X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-37374

Well Details

Well ID: 37-063-37374
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Pine Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147135
Farm/Lease Name: DUMM 3H
License Status: INACTIVE
Spud Date: 2012-05-11
Permit Date: 2012-04-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.611361
Longitude: -78.860808

For data sources see[1][2][3]

Well History

Date Event
2012-04-11 New Permit Application
2012-05-10 Performed Spud Operation
2012-09-02 Drilling Completion
2013-01-15 DEVIATED
2013-09-13 Perforation
2013-09-13 Performed Stage 1 of Stimulation
2013-09-13 Performed Stage 2 of Stimulation
2013-09-14 Performed Stage 3 of Stimulation
2013-09-16 Performed Stage 4 of Stimulation
2013-09-16 Performed Stage 5 of Stimulation
2013-09-16 Performed Stage 6 of Stimulation
2013-09-16 Performed Stage 7 of Stimulation
2013-09-17 Performed Stage 10 of Stimulation
2013-09-17 Performed Stage 8 of Stimulation
2013-09-17 Performed Stage 9 of Stimulation
2013-09-18 Performed Stage 11 of Stimulation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-13 2013-09-18 8,583 3,891,480

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30
CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.00244 0
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0075 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.03636 0
Proppant Chevron Applachia, LLC Proppant Crystalline Silica 14808-60-7 100 10.55 0
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00004000 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00709 0
EC 6116a Nalco Biocide 1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00763 0
Polyethylene Glycol 25322-68-3 60 0.01525 0
Dibromoacetonitrile 3252-43-5 5 0.00127 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.09058 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 89.45 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-09-13 1 Ottowa Sand 0 8,785 9,141
2013-09-13 2 Ottowa Sand 0 8,963 9,038
2013-09-14 3 Ottawa Sand 0 8,895 9,103
2013-09-16 4 Ottowa Sand 0 8,478 9,146
2013-09-16 5 Ottowa Sand 0 8,861 9,237
2013-09-16 6 Ottowa Sand 0 8,900 9,120
2013-09-16 7 Ottowa Sand 0 8,957 9,304
2013-09-17 8 Ottowa Sand 0 8,873 9,389
2013-09-17 9 Ottowa Sand 0 8,856 9,185
2013-09-17 10 Ottowa Sand 0 8,867 9,242
2013-09-18 11 Ottowa Sand 0 8,654 8,973

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 235.99 Tons LANDFILL 101397
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 3,780.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 18,300.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 22,885.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 30.92 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2018 CHEVRON APPALACHIA LLC Drilling Fluid Waste 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Synthetic Liner Materials 11.89 Tons LANDFILL 100172
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 6.92 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2065474 Primary Facility 2012-05-01 Drilling/Alteration No Violations Noted
2069282 Primary Facility 2012-05-03 Routine/Complete Inspection No Violations Noted t the time of this inspection, well site Id sign, permit, ESCGP-1, ES plan, and PPC plan present. Drilling permit issued 4/11/12. Noted minor ES changes on plan, field approved (i.e. curlex ditches, add compost sock, and rock ditch). Well not yet drilled.Well spudded for 5/2/12, later updated to 5/10/12. Access road stable. Bmp's installed and/or being installed as noted in Es plan. Site actively being constructed. Security guard located at site entrance. Fuel truck staged onsite located ontop bermed secondary containment. One unlined pit located onsite. Operator actively installing curlex to ditches. Soil pile has been hydro seeded. Recommended that rock be added to ditch surrounding soil pile in order to reduce the potential or accelerated erosion and sedimentation concerns after rain events. Pad actively being rocked. No accelerated erosion or sedimentation issues noted during this inspection. Operator shall continue to closely monitor and maintain all bmp's until final permanent restoration achieved.
2069452 Primary Facility 2012-05-15 Drilling/Alteration No Violations Noted
2071244 Primary Facility 2012-05-25 Drilling/Alteration No Violations Noted
2072375 Primary Facility 2012-05-24 Incident- Response to Accident or Event In Compliance with Policy Admin inspection- At approximately 830 I received report from Duty Office Vince Yantko of reportable release of diesel to secondary containment from a leaking filter. It appears that 3 1/2 barrels of diesel fuel leaked onto secondary containment. Operator plans to collected material and dispose of according to regulation. It appears operator is complying with current spill policy. As spill was promptly reported and immediate remedial actions were taken. OGI Rick hoover plans to follow up with a site inspection on this reportable release on Friday May 25, 2012.
2072377 Primary Facility 2012-05-29 Incident- Response to Accident or Event In Compliance with Policy Admin inspection- At approximately 1227 I received a message from Nick Staffieri (Chevron) of a 1qt oil spill onto ground from water truck on location. Operator plans to visual remove oil and impacted soils from pad and place in contained and properly dispose of according to regulator standards. Based on current spill policy, it appears operator is in compliance with current spill policy and is reporting (the release) the proper measures are being taken to contain/remove/dispose of release.
2072673 Primary Facility 2012-05-31 Drilling/Alteration No Violations Noted
2073243 Primary Facility 2012-05-31 Routine/Complete Inspection No Violations Noted During this inspection, Well sign, permit, ES plan, ESCGP-1, and PPC plan present. Twenty-four hour security present at location entrance. Access road and pad adequately rocked and maintained, no accelerated erosion or sedimentation issued noted at time of this inspection. Bmp's appear to be implemented and maintained as outlined in plan. Observed one lined (empty) impoundment located onsite, based on residue (water) line appears impoundment may have contained material(s) prior to this inspection. Highland drilling rig currently onsite drilling. Secondary containment in place beneath rig, which appears structurally sound. Cuttings are being contained onsite in roll off boxes. No IW issues observed. No violations noted at this time.
2074630 Primary Facility 2012-05-06 Drilling/Alteration No Violations Noted
2076637 Primary Facility 2012-06-14 Drilling/Alteration No Violations Noted
2078196 Primary Facility 2012-06-21 Drilling/Alteration No Violations Noted
2078406 Primary Facility 2012-06-21 Routine/Complete Inspection No Violations Noted During this inspection, Well sign, permit, ES plan, ESCGP-1, and PPC plan present. Twenty-four hour security present at location entrance. Access road and pad adequately rocked and maintained, no accelerated erosion or sedimentation issued noted at time of this inspection. Bmp's appear to be implemented and maintained as outlined in plan. Previously disturbed areas stablized with vegeative matting. Observed one full impoundment located onsite. Highland drilling rig currently onsite, rigging down. Drilling completed. Secondary containment in place beneath rig, which appears structurally sound. Cuttings are being contained onsite in roll off boxes. No IW issues observed. No violations noted at this time.
2087345 Primary Facility 2012-07-17 Routine/Complete Inspection No Violations Noted At the time of inspection, access road entrance paved. Well site ID sign, ESCGP-1, PPC and ES plan present. Security guard onsite. Access road stable with adequate rock. No accelerated erosion or sedimentation issues noted. Well site stabilized, appears temporary bmp's are functioning and routinely monitored and maintained. Previously disturbed areas temporarily stabilized with vegetative matting with observed growth. Well drilled not yet equipped for production. One (full) water impoundment located onsite. No violations noted during this inspection.
2092960 Primary Facility 2012-08-18 Drilling/Alteration No Violations Noted
2096827 Primary Facility 2012-08-28 Drilling/Alteration No Violations Noted
2100848 Primary Facility 2012-09-06 Drilling/Alteration No Violations Noted
2103508 Primary Facility 2012-09-27 Routine/Complete Inspection No Violations Noted At the time of inspection, access road entrance paved. Well site ID sign, ESCGP-1, PPC and ES plan present. Security guard onsite. Access road stable with adequate rock. No accelerated erosion or sedimentation issues noted. Well site stabilized, appears temporary bmp's are installed, functioning and routinely monitored and maintained according to plan. Previously disturbed areas (soil piles) temporarily stabilized with uniform observed vegetative growth. Well drilled not yet equipped for production. One (full) water impoundment located onsite appears structurally sound. No violations noted during this inspection.
2121856 Primary Facility 2012-12-05 Routine/Complete Inspection No Violations Noted
2129832 Primary Facility 2013-01-09 Drilling/Alteration No Violations Noted
2141367 Primary Facility 2013-02-12 Routine/Complete Inspection No Violations Noted At the time of inspection, site monitored by 24hr security. Site ID site, ES plan, ESCGP-1, PPC plan and permit located on access road entrance. Well drilled (TD 9/2/12) not yet fraced-well completion tentatively scheduled for July 2013, 9-month restoration deadline June 2, 2013. Site and access road snow-covered, although both appear adequately (temporarily) stabilized with vegetative covered and temporary bmp's. No accelerated erosion noted on either pad or access road. Observed that "freshwater" impoundment extremely full and frozen, department is recommending that operator continue to closely monitor and maintain impoundment as necessary in order to prevent a potential pollution event if "freshwater" breeches impoundment. No violations noted at the time of this inspection
2176755 Primary Facility 2013-06-17 Routine/Complete Inspection No Violations Noted Inspt in response to restoration extension request.
2204860 Primary Facility 2013-09-16 Routine/Complete Inspection No Violations Noted At time of inspection, well being frac'd. Frac'ing operations commenced on 9/13/2013.
2212491 Primary Facility 2013-10-09 Routine/Complete Inspection No Violations Noted At time of inspection, rig in process of being disassembled.Site ID sign on-site, in compliance with Act 9 standards. Drilling permit, E&S plan, ESCGP-1, and PPC plan located at access road entrance.Dept checked in with PIC Bobby and Safety rep Tony.Entrance to AR paved, remainder of road rocked, in good condition.Pad stabilized, surrounded by orange security fence.BMPs appear to be properly functioning.Single lined impoundment appears sound, contains minimal liquid contents, surrounded by orange security fence.Sand laying on black tarp near center of pad.Safety rep stated sand is unused frac sand that fell off machinery.Frac tanks not on secondary containment.Safety rep said tanks previously emptied, thoroughly cleaned, inspected, and currently awaiting removal from site.Minor erosion observed on middle left slope when standing at pad entrance.Minor gravel from this erosion observed at base of slope in rock-lined ditch.Safety rep is going to take immediate actions to ensure slope and ditch are maintained. Additional comments on paper copy.
2229505 Primary Facility 2013-12-16 Routine/Partial Inspection No Violations Noted At time of inspection, well frac'd, not yet equipped for production. Well tag present, legible.
2236738 Primary Facility 2014-01-16 Routine/Complete Inspection No Violations Noted At time of inspection, well frac'd, not yet equipped for production. Wellhead surrounded by gate. Well tag present, legible.
2252520 Primary Facility 2014-03-11 Administrative/File Review In Compliance with Policy Spill reported by Operator representative B A Lambie to SWRO at 1419. Call taken by Lynne Rupp (See Attached).
2252867 Primary Facility 2014-03-11 Incident- Response to Accident or Event In Compliance with Policy On-site inspt in response to admin inspt 2252520 for reported release of 5 gal diesel fluid to ground.
2286186 Primary Facility 2014-07-10 Routine/Complete Inspection Violation(s) Noted
2320110 Primary Facility 2014-11-05 Routine/Complete Inspection No Violations Noted At time of inspection, well frac'd, not equipped for production. Inactive status granted on 8/20/2009 and expiring on 8/20/2019. According to records, drilling occurred 5/11/2012-9/02/2012.
2427135 Primary Facility 2015-11-23 Site Restoration No Violations Noted At time of inspection, well drilled, not equipped for production. Inactive status granted on 8/20/2014 and expiring on 8/20/2019. According to records, drilling occurred 5/11/2012-9/02/2012. Well tag present, legible. Well surrounded by gate and cement barriers.
2627697 Primary Facility 2017-08-22 Routine/Complete Inspection No Violations Noted At time of inspection, well drilled and does not appear to be equipped for production. Regulatory Inactive Status granted on 8/20/2014.
2725281 Primary Facility 2018-05-02 Plugging(Includes Plugged/Mined Through) No Violations Noted Running in with coil tubing to drill out first plug.
2727383 Primary Facility 2018-05-08 Plugging(Includes Plugged/Mined Through) No Violations Noted Running in with coil tubing to drill out first plug.

Finished up plug, still have LEL on back side.

2738297 Primary Facility 2018-05-31 Routine/Complete Inspection In Compliance with Policy Inspection conducted in response to a Notice of Intent to plug a well received by Department on 4-13-18.

At time of inspection well does not appear to be plugged. Well head remains on site. Site covered by secondary containment liner. No production equipment on site (photo #1). One roll off box located on secondary containment on site. No plugging equipment on site. It does not appear that any earth disturbance has taken place at this time. Department could not locate E and S plan. Department contacted operator rep Nick Staffieri by phone. Left message. UPDATE 6-1-18 5:53: Mr. Staffieri contacted Department by email and stated that Curtis Small will contact Department later today. UPDATE 6-1-18 12:35: Mr. Small contacted Department and stated no earth disturbance has taken place on site. Mr. Small stated operator has met with landowner to ensure both parties are in agreement with final stabilization of site. The E and S plan is being developed and Department will be contacted when plan is on site.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2286186 700327 07/10/2014 2014-07-10 OGA 3220(A) - Failure to plug the well upon abandoning it. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
700327 313067 NOV - Notice of Violation

For data sources see[9]

References