If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37292 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.434019,"lon":-79.131128,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: MACK 2 | |
License Status: | |
Spud Date: 2012-02-01 | |
Permit Date: 2011-12-28 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.434019 | |
Longitude: -79.131128 |
Date | Event |
---|---|
2011-12-28 | New Permit Application |
2012-02-01 | Performed Spud Operation |
2012-02-08 | Drilling Completion |
2012-02-15 | Perforation |
2015-10-14 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | PENN VIEW EXPLORATION CORP | 6,613.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | PENN VIEW EXPLORATION CORP | 5,541.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENN VIEW EXPLORATION CORP | 4,112.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENN VIEW EXPLORATION CORP | 2,376.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | PENN VIEW EXPLORATION CORP | 902.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENN VIEW EXPLORATION CORP | 532.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 255 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 255.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 300.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 300 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 110.00 Bbl | ROAD SPREADING | |
2015 | PENN VIEW EXPLORATION CORP | Produced Fluid | 95.00 Bbl | ROAD SPREADING | |
2016 | PENN VIEW EXPLORATION CORP | Produced Fluid | 70.00 Bbl | ROAD SPREADING | |
2017 | PENN VIEW EXPLORATION CORP | Produced Fluid | 30.00 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2040833 | Primary Facility | 2012-02-02 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (13 3/8¿) was set at 42¿ (sanded in place). First Class drilled to 200 ft. and noted high water bearing zones at 80 ft., 120 ft. and 160 feet. High water bearing zones during drilling caused a semi- loss of flow of drilling cuttings and water through the diverter pipe to allow water/drill cuttings to flow on back side of conductor pipe causing a release around the rig. First Class stopped drilling and cemented the backside of the conductor pipe with 5.2 sks of Class A. Plug was down at 4:00 pm on 2/2/12 with no return. First Class was going to allow the 8 hrs. Cement time for set up of cement prior to drilling to 300 ft. to set a water protection casing. April Wieland and March Maestra were on-site and noted the release and other site issues. |
2041103 | Primary Facility | 2012-02-02 | Routine/Complete Inspection | Violation(s) Noted | Site visit was due to spud notification. |
2041500 | Primary Facility | 2012-02-07 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water Protection pipe (9 5/8¿) was set at 295¿. Due to the potential of loss of circulation, cement basket was set at 42 feet. Pipe was cemented with 120 sacks of Class A with 8 bbls of return. Plug was down at 6:44 am on 2/3/12. Surface pipe (7¿) was set at 1,053 feet with 190 sacks of Class A with 5 bbls return. First Class Energy was currently drilling at 1, 570 feet. The anticipated total depth for the well was 4,640 feet. |
2041530 | Primary Facility | 2012-02-09 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). E&S controls and well sign were present. No freeboard or E&S issues were present at the time of inspection. Well drilling was completed. First Class was removed from the site. |
2043970 | Primary Facility | 2012-02-16 | Drilling/Alteration | No Violations Noted | Penn View had contracted Appalachian to frac well. E&S controls and well sign were present. No freeboard or E&S issues were present at the time of inspection. |
2048860 | Primary Facility | 2012-03-06 | Compliance Evaluation | No Violations Noted | Site visit was compliance evaluation from 2-2-12 violation. |
2131671 | Primary Facility | 2012-12-11 | Site Restoration | No Violations Noted | At time of inspection, well equipped for production. On-site brine tank appeared sound. Access road in good condition. Well site had required 70% vegetative growth. |
2461858 | Primary Facility | 2016-03-03 | Routine/Complete Inspection | No Violations Noted | Tag, tank, e&s ok. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2041103 | 631620 | 02/02/2012 | 2012-02-02 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
631620 | 280376 | NOV - Notice of Violation | Comply/Closed | 2012-03-06 | |||
631620 | 283012 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-04-25 | 2012-04-25 | $12,825.00 | $12,825.00 |
For data sources see[7]