentation issue noted. Access road stable. Site gated and protected by security guard. No violations noted during this inspection. |
2036075 | Primary Facility | 2012-01-19 | Drilling/Alteration | No Violations Noted | |
2036523 | Primary Facility | 2011-01-24 | Incident- Response to Accident or Event | No Violations Noted | |
2037025 | Primary Facility | 2012-01-24 | Incident- Response to Accident or Event | No Violations Noted | On Sun 1-22 at approximately 1530 a reported release of ~ 2 barrels of synthetic based drilling mud on to secondary containment located beneath rig. Today, spoke with Company man Brandon whom stated the release (he believes) was actually < 1 barrel occurred while pumping mud from frac tanks into shaker. Due to temperature change mud became viscous and clogged pump which back fed mud and ultimately lead to release onto containment. All released mud is believed to have been contained on secondary containment &immediately removed. No evidence of adverse environmental impact noted at time of this inspection. Based on above statement and visual inspection it appears that all mud was contained and immediately disposed of. Although some areas of the containment are missing berms and/or berms are in need of maintenance the area of release appears structurally sound and appears mud contained on containment. Follow up will be conducted upon removal of rig &containmnet to confirm mud release did not adversely impact grounds of commonwealth below contain |
2038170 | Primary Facility | 2012-01-26 | Drilling/Alteration | No Violations Noted | |
2045561 | Primary Facility | 2012-02-23 | Incident- Response to Accident or Event | In Compliance with Policy | Inspection in response to notification of incident involving the release of approximately 3 gals diesel from pump truck. Well site Id sign, ES, ESCGP-1, and PPC plan present. Well tags present. Well(s) drilled not yet in production. One pit located onsite with sufficient freeboard. Spoke with Chevron compliance rep Curtis Small, whom stated that it is believed a check valve on the pump truck failed and while sitting on a grade the diesel line released approximately 3-5 gals of diesel on pad until truck driver realized a line was leaking. Driver immediately addressed the faulty valve/line, and operator began immediate cleanup. A dike was dug to contain release and then a visual cleanup of diesel stained areas began. During today’s inspection, operator had removed contaminated soils and placed in roll off box located onsite, it was also noted that environmental services lab currently onsite collecting soil samples to ensure all contaminated soils have been removed. Awating sample results from operator. |
2045596 | Primary Facility | 2011-02-23 | Follow-up Inspection | No Violations Noted | Site visit was follow-up to 11-9-11 incident. |
2069243 | Primary Facility | 2012-05-03 | Routine/Complete Inspection | No Violations Noted | nspection result of follow up to incident that occurred on 4/18/12 on Buterbaugh 8H (Inspection ID #2061749), reported release of 3-5 bbl of freshwater/friction reducer (residual only) combination onto and outside of containment. (Follow up inspection ID #2069240) |
2087306 | Primary Facility | 2012-07-19 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, Well Id sign, ES plan, ESCGP-1, PPC plan present. |
2100838 | Primary Facility | 2012-09-13 | Drilling/Alteration | No Violations Noted | |
2100855 | Primary Facility | 2012-09-13 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, Well Id sign, ES plan, ESCGP-1, PPC plan present. Total Depth 1/26/12. |
2109188 | Primary Facility | 2012-10-15 | Routine/Complete Inspection | No Violations Noted | Inspection result of request for restoration extension. Department received a request for restoration extension on October 4, 2012 (see attached) via email. As per regulation the current (9 month) restoration Deadline is October 26, 2012, based on completion of drilling of last well, on multi well pad, of 1/26/12. At the time of today's inspection, site ID sign, ES plan, ESCGP-1, permit, and PPC plan located onsite. Site monitored by 24-hr security. Wells drilled not yet in production. Site has been temporally stabilized with bmp's and/or rock. No accelerated erosion or sedimentation concerns noted. One below grade lined drill pit onsite. During this inspection Waste Management (independent contractor) and Chevron personnel were actively removing contents (liquid and cuttings) from pit via vac truck. Liner appears structurally sound and freeboard level maintained. No industrial waste concerns were noted at the time of this inspection. It appears that water and liner have been removed from freshwater impoundment. No viols. Restr ext granted |
2137767 | Primary Facility | 2013-02-05 | Incident- Response to Accident or Event | In Compliance with Policy | ADMIN INSPT- At approximately 1355 operator call SWRO to report spill and then call WQS.As per operator at approximately 1300hrs a service truck was repairing a flat tire on truck on well site backfilling drill pit, when a hydraulic line broke on repair truck and discharged ~1 gallon of hydraulic fluid onto snow covered/frozen pad. Chevron rep stated that a containment dike has been built surrounding release. The area has been covered with secondary contain and foam triangles, the contaminated "snow" will be placed within dike and covered. The area is highly marked to prevent third party disturbance and or coverage due to additional snow. On 2/6/13, contractors plan to remove impacted soils, place in sealed drums until final dispostion. Per opr spill quickly contained, minimal environ impact. Written response will be provided on what happend and clean up measures undertaken. Follow up inspection will be conducted to determine extent of environ.impact and examine clean up measures as well as restoration of impacted areas |
2137909 | Primary Facility | 2013-02-06 | Follow-up Inspection | In Compliance with Policy | Incident occurred near impoundment where crews were utilizing soil pile to fill in drill pit. Appears when hydraulic line broke from truck it sprayed ~ a gallon of fluid over a broad area of frozen/compacted snow It does not appear that the fluid puddled up or ran off site, nor does it appear to have infiltrated into the frozen snow, although a follow up inspection (upon completion of clean up) will be conducted to ensure no adverse environmental impacts were sustained as a result of this minor release. As per onsite contracting crew (Penn Mechanical) plans were to removed contaminated snow pile (placed on and covered with secondary containment liner) and place into barrels prior to final disposition. According to reps onsite plans were to remove snow later this afternoon. Department cautioned operator that higher temperatures are in the weather forecast; therefore they should expedite the cleanup process in order to prevent the potential for a subsequent pollution event. |
2141385 | Primary Facility | 2013-02-12 | Follow-up Inspection | No Violations Noted | ollow up inspection to reported release of hydraulic oil on 2/5/13. Department currently waiting on "official" spill report from operator. At the time of this inspection, all impacted/contaminated snow has been successfully picked up and contained in barrels placed on secondary containment. No adverse environmental impact ( i.e. to soils, grounds of the commonwealth) noted at the time of today’s inspection. Site has been adequately (temporarily) stabilized, no accelerated erosion or sedimentation issues noted. No violations noted operator appears to have appropriately and adequately responded to release according to current department policy. Department will follow up with operator to ensure that materials are properly disposed of. |
2171114 | Primary Facility | 2013-05-30 | Routine/Complete Inspection | No Violations Noted | |
2195097 | Primary Facility | 2013-07-24 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. |
2207196 | Primary Facility | 2013-08-27 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Marcellus.Site ID sign present, in compliance with Act 9 standards.Chevron representative Curtis Small on-site.At time of inspection, 9H drilled, but not producing. 8H, 10H also drilled, but not producing.Opr rep currently putting in line to prep wells for production.According to records, date of TD for 9H was 1/26/2012.Well tag present, legible. |
2227703 | Primary Facility | 2013-12-05 | Routine/Complete Inspection | No Violations Noted | Legibility of well tag compromised.Appears work recently performed on wellheads/prod equipment due to earth disturbance surrounding these areas.TD date for 9H was 1/26/2012.Three brine tanks on-site, all sound.Located w/in lined, steel containment unit with accumulation/ice observed.Dept recommends Opr properly empty and dispose of accum as per current regs.Dept previously granted restoration extension until 4/26/14.Site temp stabilized with mod veg growth observed. AR stable.Dept rec'ds Opr continue to monitor/maintain well site to ensure final restoration is achieved.At 0915, contacted Chevron rep C. Small via phone to discuss recent earth disturbance activities referenced above and well tag concerns.Mr. Small stated that lines were buried last week in order to vent annuli to prod tanks as annuli previously vented to temporary tanks. Dept rec'd area of earth disturbance is re-rocked to ensure stabilization is maintained.Mr. Small also stated new well tags will be installed immediately. |
2241813 | Primary Facility | 2014-02-03 | Routine/Partial Inspection | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. E&S/PCSM plan, PPC plan, ERP at access road entrance. Gated. |
2314426 | Primary Facility | 2014-10-17 | Site Restoration | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. E&S/PCSM plan, PPC plan, ERP, ESCGP-1 at access road entrance. Well site surrounded by security gate. |
2331466 | Primary Facility | 2014-12-22 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Marcellus. Site ID sign present, in compliance with Act 9 standards. E&S/PCSM plan, PPC plan, ERP, ESCGP-1 at access road entrance. Well site surrounded by security gate. |
2627992 | Primary Facility | 2017-08-22 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. At time of inspection, wells 9H, 8H, and 10H are drilled and appear equipped for production. |
2826982 | Primary Facility | 2019-01-15 | Routine/Complete Inspection | No Violations Noted | On 1/15/19 at 1127 hrs., I conducted a routine inspection of Chevron Appalachia, LLC's Buterbaugh 9H well (API 063-37020) in Green Twp., Indiana Co. Snow cover prevented proper evaluation of site stabilization. The well pad appears to be restored and permanently stabilized. Three production fluid tanks are located within adequate secondary containment. Three wells are drilled and equipped for production. A site ID sign and permit box are posted at the site entrance. It is unclear as to whether or not well tags are affixed to any of the well heads as the perimeter fence to the well pad is locked. The Department requests that the operator provide either a combination or key to one of the locks to facilitate access to the site. This should be sent to the Department inspector listed on this report. There are no violations noted for this inspection. |
For data sources see[8]