Well Details

Well ID: 37-065-00995
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: McCalmont Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID:
Farm/Lease Name: AD BURKETT
License Status: Plugged and Abandoned
Spud Date: 1948-12-10
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.995130
Longitude: -78.987010

For data sources see[1][2][3]

Well History

Date Event
1949-01-13 Drilling Completion
2018-09-26 Begin Plugging
2018-11-05 Finished Plugging
2019-02-11 Reworked
2019-04-16 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 NATL FUEL GAS SUPPLY CORP 4189.00 365 0.00 0 0.00 0
1992 NATL FUEL GAS SUPPLY CORP 4201.00 366 0.00 0 0.00 0
1993 NATL FUEL GAS SUPPLY CORP 3661.00 365 0.00 0 0.00 0
1994 NATL FUEL GAS SUPPLY CORP 2273.00 365 0.00 0 0.00 0
1995 SENECA RESOURCES CO LLC 1983.20 359 0.00 0 0.00 0
1996 SENECA RESOURCES CO LLC 2349 365 0.00 0 0.00 0
1997 SENECA RESOURCES CO LLC 4072 365 0.00 0 0.00 0
1998 SENECA RESOURCES CO LLC 3380 365 0.00 0 0.00 0
1999 SENECA RESOURCES CO LLC 633 365 0.00 0 0.00 0
2000 SENECA RESOURCES CO LLC 2940 365 0.00 0 0.00 0
2001 SENECA RESOURCES CO LLC 2932 365 0.00 0 0.00 0
2002 SENECA RESOURCES CO LLC 3003 365 0.00 0 0.00 0
2003 SENECA RESOURCES CO LLC 1413 364 0.00 0 0.00 0
2004 SENECA RESOURCES CO LLC 1029 364 0.00 0 0.00 0
2006 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2007 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2008 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2009 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2010 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2011 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2012 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2013 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2014 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 SENECA RESOURCES CO LLC Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2781073 Primary Facility 2018-09-26 Routine/Partial Inspection No Violations Noted At the time of inspection, a Notice of Intent to Plug was received for plugging to begin today. The rig has not yet arrived on location, but some wooden blocks were onsite to make a platform and tubing was on a pipe trailer. A roll of containment was also onsite. The access road and location were stoned. The well was labeled. There as a slight smell of gas coming from the well. There was a permit sign at the edge of location and the E & S plan was inside. It was soaking wet however. E & S controls were in place.
2788321 Primary Facility 2018-10-11 Routine/Partial Inspection No Violations Noted At the time of inspection, Dawn Energy Service (DES) was onsite baling out the well. Well had been tagged on 9/26 at 2453'. Currently the well depth was at 2586'. TD is at 3344' based on the well record. A lined pit is dug out to the side of location.
2792577 Primary Facility 2018-10-17 Routine/Partial Inspection No Violations Noted At the time of inspection, Dawn Energy Service (DES) was onsite cleaning out the well. Progress is being made and they were down to 2730'. They gained several feet while I was onsite.
2797866 Primary Facility 2018-10-25 Routine/Partial Inspection No Violations Noted At the time of inspection, Dawn Energy Service (DES) was onsite cleaning out the well. Baling was taking place when arriving at the site. Progress is being made and they were down to 2832'.
2798176 Primary Facility 2018-11-05 Routine/Partial Inspection No Violations Noted At the time of inspection, the well was just getting filled with it's last cement plug. Attainable bottom was granted last week at 2844'. A 550' plug was added using 100 sxs cement. From there, 35 bbls gel was placed, with 2.5 sxs LCM. The 6" was perforated with 16 spots from 930' - 885'. The final cement plug was from 1315' up to a calculated top at 815' using 104 sxs of cement.
2804965 Primary Facility 2018-11-14 Routine/Partial Inspection No Violations Noted At the time of inspection, the well has been plugged. All of the equipment has moved moved off of location and a marker was set. Unsure if the plastic pipe was the post or if there was more to be done. Area was worked over by a dozer and access road was scraped to remove ruts. The dozer was still along the access road.
2822799 Primary Facility 2019-01-07 Administrative/File Review No Violations Noted

For data sources see[7]

References