If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37140 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.460994,"lon":-79.137747,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: HARBISON 5 | |
License Status: | |
Spud Date: 2013-03-15 | |
Permit Date: 2011-06-17 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.460994 | |
Longitude: -79.137747 |
Date | Event |
---|---|
2011-06-17 | New Permit Application |
2012-07-17 | Permit Renewal Application |
2013-03-14 | Performed Spud Operation |
2013-03-21 | Drilling Completion |
2013-04-10 | Perforation |
2013-07-25 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | PENN VIEW EXPLORATION CORP | 2,081.00 | 122 | 0.00 | 0 | 0.00 | 0 |
2014 | PENN VIEW EXPLORATION CORP | 4,233.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENN VIEW EXPLORATION CORP | 3,562.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENN VIEW EXPLORATION CORP | 2,487.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | PENN VIEW EXPLORATION CORP | 1,639.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENN VIEW EXPLORATION CORP | 2,292.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 180 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 180.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 245.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 245 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 150.00 Bbl | ROAD SPREADING | |
2015 | PENN VIEW EXPLORATION CORP | Produced Fluid | 115.00 Bbl | ROAD SPREADING | |
2016 | PENN VIEW EXPLORATION CORP | Produced Fluid | 40.00 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2150323 | Primary Facility | 2013-03-20 | Routine/Complete Inspection | No Violations Noted | Inspt result of spud notification. Site ID sign, drilling permit, E&S plan all on-site and adequate. Drilling rig on-site at time of inspection.Below-grade drill pit properly lined with more than the required two feet freeboard maintained.AR adequately rocked. Disturbed perimeter of site mulched for temporary stabilization.No accelerated E&S issues observed. Diversion ditch adjacent to drill pit was not constructed as outlined in E&S plan; however, ditch does not appear to be necessary at this time.Dept suggests that in the future any changes to the E&S plan be marked on plan prior to construction.Culvert at access road entrance damaged and silt fence observed to be structurally compromised.Dept recommends Opr repairs and maintains BMPs to to ensure optimal functioning of controls and to prevent any potential pollution events from occurring.Dept recommends Opr places all chemicals (i.e. barrels) on containment to prevent the occurrence of any pollutional incidents.Opr plans to encapsulate cuttings.Accompanied by WQSS April Weiland. |
2163075 | Primary Facility | 2013-04-25 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled, but not yet equipped for production. |
2185323 | Primary Facility | 2013-07-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well equipped for production. Well tag present. Brine tank sound, on gravel pad. Access road in good condition, rocked. |
2342808 | Primary Facility | 2015-02-10 | Routine/Complete Inspection | No Violations Noted | During site inspection, no E&S issues were present at the site. Gas well was in production |
2493038 | Primary Facility | 2016-06-14 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2518612 | Primary Facility | 2016-09-07 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
For data sources see[7]