If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37191 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.461367,"lon":-79.146744,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: WINDY HOLLOW LLC 002 | |
License Status: | |
Spud Date: 2011-12-21 | |
Permit Date: 2011-09-16 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.461367 | |
Longitude: -79.146744 |
Date | Event |
---|---|
2011-09-16 | New Permit Application |
2011-12-21 | Performed Spud Operation |
2012-01-04 | Drilling Completion |
2012-01-13 | Perforation |
2015-10-14 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | KRIEBEL MINERALS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 7,435.00 | 302 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 7,846.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 8,359.00 | 327 | 0.00 | 0 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 5,567.00 | 328 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 9,983.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 8,037.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 7,560.00 | 326 | 0.00 | 0 | 0.00 | 0 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | 6,512.00 | 331 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | KRIEBEL MINERALS INC | Fracing Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | KRIEBEL MINERALS INC | Fracing Fluid Waste | 1,450.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2029327 | Primary Facility | 2011-12-22 | Drilling/Alteration | No Violations Noted | Kriebel had contracted Falcon. E&S controls and well sign were present. No pit freeboard and no E&S concerns were present at the time of inspection. Conductor pipe was installed to 42 feet (13 3/8¿ pipe) and sanded in. Mine protection pipe was installed to 210 feet (9 5/8¿ pipe). Mine shaft was reported at 165 feet to 175 feet. Cement basket was set at 126 feet. Mine protection pipe was cemented with 180 sks of Class A and was grouted on back side to surface. Water was encountered at 150 feet. Falcon was waiting for the 8 hour cement set up time. |
2029942 | Primary Facility | 2011-12-28 | Drilling/Alteration | No Violations Noted | Kriebel had contracted Falcon. E&S controls and well sign were present. No freeboard at pit and no E&S concerns were present at the time of inspection. Intermediate casing (7¿ pipe) was set at 1, 565 feet and was cemented with 275 sacks of Class A with 9 bbls of return. Plug was down at 10:26 am on 12/28/11. Superior had performed the cementing of the 7¿ pipe. Coal intervals were recorded at 410-415 feet and 500-510 feet. Water intervals were recorded at 150 feet and 500 feet. Falcon was waiting for the 8 hour cement set up. The anticipated DTD was set at 5,500 feet. |
2032476 | Primary Facility | 2011-12-28 | Routine/Complete Inspection | No Violations Noted | Site visit was due to spud notification. |
2032661 | Primary Facility | 2011-01-04 | Drilling/Alteration | No Violations Noted | E&S controls and well sign were present. No freeboard at pit and no E&S concerns were present at the time of inspection. Intermediate casing (7¿ pipe) was set at 1, 565 feet. An additional 80 sks of Type 1 was squeezed to the intermediate casing on 12/28/11. The DTD was 4,985 feet. Falcon was setting the production casing during the inspection. |
2040807 | Primary Facility | 2012-02-01 | Routine/Complete Inspection | No Violations Noted | E&S controls and well tag were present. No E&S concerns were present at the time of inspection. Gas well was in production. |
2041080 | Primary Facility | 2012-01-30 | Routine/Complete Inspection | Violation(s) Noted | Site visit was part of routine inspection. |
2109212 | Primary Facility | 2012-10-11 | Routine/Complete Inspection | No Violations Noted | E&S controls and well tag were present. No E&S concerns were present at the time of inspection. Gas well was in production. |
2826529 | Primary Facility | 2019-01-14 | Compliance Evaluation | No Violations Noted | Compliance Evaluation Inspection to inspection record #2041080 where a violation was issued against 78.56(3): impoundment not structurally sound, impermeable, 3rd party protected.
At time of inspection it appears pit observed in inspection record #2041080 has been removed. Site snow-covered but appears stabilized. Violation issued on 1-30-2012 has been corrected. Operator appears to be in compliance at this time. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2041080 | 631603 | 01/30/2012 | 2012-01-30 | 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
631603 | 280360 | NOV - Notice of Violation | |||||
631603 | 287427 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-08-14 | 2012-08-14 | $7,500.00 | $7,500.00 |
For data sources see[7]