X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-065-25268

Well Details

Well ID: 37-065-25268
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Porter Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: BLOSE MCGREGOR 2
License Status: ACTIVE
Spud Date: 2005-12-06
Permit Date: 2005-04-15
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.962011
Longitude: -79.207829

For data sources see[1][2][3]

Well History

Date Event
2005-04-15 New Permit Application
2005-12-06 Performed Spud Operation
2005-12-22 Drilling Completion
2006-02-01 Perforation
2006-11-16 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2005 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2006 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 4251 0 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 3,415.02 365 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 3,130.78 365 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 2,484.63 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 2,059.96 304 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 2,011.04 305 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 1,622.92 304 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 1,595.00 304 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 1,208.82 335 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 101.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 1,518.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 2,142.89 365 0.00 0 0.00 0
2019 DANNIC ENERGY CORP 954.99 304 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 DANNIC ENERGY CORP Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2009 DANNIC ENERGY CORP Produced Fluid 82.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 DANNIC ENERGY CORP Produced Fluid 26.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2012 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 DANNIC ENERGY CORP Produced Fluid 30.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 DANNIC ENERGY CORP Produced Fluid 20.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1499558 Primary Facility 2005-12-07 Drilling/Alteration No Violations Noted
1500591 Primary Facility 2005-12-13 Drilling/Alteration No Violations Noted
1502411 Primary Facility 2005-12-20 Drilling/Alteration No Violations Noted
1536031 Primary Facility 2006-05-16 Drilling/Alteration No Violations Noted
1538398 Primary Facility 2006-05-22 Complaint Inspection No Violations Noted
1545778 Primary Facility 2006-06-27 Routine/Complete Inspection No Violations Noted
1561933 Primary Facility 2006-09-06 Routine/Complete Inspection No Violations Noted
1827825 Primary Facility 2009-09-14 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References