37-063-37191

Well Details

Well ID: 37-063-37191
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: WINDY HOLLOW LLC 002
License Status:
Spud Date: 2011-12-21
Permit Date: 2011-09-16
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.461367
Longitude: -79.146744

For data sources see[1][2][3]

Well History

Date Event
2011-09-16 New Permit Application
2011-12-21 Performed Spud Operation
2012-01-04 Drilling Completion
2012-01-13 Perforation
2015-10-14 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 KRIEBEL MINERALS INC 0.00 0 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 7,435.00 302 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 7,846.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 8,359.00 327 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 5,567.00 328 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 9,983.00 335 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 8,037.00 333 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 7,560.00 326 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 6,512.00 331 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 KRIEBEL MINERALS INC Fracing Fluid Waste 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 KRIEBEL MINERALS INC Drilling Fluid Waste 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 KRIEBEL MINERALS INC Drilling Fluid Waste 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 KRIEBEL MINERALS INC Fracing Fluid Waste 1,450.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2029327 Primary Facility 2011-12-22 Drilling/Alteration No Violations Noted Kriebel had contracted Falcon. E&S controls and well sign were present. No pit freeboard and no E&S concerns were present at the time of inspection. Conductor pipe was installed to 42 feet (13 3/8¿ pipe) and sanded in. Mine protection pipe was installed to 210 feet (9 5/8¿ pipe). Mine shaft was reported at 165 feet to 175 feet. Cement basket was set at 126 feet. Mine protection pipe was cemented with 180 sks of Class A and was grouted on back side to surface. Water was encountered at 150 feet. Falcon was waiting for the 8 hour cement set up time.
2029942 Primary Facility 2011-12-28 Drilling/Alteration No Violations Noted Kriebel had contracted Falcon. E&S controls and well sign were present. No freeboard at pit and no E&S concerns were present at the time of inspection. Intermediate casing (7¿ pipe) was set at 1, 565 feet and was cemented with 275 sacks of Class A with 9 bbls of return. Plug was down at 10:26 am on 12/28/11. Superior had performed the cementing of the 7¿ pipe. Coal intervals were recorded at 410-415 feet and 500-510 feet. Water intervals were recorded at 150 feet and 500 feet. Falcon was waiting for the 8 hour cement set up. The anticipated DTD was set at 5,500 feet.
2032476 Primary Facility 2011-12-28 Routine/Complete Inspection No Violations Noted Site visit was due to spud notification.
2032661 Primary Facility 2011-01-04 Drilling/Alteration No Violations Noted E&S controls and well sign were present. No freeboard at pit and no E&S concerns were present at the time of inspection. Intermediate casing (7¿ pipe) was set at 1, 565 feet. An additional 80 sks of Type 1 was squeezed to the intermediate casing on 12/28/11. The DTD was 4,985 feet. Falcon was setting the production casing during the inspection.
2040807 Primary Facility 2012-02-01 Routine/Complete Inspection No Violations Noted E&S controls and well tag were present. No E&S concerns were present at the time of inspection. Gas well was in production.
2041080 Primary Facility 2012-01-30 Routine/Complete Inspection Violation(s) Noted Site visit was part of routine inspection.
2109212 Primary Facility 2012-10-11 Routine/Complete Inspection No Violations Noted E&S controls and well tag were present. No E&S concerns were present at the time of inspection. Gas well was in production.
2826529 Primary Facility 2019-01-14 Compliance Evaluation No Violations Noted Compliance Evaluation Inspection to inspection record #2041080 where a violation was issued against 78.56(3): impoundment not structurally sound, impermeable, 3rd party protected.

At time of inspection it appears pit observed in inspection record #2041080 has been removed. Site snow-covered but appears stabilized. Violation issued on 1-30-2012 has been corrected. Operator appears to be in compliance at this time.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2041080 631603 01/30/2012 2012-01-30 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
631603 280360 NOV - Notice of Violation
631603 287427 CACP - Consent Assessment of Civil Penalty Comply/Closed 2012-08-14 2012-08-14 $7,500.00 $7,500.00

For data sources see[7]

References