If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37075 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.445011,"lon":-79.135522,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: HANCOCK 1 | |
License Status: | |
Spud Date: 2011-12-07 | |
Permit Date: 2011-03-25 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.445011 | |
Longitude: -79.135522 |
Date | Event |
---|---|
2011-03-25 | New Permit Application |
2011-12-06 | Performed Spud Operation |
2011-12-13 | Drilling Completion |
2011-12-27 | Perforation |
2015-10-14 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | PENN VIEW EXPLORATION CORP | 8,086.00 | 214 | 0.00 | 0 | 0.00 | 0 |
2013 | PENN VIEW EXPLORATION CORP | 8,886.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENN VIEW EXPLORATION CORP | 4,500.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENN VIEW EXPLORATION CORP | 3,306.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENN VIEW EXPLORATION CORP | 1,558.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | PENN VIEW EXPLORATION CORP | 792.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2018 | PENN VIEW EXPLORATION CORP | 1,089.00 | 273 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | PENN VIEW EXPLORATION CORP | Produced Fluid | 420.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 466 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 466.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 260.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 260 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 200.00 Bbl | ROAD SPREADING | |
2015 | PENN VIEW EXPLORATION CORP | Produced Fluid | 120.00 Bbl | ROAD SPREADING | |
2016 | PENN VIEW EXPLORATION CORP | Produced Fluid | 70.00 Bbl | ROAD SPREADING | |
2017 | PENN VIEW EXPLORATION CORP | Produced Fluid | 70.00 Bbl | ROAD SPREADING | |
2018 | PENN VIEW EXPLORATION CORP | Produced Fluid | 95.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2024522 | Primary Facility | 2011-12-05 | Drilling/Alteration | No Violations Noted | well sign present. spud called 12/5/11. |
2026871 | Primary Facility | 2011-12-12 | Drilling/Alteration | No Violations Noted | PC Rig #6 was contracted by Penn View (Jason Kline ¿ tool pusher). Well sign and E&S plan located at the access road. Filter fence was currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 50 feet. Intermediate pipe (7¿) was set at 1,095feet and was cemented with 200 sks of Class A. Plug was down at 2:15 am on 12/12/11with 15 bbls return. 80 sks of cement was grouted to the 9 5/8¿ pipe to bring the cement to surface. PC was currently drilling at 2,820 feet for the production string. The anticipated depth set at 4,950 feet. |
2026875 | Primary Facility | 2011-12-08 | Drilling/Alteration | No Violations Noted | PC Rig #6 was contracted by Penn View (Jason Kline ¿ tool pusher). Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8¿) was set at 22¿ (sanded in place). Water protection (9 5/8¿) was set at 211 ft. and cemented with 80 sks of Class A. Plug was down at 8:44 pm on 12/7/11with no return. Water was recorded at 50 feet. Phillips was setting up to drill the 7¿ pipe to 1095 feet. |
2028569 | Primary Facility | 2011-12-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well sign ES plan present. Well drilled not yet equipped for production. Spud date 12/6/11. Rig onsite rigging down. One below grade pit onsite, pit contents reaching 2ft freeboard, recommend operator remove material as soon as possible in order to prevent possible pollution event.Operator plans to dispose of pit (non-liquid) contents onsite according to regulation. No security fence located around pit at time of this inspection. Bmp's appear to be installed and functioning as outlined in Es plan. Access road ok, entrance adequately rocked. |
For data sources see[7]